Piquet report 21/06 – 20/07

Piquet report 21/06 – 20/07. June 21-27 Sergey Filippov June 28-July 04 Luigi Li Gioi July 05-11 Rustem Dzhelyadin July 12-18 Tengiz Kvaratskheliya July 19-25 Yury Guz.

rianna
Télécharger la présentation

Piquet report 21/06 – 20/07

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Piquet report 21/06 – 20/07 June 21-27 Sergey Filippov June 28-July 04 Luigi Li Gioi July 05-11 RustemDzhelyadin July 12-18 TengizKvaratskheliya July 19-25 Yury Guz Yu. Guz

  2. June 21-28 data taking (delivered 77.7 /pb, recorded 72.0 /pb) June 29-July 03 MD July 04-08 technical stop July 09-13 re-commissioning with beam, recovery from power cut 10/07 July 14  resumed data taking Yu. Guz

  3. Before the technical stop Smooth data taking. Very few things to be mentioned: 1). Daniel have introduced a new SPD temperature panel, to be used in the checklist. 2). 21/06 the calibration farm analysis did not provide any plot into the presenter. Solved by rebooting the hist01 machine (Beat). 3). 27/06 the L0hadron errors in the emulator comparison appeared (more details in next slides) Yu. Guz

  4. Technical stop activities 4-8 July 1). 05/07/11 morning: ECAL CW studies: MV currents and pumping frequency measurements 05/07/2011. A noticeable decrease of the pumping frequency had been observed in PM/CWs closest to the beam. Details in Irina’s presentation today; 2). 05/07/11 12:00: HCAL emulator comparison problem since 27-June. For cr. 24 FEB11, solved by Marie-Noëlle and Cyril D. 05/07/2011: the two cables coming from the FEB#11 crate 24 moved from input 0 to input 3 on both TVB5 and TVB7 side A; 3). 05/07/11 evening: HCAL 137Cs calibration 05/07/2011 (HV recipes updated next day 06/07/2011). Details in the HCAL presentation today; 4). Several attempts to perform the SPD threshold scan during the technical stop, without success (?). Yu. Guz

  5. Power cut 10 July recovery - I • 1). LV/MV/HV system recovery after power cut: a reminder (the procedure is described in the Patrick’s presentation at the Calo piquet training 21-Oct-2009, http://indico.cern.ch/getFile.py/access?contribId=2&resId=0&materialId=slides&confId=70825) • check that the Agilents in D3 are powered and have output voltage OFF • make sure that all the equipment in our rack (B1B01) at the D1 balcony is powered: turbine of this rack, rectifiers, RCM crates, Ethernet switch (at the very bottom of the rack); • in case if 220 V AC power is absent on something of the above – call Laurent 162989(or DSS expert) to switch it back ON at TDM drawers • if the RCM crates are OFF –switch them ON manually • after that, check the system. DO NOT TRUST “GREEN” FSM STATE!!! Try toswitching some item ON/OFF via FSM; if it fails, restart the MARATON OPC server(s): • CADCSLV: via service+ on cadcs01w • INFDAI1: ask Beat to do it. • then proceed with MV and HV Yu. Guz

  6. Power cut 10 July recovery - II • 2). Problem at configuring TVBs: solved by Marie-Noëlle by restarting SpecsServer at ECDAQHVC1W and ECDAQHVA01W. • 3). the PRSHVC1 project got corrupt. Recovered from backup by Daniel. • the backup was of 01 February: had to manually add the changes introduced in April, namely reconnection of C1004B19D02 from Bd#5 to Bd#6, new HV recipe and slight modification of lbPRSHvMon.ctl script. Project backups probably have to be done more frequently (every technical stop?). • 4). Problem with LEDTSB @ HCAL side C: in 23 out of 26 outputs used in HCAL C, the timing shifted 1 BX earlier (T0Prev1). Not understood: simply introduced new settings corrected for that, and saved them as a DEFAULT recipe, • then encountered a subsequent problem: at CONFIGURE, old settings were being loaded into the module, although it was verified that the DEFAULT recipe itself contained new ones • solved by Luis by restarting the FSM’s PVSS00ctrl Yu. Guz

  7. L0hadron operation Crate24 FEB06, FEB11, FEB14since run 94341 27/06/2011 FEB11 errors fixed during TS by rearranging cables in TVB5 and TVB7 (side A) FEB06 & FEB14 errors gone by themselves Crate23 FEB07run 95946 14/07/2011 14/07/11: replacement of FEB07 and TVB was unsuccessful fixed next day by re-plugging the TVB cable into another output of FEB07 Crate24 FEB14 run 96291 18/07/2011 re-appeared, still pending The operation becomes unstable, we should keep an eye on it. Yu. Guz