1 / 56

Design-Construction Interface Dissonances

M S T H E S I S. Design-Construction Interface Dissonances. Presented By; Faisal Manzoor Arain. Research Objectives. To Assess the Professional Interfaces between Designer and Constructor. To Identify Potential Dissonances of Design & Construction Common Boundaries.

Télécharger la présentation

Design-Construction Interface Dissonances

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. M S T H E S I S Design-Construction Interface Dissonances Presented By; Faisal Manzoor Arain

  2. Research Objectives • To Assess the Professional Interfaces between Designer and Constructor. • To Identify Potential Dissonances of Design & Construction Common Boundaries. • To Provide Suggested Solutions & Recommendations. MS Thesis Presentation

  3. Research Scope & Constraints • Large Building Projects; (SR 20 Millions or more). • Selection Context; (Eastern Province of Saudi Arabia). • Selection of (Grade-2 or above) Construction Contractors. • Eminent Architectural Consultant Firms. MS Thesis Presentation

  4. Research Methodology Literature Review Development of Initial Questionnaire Development of list of dissonances (Guideline for Documentation) Pilot Study :Detail documentation of Selected Projects Development of Final Questionnaire Questionnaire Survey Data Collection Data Analysis Conclusions & Recommendations MS Thesis Presentation

  5. Pilot Study • Selection of Large Building Projects in Eastern Province. • Al-Rashid Tower (Al-Khobar) • AL-Hussaini Commercial Center. (Dammam) • AL-Subeaei Commercial Complex. (Al-Khobar) MS Thesis Presentation

  6. Al-Rashid Tower (Al-Khobar) MS Thesis Presentation

  7. Al-Hussaini Commercial Center (Dammam) MS Thesis Presentation

  8. Al-Subeaei Commercial Complex (Al-Khobar) MS Thesis Presentation

  9. Inference • Detail discussions with Professionals on Reality scenario. • Perception Variance in professionals. • Verification of Questionnaire. • No additional indication of Dissonances by Professionals on Pilot Projects. MS Thesis Presentation

  10. Professional Opinions MS Thesis Presentation

  11. Survey • Minimum required sample size. • Received Responses. • 48 responses for Statistical Analysis MS Thesis Presentation

  12. ResultsConsultants Responses MS Thesis Presentation

  13. ResultsConsultants Responses MS Thesis Presentation

  14. ResultsConsultants Responses MS Thesis Presentation

  15. ResultsSpearman Correlation MS Thesis Presentation

  16. ResultsDescriptive Statistics (Consultants Responses) MS Thesis Presentation

  17. ResultsDescriptive Statistics (Consultants Responses) MS Thesis Presentation

  18. ResultsDescriptive Statistics (Consultants Responses) MS Thesis Presentation

  19. ResultsMost Important Origins of Dissonances MS Thesis Presentation

  20. ResultsLeast Important Origins of Dissonances MS Thesis Presentation

  21. ResultsContractors Responses MS Thesis Presentation

  22. ResultsContractors Responses MS Thesis Presentation

  23. ResultsDescriptive Statistics (Contractors Responses) MS Thesis Presentation

  24. ResultsDescriptive Statistics (Contractors Responses) MS Thesis Presentation

  25. ResultsDescriptive Statistics (Contractors Responses) MS Thesis Presentation

  26. ResultsMost Important Origins of Dissonances MS Thesis Presentation

  27. ResultsLeast Important Origins of Dissonances MS Thesis Presentation

  28. ResultsCombined Evaluation MS Thesis Presentation

  29. ResultsCombined Evaluation MS Thesis Presentation

  30. ResultsDescriptive Statistics (Combined Evaluation) MS Thesis Presentation

  31. ResultsDescriptive Statistics (Combined Evaluation) MS Thesis Presentation

  32. ResultsDescriptive Statistics (Combined Evaluation) MS Thesis Presentation

  33. ResultsSpearman Correlation MS Thesis Presentation

  34. ResultsMost Important Origins of Dissonances MS Thesis Presentation

  35. ResultsLeast Important Origins of Dissonances MS Thesis Presentation

  36. Conclusion • Designers mostly categorized as design Consultants. • Majority of firms are Saudi National. • Professional experience range between 5-10yrs. • Working relationship between contractor and designer considered as “good relationship”. MS Thesis Presentation

  37. Conclusion(Most Important) • Top Most Important Origin of Dissonances. MS Thesis Presentation

  38. Conclusion(Most Important) • Second Most Important Origin of Dissonances. MS Thesis Presentation

  39. Conclusion • Third Most Important Origin of Dissonances. MS Thesis Presentation

  40. Conclusion • Fourth Most Important Origin of Dissonances. MS Thesis Presentation

  41. Conclusion • Fifth Most Important Origin of Dissonances. MS Thesis Presentation

  42. Conclusion (Least Important) • Top Least Important Origin of Dissonances. MS Thesis Presentation

  43. Conclusion • Second Least Important Origin of Dissonances. MS Thesis Presentation

  44. Conclusion • Third Least Important Origin of Dissonances. MS Thesis Presentation

  45. Conclusion • Fourth Least Important Origin of Dissonances. MS Thesis Presentation

  46. Conclusion • Fifth Least Important Origin of Dissonances. MS Thesis Presentation

  47. Recommendations • First two Important origins can be diminished through “involvement of contractor in design phases” • Third & fourth most important dissonances origins can be handled through “Project management as individual professional service” • A neutral participant (Designer or Constructor) would be hired to bridge the schism between professional and working environment. MS Thesis Presentation

  48. Recommendations • Need of Establishing Numerous Professional Meetings during Project Phases. • Application of Construction Industry Model with necessary modification according to Saudi Arabian Construction Industry Requirements. • An Accrediting Body should be Established for surveillance in construction Industry Practices. MS Thesis Presentation

  49. Recommendations • Most Sophisticated & Updated Contemporary Professional Courses at institutions level. • Certification of Practicing Professionals on International Standards by Regional Certification Boards. MS Thesis Presentation

  50. Recommendations for Future Researchers • Design-construction interface in the context of Industrial projects and highways. • Considering the whole country’s construction industry as survey target. • Same survey considering the lower grade contractors and residential projects. MS Thesis Presentation

More Related