1 / 16

GSS Testing Organisation Structure

GSS Testing Organisation Structure. Bratislava Delivery Centre – GSS R3.2 & R4. Key Assumptions.

rigel-ellis
Télécharger la présentation

GSS Testing Organisation Structure

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GSS Testing Organisation Structure Bratislava Delivery Centre – GSS R3.2 & R4

  2. Key Assumptions • The Test Team will support the new release and previous release to end of solution pilot, i.e. 2 concurrent versions in Test Execution at a given time. E.g. Au Patch Testing on 2.1 is now handed over to GSAM so Test team focussed on R3 UK and 3.2 etc. • The exception to this is regression testing of live release of GSS to next release of DART. • Regression Testing will have two areas of focus: • Product ‘Upgrade’ Test: test an upgrade of existing country to the new release of Retalix code and configuration work, e.g. UK configuration works on R4 Codeset. • Integration Regression (see next slide) • DART backward compatibility: e.g. GSS R3 UK works with DART R4 • GSS Upgrade integration test: GSS UK on R4 codeset works with DART R4 (level of integrated regression of this state tbc. • Upgrade Testing of existing countries will be secondary priority to the main deployment test phase (i.e. tests associated with getting the new country live). However, this work should be planned to take place during the new country test window as any integrated testing with DART has a dependency on DART ITC enviro being available – this is only available until next release moves into test. E.g. if we need to integration test GSS 4 Au against DART R4 we must do this before DART moves R4.2 into integration enviro.

  3. Scope assumptions – integration testing Release 3.2 R3.2 DART 2.1 GSS Au 3.1 GSS Au 3.1 GSS UK Tested by Au Test Team Tested by BDC Test Team Release 4 R4 DART Assume all 2.1 stores have been upgraded to 3.1 3.1 GSS Au 4 GSS US (Fr) 4 GSS UK (COCO) 4 GSS AU (COCO) 3.1 GSS UK Tested by BDC Test Team Timing & resourcing of this testing to be agreed: Will countries always take each release or jump releases, e.g. ANZ makes no sense to take 4 as 4.2 comes next Tested by Au Test Team Backward compatibility Test Product & Tech Testing for New Deployment Testing and Upgrade Testing will be carried out in BDC unless specific enviro reasons for local testing New Deployment Integration Test Upgrade Integration Test

  4. Key Issues & Risks • The level of overlaps in the plan requires new resource as resource does not complete previous release in time for work on the next release to start. • This presents a significant risk as it is not possible to ramp up the numbers of resources required this quickly in BDC – this will need to be mitigated with other resource types. • Regression Testing strategy work is not yet complete – we have made some assumptions on resourcing levels for this for ANZ 3.2 release and US R4 but this is P20 at best. Work is needed to try and reduced the level of integrated regression testing. • Upgrade Testing – the level of Product Testing of an upgrade of an existing country is not yet factored into these estimates – we need to gain agreement that our principle is we want to go to the next release in all live countries immediately.

  5. Management Org Structure Chris Griffiths (From April) Peg R4 Test Lead High Level Regression Approach Potentially 1 role GSS Product & Regression Test Lead (incl QA) GSS US R4 Int Test Zoe Barrick (From April) DART 3.2 Int Reg (from April) UK 3.1 & RAP DART 4 Int Reg (from May) UK 3.1 & RAP AU 3.2 UKR4 COCO? AU R4 COCO? GSS 4/3.X Int Reg (from July?) UK Product Test Nick Carnell/ Peter Hrnciar To end May (UK) Product Test ANZ 3.2 Nick Carnell/ Peter Hrnciar End Jul (Au sup) BDC int Test Lead US R4 BDC offshre exe Lead BDC offshre exe Lead BDC offshore lead GSS R3 R4 Test Prep Matt Guest To end May R4 Test Exe Peter Hrnciar From May Au R4 COCO Product/Regression Prep & Exe Start May UK R4 COCO Product/Regression Prep & Exe Start May GSS R4 Note the regression resourcing has not been included in the detailed resource thinking yet Also approach to Upgrade testing to be agreed. R4.2 NZ Test Prep TBC (From April?) UK/Au/US R4.2 Regression Prep & Exe UK/Au R4 COCO Regression Prep & Exe Start May UK/Au R4 COCO Regression Prep & Exe Start May GSS R4.2 Note – Roles are subject to confirmation with the individuals concerned

