An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status onMONALISA presented by D. Urner 6th stabilization day 9. June 09

  2. Progress on mechanical setup • Double bellow system:

  3. Active Double Bellow to compressed Air supply (~2.0 bar) SMC ECC-PNAL2 Controller SMC ITV1050 Pressure Regulator SMC PSE510 Pressure Sensor • Idea: Generated Force is proportional to sum of pressure in inner and outer bellow system. • Find Point where force is zero • Use commercial control system. Vent SMC PSE511 Pressure Sensor ~1.4 bar pressure Vacuum

  4. Progress on mechanical setup • Double bellow system: • development geared towards minimal force system • development with Platine Prcision Ltd. started Sep 08 • full assembly of double bellow to double flanges this week • shipped to Oxford by end of week

  5. FEA shows very high resonance frequencies 2cm aluminium plate bolted to M30 taped holes in Shintake table Entire structure made from aluminium. Bellows: actual bellows: stainless steel 316L flanges: stainless steel: 304L 1st mode frequency: 266Hz. 1st mode frequency:162 Hz. Mechanical Vacuum system:

  6. How to insert optics • Insert optics platform • rests on very thin aluminium floor • essential a square piece of carbon-fibre loaded peak (plastic) holding retro-reflectors • easy to change to different (optics) geometries

  7. Calibration Study “Calibration” = Where are these components located on their mounting plate? Shintake Monitor mounting plate QD0 mounting plate • Does system self-calibrate? • This means: calibration by making measurements at many locations. e.g: Photogrammetry does this • Can partially self-calibrate • Some DOF poorly determined • What is the effect of calibration errors? • Effect is to introduce a scale error into displacement measurements • Simulated a “minimal” calibration scenario: 1mm uncertainty in component locations 0.3% scale error for vertical motion

  8. Calibration Study “Calibration” = Where are these components located on their mounting plate? Shintake Monitor mounting plate QD0 mounting plate • What is the effect of calibration errors? • Effect is to introduce a scale error into displacement measurements • Simulated a “minimal” calibration scenario: • e.g vibrations with amplitude 1μm would be limited in reconstructed accuracy to 3nm from calibration • a long-term shift of 100 μm would be limited in reconstructed accuracy to 300nm 0.3% scale error for vertical motion 1mm uncertainty in component locations

  9. MONALISA at CLIC • Start with 3 vertical lines • launch heads will be produced for KEK and CLIC by end of year • Need vertical tubes, ideally of 200 mm diameter • Later add horizontal measurement • Need 200 mm horzontal tube • As much space at intersection as we can get.