1 / 13

MKUKUTA REVIEW AND EMERGING ISSUES FOR MKUKUTA II

MKUKUTA REVIEW AND EMERGING ISSUES FOR MKUKUTA II. ANNUAL NATIONAL POLICY DIALOGUE 19-25 Nov. 2009: Day 2: Friday 20 th Nov. 2009 Ms. A. Mwasha/Prof. A.V.Y. Mbelle PRESENTATION I: PROCESS. PROCESS. STRUCTURE OF PRESENTATION /ROAD MAP) PREPARATORY PHASE ASSESSMENT PHASE

rhull
Télécharger la présentation

MKUKUTA REVIEW AND EMERGING ISSUES FOR MKUKUTA II

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MKUKUTA REVIEWAND EMERGING ISSUES FOR MKUKUTA II ANNUAL NATIONAL POLICY DIALOGUE 19-25 Nov. 2009: Day 2: Friday 20th Nov. 2009 Ms. A. Mwasha/Prof. A.V.Y. Mbelle PRESENTATION I: PROCESS

  2. PROCESS STRUCTURE OF PRESENTATION /ROAD MAP) • PREPARATORY PHASE • ASSESSMENT PHASE • DRAFTING AND DIALOGUE PHASE • NATIONAL CONSULTATION • APPROVAL PHASE

  3. PREPARATORY PHASE GENESIS OF REVIEW • MKUKUTA I AND MKUZA I COMING TO AN END • NEED TO SET NEW TARGETS • TO ACCOMODATE NEW AND EMERGING CHALLENGES AND ISSUES SCOPE OF REVIEW • NATIONAL LEVEL • SECTOR LEVEL • LOCAL GOVERNMENT AUTHORITY LEVEL

  4. PREP.. ISSUES FOR REVIEW • GENERAL ASSESSMENT OF DEVELOPMENT IMPACT • SPECIFIC ISSUES FOR REVIEW • GROWTH AND DISTRIBUTIONAL ISSUES • GROWTH AGENDA – NEED FOR GROWTH STRATEGY • INSTITUTIONAL FACTORS IN IMPLEMENTATION • BUDGET COMPOSITION AND EXECUTION

  5. PREP… e) EFFECTIVENESS OF M&E FRAMEWORK AND IMPLEMENTATION f) ISSUES IN EXTERNAL RESOURCES g) ISSUES IN DOMESTIC RESOURCE MOBILIZATION h) HEALTH SERVICE COVERAGE

  6. PREP… PRINCIPLES OF REVIEW: • NATIONAL OWNERSHIP • LOCAL PARTNERSHIPS • STRENGTHENING CAPACITY • GOVERNMENT LEADERSHIP • TRANSPARENCY DELIVERABLES: CONCEPT NOTE AND REVIEW GUIDELINES

  7. PREP… REVIEW METHODOLOGY: A COMBINATION OF: • SPECIFIC ANALYTICAL STUDIES ON SUBSTANTIVE ISSUES • STRUCTURED GUIDING TOOLS FOR COLLECTING STAKEHOLDER’S VIEWS • CONSULTATIONS ON OUTPUTS PRODUCED BY ANALYTICAL STUDIES AND VIEWS COLLECTED FROM STAKEHOLDERS COORDINATION: MANAGEMENT AND IMPLEMENTATION OF REVIEW: THROUGH MMS/PER ARRANGEMENT

  8. ASSESSMENT PHASE • EXTENSIVE LITERATURE REVIEW – NATIONAL AND INTERNATIONAL • CONSULTATIONS • ANALYTICAL STUDIES • INITIAL DRAFTING

  9. DRAFTING AND DIALOGUE PHASE PROCESS • CONTINUE WITH DRAFTING • FURTHER CONSULTATIONS AND DIALOGUE WITH KEY STAKEHOLDERSSTATUS: • DRAFTING TEAM AND STEERING COMMITTEE HAVE BEEN FORMED • DESIGN CONCEPT FOR MKUKUTA/MKUZA II AND LONG TERM GROWTH PLAN (M) HAVE BEEN DEVELOPED • RESULTS MATRIX ALREADY DEVELOPED • FOR CLUSTERS WITH SUFFICIENT INFORMATION (CLUSTER II) DRAFTING HAS COMMENCED

  10. NATIONAL CONSULTATIONS PHASE • CONSULTATIONS DURING ANNUAL REVIEW (MKUKUTA/PER/GBS) • PREPARATIONS FOR STAKEHOLDER CONSULTATIONS READY: • CONSULTATION GUIDE • IDENTIFICATION OF LEAD INSTITUTIONS IDENTIFIED PLUS WORK PLANS APPROVED (CSOs, ACADEMIA, TRADE UNIONS) DELIVERABLE: DRAFT FRAMEWORK TO FEED BUDGET GUIDELINES

  11. APPROVAL PHASE OBJECTIVE: TO ENSURE THAT ISSUES EMERGING FROM CONSULTATIONS HAVE ALL BEEN INCORPORATED OTHER ACTIVITIES: PRINTING AND DISSEMINATION MDAs AND LGAs ALIGN THEIR RESPECTIVE SP AND MTEF/BUDGET WITH THE NEW STRATEGY

  12. STATUS • 8 STUDIES HAVE BEEN COMMISSIONED (EG. CLIMATE CHANGE, LOCAL STAKEHOLDER PARTICIPATION; 2 HEALTH SECTOR STUDIES; 2 LABOUR STUDIES) • 9 HAVE BEEN NEGOTIATED PENDING AWARD • 6 AWAITING NEGOTIATIONS AFTER TENDER BOARD APPROVAL BY NOVEMBER – END ALL STUDIES WILL HAVE BEEN COMMISSIONED.

  13. END NOTE THANK YOU FOR YOUR KIND ATTENTION AHSANTENI SANA

More Related