  6. BDC Test Organisation Chart – UK R3 Execute Feb 07 Kyle Harbinson BDC Test Manager Chris Griffiths UK R3-R3 Test Lead UK Resource BDC Resource BDC Not Recruited Support Resource Technical Test Product Test Integration Test GSS Technical Test Lead Philippe Guiral Integration Test Lead Zoe Barrick GSS Product Test Execution Lead Nic Carnell Product Test Support Ilan Bomzon (Retalix) Defect Manager Peter Hrnciar (Tester) Integration Test Juraj Janosik (Tester) GSS Technical Test Branislav Tokoly (Jnr Tester) GSS Product Test Petr Hvalcak (Tester) GSS Product Test Silvia Marcova (Tester) GSS Product Test Barbora Stredanska (Tester) GSS Product Test Dalibor Buksa (Tester) Environment Manager Jan Dubravcik (Jnr Tester) Integration Test Marcel Prokop (Jnr Tester) GSS Technical Tester Karol Kiss (Suprt Jnr Tester) GSS Product Test Marian Mesik (Jnr Tester) GSS Prod Test Katarina Mancovicova (Jnr Tester) GSS Product Test Peter VerHoosel (BP) GSS Product Test Tomas Brisuda (Suprt Jnr Tester) GSS Product Test Michal Danek (Suprt Jnr Tester) Integration Test Support Neil McGregor (UK Based) GSS Product Test Melissa Baldry (2 weeks only) Integration Test Support Nick Welch Note – graded boxes mean resources are part time on this task

  7. BDC Test Organisation Chart – UK R3 Execute March 07 Kyle Harbinson BDC Test Manager Chris Griffiths UK R3-R3 Test Lead Technical Test Product Test Integration Test GSS Technical Test Lead Philippe Guiral GSS Product Test Execution Lead Nic Carnell Product Test Support Ilan Bomzon (Retalix) Integration Test Lead Zoe Barrick Defect Manager Peter Hrnciar (Tester) GSS Product Test Marian Mesik (Jnr Tester) GSS Product Test Silvia Marcova (Tester) GSS Product Test Barbora Stredanska (Tester) Environment Manager Jan Dubravcik (Jnr Tester) GSS Technical Test Branislav Tokoly (Jnr Tester) Integration Test Juraj Janosik (Tester) GSS Product Test Melissa Baldry (move mid March after patch 15) GSS Product Test Peter VerHoosel (BP) TBC Integration Test Marcel Prokop (Jnr Tester) GSS Product Jnr Tester 1 TBC from mid March Integration Test Support Neil McGregor (UK Based) Integration Test Support Nick Welch (until mid-March) Note – graded boxes mean resources are part time on this task

  8. BDC Test Organisation Chart – ANZ R3.2 Test Prep - March 07 Kyle Harbinson BDC Transition Test Manager Technical Test Product Test Integration Test GSS Product Test Execution Lead Nic Carnell Integration Test Prep TBC GSS Technical Test Lead Transition Philippe Guiral Environment Manager Jan Dubravcik (Jnr Tester) GSS Technical Test Branislav Tokoly (Jnr Tester) GSS Product Test Dalibor Buksa (Tester) GSS Product Jnr Tester2 TBC From mid march Test Prep Melisa Baldry From mid March • PT Prep – assume 2 weeks (script selection for Au and Au data set selection) • PT includes a regression test of a site upgrade from 2-3 (and associated test prep) • V&P Regression Test & Ops test required due to different configuration (e.g. Fuel PC) in Au • Integration Test – assumed to be done out of Au. Prep is to scope integrated regression of UK against DART 3.2 • Assumes no Retalix code changes, other than taking latest version of R3 from UK testing • Note – graded boxes mean resources are part time on this task

  9. BDC Test Organisation Chart – UK R3 Patch April - May 07 BDC Manager Manager TBC (P/T) From April Kyle Harbinson BDC Test Manager To end April Technical Test Product Test Integration Test GSS Technical Test Lead Anatolii Chekhivskyi (Snr Tester) (Start April) GSS Product Test Lead Peter Hrnciar (Snr Tester) GSS Product Test Execution Lead Nic Carnell Product Test Support Ilan Bomzon (Retalix) Integration Test Lead Neil McGregor Defect Manager Tester TBC (P/T) Environment Manager Jan Dubravcik (Jnr Tester) GSS Technical Test Branislav Tokoly (Jnr Tester) GSS Product Jnr Tester 1 TBC GSS Product Test Marian Mesik (Jnr Tester) GSS Product Test Tomas Brisuda (Support team) GSS Product Test Michal Danek (Support team) Integration Test Marcel Prokop (Jnr Tester) • Product Test – assume 4 days for a regression pass for scheduled patches, and ad hoc testing of urgent hot fixes. Any spare capacity used on R3.2 or 4 • Peter Hrnciar will transition into Product Test lead role during this period (he will perform defect mngt as well during transition) • Tech Test – assumes need to do regression V&P test for patches • Integration Test – assumes some integration testing of descoped items from ITC2 and integrated regression testing during • April. This team may not be required in May tbc. • Note – graded boxes mean resources are part time on this task

