1 / 25

St. Luke Lutheran Church Building Task Force Presentation

Congregational survey results and recommendations for church building improvements, including accessibility to bathrooms, worship space, fellowship space, and class rooms.

Télécharger la présentation

St. Luke Lutheran Church Building Task Force Presentation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. St. Luke Lutheran Church Building Task Force Presentation

  2. Congregational SurveyNeeds/Recommendations for church building improvements Bathroom(s) Accessibility (To bathrooms/Fellowship Area/ Basement) Worship Space (size/layout) Fellowship Space (Size/Location) Class Rooms (Quantity/Size)

  3. Our Current Building Specifications • 4,451 sq/ft- main level • 3,740 sq/ft -lower level. • Seating Capacity- 160 • Limited permanent parking + street parking • Multiple levels with only stair access

  4. SMSQ Presentation

  5. Church Planning & Liturgical Architecture Celebrating 65 Years of Architectural Excellence St. Luke Lutheran Church - Townhall Presentation

  6. 2016.02.06 E x i s t i n g P l a n s M A I N L E V E L B A S E M E N T St. Luke Lutheran Church - Townhall Presentation 2017.04.23

  7. 2016.02.06 E x i s t i n g B u i l d i n g M A I N L E V E L B A S E M E N T St. Luke Lutheran Church - Townhall Presentation 2017.04.23

  8. 2016.02.06 V I R T U A L M O D E L E x i s t i n g B u i l d i n g view from northwest view from southeast view from southwest St. Luke Lutheran Church - Townhall Presentation 2017.04.23

  9. 2017.02.20 S c h e m e ‘ D . 2 ’ preferred option M A I N L E V E L B A S E M E N T St. Luke Lutheran Church - Townhall Presentation 2017.04.23

  10. Addition Remodel S c h e m e ‘ D . 2 ’ preferred option 2017.02.20 Addition Remodel M A I N L E V E L St. Luke Lutheran Church - Townhall Presentation 2017.04.23

  11. Addition Remodel Schemes ‘D.1’ & ‘D.2’ preferred option Remodel 2017.02.20 Addition B A S E M E N T St. Luke Lutheran Church - Townhall Presentation 2017.04.23

  12. 2017.02.20 S c h e m e ‘D . 2’ COST PROJECTIONS (by SMSQ) ________ Scheme ‘D.2’ ________ $192,280 1.Link addition (2 floors) $796,600 2.North Wing addition $70,000 3.Restrooms @ Gathering $234,040 4.Worship space remodeling 5.East entry addition $36,120 $107,650 6.Basement remodeling $215,500 7.Contingency (15%) $75,000 8.Kitchen equipment allowance Projected Cost (Scheme ‘D.2’): $1,727,190 St. Luke Lutheran Church - Townhall Presentation 2017.04.23

  13. Addition Remodel S c h e m e ‘ D . 1 ’ explored options 2017.02.20 M A I N L E V E L Addition Remodel St. Luke Lutheran Church - Townhall Presentation 2017.04.23

  14. 2017.02.20 V I R T U A L M O D E L ( a d d i t i o n i n y e l l o w ) S c h e m e ‘ D . 1 ’ view from southwest view from northwest view from northeast view from southeast St. Luke Lutheran Church - Townhall Presentation 2017.04.23

  15. THANK YOU for this opportunity to present our Work! St. Luke Lutheran Church - Townhall Presentation 2017.04.23

  16. Back to Task Force Presentation

  17. Riverwood Community Church • Located in Cannon Falls on 15 acres • Steel butler building with modern style front • 12,000sq.ft. (103ft x 128ft) • Seating for 250 in main sanctuary. • Est $110 to 120 per sq/ft to build (land and parking excluded)(Est $1.5M)

  18. Parking Lot Cost example • 2 acre lot (87,120 square feet)(140 car capacity) • 6’ of 3” screened as a base and 2” of Cl 5 road rock over that for an initial total of 8” = $21,888 initial approximate cost for rock • Other costs: • Purchase of Land • Land Preparation • Asphalt

  19. How will we be the people of God in this place? • How does this building hinder ministry? • How will changes to the building allow ministry to grow? • Are we a place that has room for anyone and everyone? • Or are we a place that wants to stay just as we are?

More Related