An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Traditional Construction Locally established actions of construction project organizations

  2. Fundamental Traditional Construction Customer employs craft teams to construct a building Some customers also employ an architect

  3. Fundamental Traditional Construction CUSTOMER CUSTOMER ARCHITECT TRADE CONTRACTOR TRADE CONTRACTOR

  4. Fundamental Traditional Construction Depends on locally established technologies being used in ways expected and understood by craft teams Has produced many fine buildings Fails if designs require craft teams to go beyond the limits of their established technologies

  5. Pantheon in Rome

  6. Salisbury Cathedral

  7. Fundamental Traditional Construction Unable to cope with new technologies or customers demanding greater efficiency

  8. New Technologies • Structural engineering • Services engineering • Research and development • Manufactured products Leading to large numbers of specialised construction teams

  9. Demanding Customers • Fast construction • Firm completion date • Reliable quality • No defects • Good value • Fixed costs

  10. Developed Traditional Construction The industry’s response to new technologies and demanding customers

  11. Developed Traditional Construction GENERAL CONTRACTOR CUSTOMER OTHER CONSULTANTS DESIGN CONSULTANT TRADE CONTRACTOR SPECIALIST DESIGNERS

  12. Developed Traditional ConstructionStrengths • Works well when customer provides a clear brief • Designer relies on technologies within the competence of local general contractors • Competent teams undertake manufacturing, production and commissioning • Teams complete their own work and do not leave problems for others

  13. Developed Traditional ConstructionWeaknesses CONSTRUCTION TEAM DESIGN AND PRODUCTION FAILURES CONSTRUCTION TEAM INHERENT DIFFICULTY BOUNDARY RELATIONSHIP

  14. Project using Developed Traditional Construction The project is to construct a new hotel on a virgin site. The hotel has 300 guest rooms and the other spaces expected in a 5* hotel The building is 10 stories high with a steel structural frame, concrete beam floors and roofs, and high quality, pre-fabricated external cladding.

  15. Teams Team-days Brief 1 80 Design 18 730 Plan 3 200 Procurement 14 750 Manufacturing 5 150 Production 67 2950 Commissioning 7 140 TOTALS 115 5000

  16. For a project with 115 teams (N=115) Possible relationships = 115 x 114/2 = 6555 3646 of these do not occur Actual relationships 6555 - 3646 = 2909

  17. Largest number of teams in one time interval is 47 in 21st time interval They are constructing the external envelope, service cores, risers and main plant, the main entrance and vertical circulation Externally there is landscaping and external services are being installed The work is supervised by design teams 47 x 46/2 = 1081 possible relationships

  18. During the 21st time interval the following teams work simultaneously 3 out of 6 external envelope teams 5 out of 6 service core teams 5 out of 5 risers and main plant teams 4 out of 12 entrance and vertical circulation teams 2 out of 6 landscaping and external services teams 2 out of 3 contracts and payment system teams 2 out of 4 general contractor’s plan and control teams This gives a total of 23 teams with 253 relationships

  19. Established Relationships 2 Structure with 3 External envelope teams 6 Service core with 5 Risers and plant teams This is 65 established relationships Established Relationships Indicator ER=65/2909=0.022

  20. The relationship fluctuation indicator FE = 0.985 There is an overwhelming influence of boundary relationships throughout the project because of the small number of established relationships This is common with Traditional Construction Particularly when teams are provided by the lowest bidders

  21. Relationship Quality Indicator for established relationships ranges from 0.01 to 0.85 Total Relationship Quality Indicator 28.85/2909=0.0099 The few high values for individual relationships are hardly significant because there are only 65 established relationships out of 2909 actual relationships

  22. The project organisation is not overly complex There are 29 time intervals out of a potential maximum of 229 This is balanced by the congestion in the 21st time interval when 23 teams are working Relationships configuration complexity indicator = 0.88

  23. The past performance of the 115 teams over their previous 10 projects provides team Performance Variability Indicators which range from 0.10 to 0.50 Performance Variability Indicator Rp=0.24

  24. Historical records for projects using Developed Traditional Construction gives External Interference Indicator = 0.45

  25. Developed Traditional Construction Established Relationships ER=0.022 Relationship Fluctuation FE=0.985 Relationship Quality QR=0.0099 Relationship Configuration CR=0.88 Performance Variability Rp=0.24 External Interference I=0.45

  26. Varieties of Developed Traditional Construction • UK Architect design • USA Specialist contractor design • European Architect and Engineer design

  27. UK Architect Design Design stage STRUCTURAL SPECIALIST HEATING SPECIALIST ELECTRICAL SPECIALIST CUSTOMER ARCHITECT VENTILATION SPECIALIST CLADDING SPECIALIST

  28. UK Architect Design Production stage STRUCTURAL SPECIALIST HEATING SPECIALIST CUSTOMER GENERAL CONTRACTOR ELECTRICAL SPECIALIST ARCHITECT VENTILATION SPECIALIST CLADDING SPECIALIST

  29. UK Architect Design • Architect control of complete design • Nominated subcontractors • Quantity Surveyor role • Bills of Quantities • Cost control • Innovative design but inefficient projects

  30. USA Specialist Contractor Design - Design stage STRUCTURAL SPECIALIST ARCHITECT HEATING SPECIALIST ELECTRICAL SPECIALIST CUSTOMER GENERAL CONTRACTOR VENTILATION SPECIALIST CLADDING SPECIALIST

  31. USA Specialist Contractor Design – Production stage ARCHITECT GENERAL CONTRACTOR CUSTOMER CLADDING SPECIALIST ELECTRICAL SPECIALIST HEATING SPECIALIST STRUCTURAL SPECIALIST VENTILATION SPECIALIST

  32. USA Specialist Contractor Design • Overall design by architect • Detail design by specialists • Specialists sort out problems quickly • Stylish building spoilt by awkward junctions between technologies • Poor at dealing with innovative designs

  33. European Architect and Engineer Design -Design stage STRUCTURAL SPECIALIST HEATING SPECIALIST CUSTOMER GENERAL CONTRACTOR ELECTRICAL SPECIALIST ARCHITECT VENTILATION SPECIALIST CLADDING SPECIALIST

  34. European Architect and Engineer Design - Production stage ARCHITECT GENERAL CONTRACTOR CUSTOMER CLADDING SPECIALIST ELECTRICAL SPECIALIST HEATING SPECIALIST STRUCTURAL SPECIALIST VENTILATION SPECIALIST

  35. European Architect and Engineer Design • Scheme design by Architect • Engineer contractor selects specialist contractors • Detail design by specialist contractors • Clashes between architect’s and specialist contractors’ designs

  36. Developed Traditional Construction Works well if customers and construction companies use well established technologies and contractors have effective coordination systems This is difficult to achieve so developed traditional construction often fails and is being replaced by more developed approaches