  10. BDC Test Organisation Chart – ANZ R3.2 April - May 07 BDC Test Manager (Manager) TBC From April Kyle Harbinson BDC Transition Test Manager To end April Integration Test Regression Lead Neil McGregor Technical Test Product Test Integration Test GSS Technical Test Lead Anatolii Chekhivskyi (Snr Tester) (April - May) GSS Technical Test Lead Anatolii Chekhivskyi (Snr Tester) (P/T) Product Test Lead Peter Hrnciar (Snr Tester) GSS Product Test Execution Lead Nic Carnell Product Test Support Ilan Bomzon (Retalix) Defect Manager Tester TBC (P/T) Int Test Tester TBC Environment Manager Jan Dubravcik (Jnr Tester) Int Test Junior Tester 7 TBC GSS Technical Test Branislav Tokoly (Jnr Tester) (until end May) GSS Product Test Dalibor Buksa (Tester) (April – end June) GSS Product Test Silvia Marcova (Tester) R3.2 DART- GSS 3 backward compatability test: significant risk to get these new resource by April timescale GSS Technical Test Lead Transition Philippe Guiral (Two Weeks) GSS Product Test Barbora Stredanska (Tester) GSS Product Jnr Tester 2 TBC GSS Product Test Peter VerHoosel (BP) TBC • Product Test – run a mini PT regression for Australia 3.2, focussing on high risk areas. If a full PT is required a full size team will be needed. Note also may be able to balance resources from UK patch testing. • PT includes a regression test of a site upgrade from 2-3 (and associated test prep) • V&P Regression Test & Ops test required due to different configuration (e.g. Fuel PC) in Au • Integration Test – DART 3.2-GSS 3.2 will be done in Au; DART 3.2-GSS 2.1 will be done in AU. Exception is DART 3.2 regression integration with UK 3.1 GSS which will be done in BDC. • Assumes no Retalix code changes, other than taking latest version of R3. • Note – graded boxes mean resources are part time on this task

  11. BDC Test Organisation Chart – ANZ R3.2 June (Support transition) BDC Test Manager (Manager) TBC Technical Test Product Test GSS Technical Test Lead Anatolii Chekhivskyi (Snr Tester) (April - May) GSS Technical Test Lead Anatolii Chekhivskyi (Snr Tester) (P/T) Product Test Lead Peter Hrnciar (Snr Tester) Product Test Support Ilan Bomzon (Retalix) Defect Manager Tester TBC (P/T) Environment Manager Jan Dubravcik (Jnr Tester) GSS Technical Test Branislav Tokoly (Jnr Tester) (until end May) GSS Product Test Dalibor Buksa (Tester) (April – end July) GSS Product Jnr Tester 2 TBC Support resource TBC Support resource TBC • Assume same structure as for UK support transition, i.e. 2 months of blended team with 2 supoprt resource and 2 PT resource. • Defect mngt, Tech test and PT mngt part time only (note need PT support role to enable PT lead to have bandwidth to manage to releases in parallel once one goes into support. • Note – graded boxes mean resources are part time on this task

  12. BDC Test Organisation Chart – US R4 Test Prep March - May 07 DART-GSS R4 Test Prep Lead TBC Technical Test Product Test GSS R4 IntTest Prep Lead Zoe Barrick (start April) GSS Technical Test Lead Anatolii Chekhivskyi (Snr Tester) (Start May) GSS R4 Test Prep Lead Matt Guest (Start Feb) GSS R4 Test Prep Juraj Janosik (Tester) (Start May) GSS Technical Test Branislav Tokoly (Jnr Tester) (until end May) GSS Prod Test Katarina Mancovicova (Jnr Tester) GSS R4 Test Prep TBC (from March) GSS R4 Test Prep TBC (from March) GSS R4 Test Prep TBC (from mid March) GSS R4 Test Prep Petr Hvalcak (Tester) (start March) GSS R4 Test prep Marcel Prokop (Jnr Tester) (Start April) GSS R4 Test Prep Martin Sturdy (feb)/ TBC (Laura Dix (start 5/3) GSS R4 Test Prep Nick Welch (from mid-March) GSS R4 Test Prep TBC Angela Akidele (start Mar) GSS Product Test Melissa Baldry (from mid April) GSS R4 Test Prep TBC (from March) Exact numbers of resource to support product test Cycle 1 in Israel tbc. Current assumption is 2 execution and 1 script updates due to GTM updates having been done independently of Retalix.

  13. Test Prep Product Test • Product Test Prep effort estimated at ~360 man-days effort. This is 9-10 FTEs including Matt who will lead the scripting for duration of March and April. • Similar number of conditions identified to UK R3 (2700 conditions took ~375 days vs. 2600 conditions estimated at 360 days for US R4) • Level of Product change significant • many CRs opening up new areas of functionality in Retalix (e.g. Flex Range, outdoor payment) • CRs span whole of the GSS product, e.g. Tax impacts a number of areas of the GTM (POS, BOS, Inbound, Reports). • 2 new forecourt controllers and one new EPS • Scope of Test Prep assumes Product Test prep for US R4 to early May. • Some of the team could then be used during May to update the GTM for Au R4, UK R4 regression tests – these are not currently factored into the resource model for prep or execution as not critical path. However, it is recommended that this is planned in to enable GSS to move to single code base as soon as possible for this release. Integration Test • Starts in April based on DART availability – Need to confirm Local availability for S2K/QB etc. • Integration Test Prep does include planning regression test of UK R3 GSS against R4 DART. AU TBC as assume this would be done from Au Test team?

  14. BDC Test Organisation Chart – US R4 June - Sept BDC Test Manager (Manager) TBC Product & Regression Lead Int Test lead (US Located) Technical Test Product Test Integration Test GSS Technical Test Lead Anatolii Chekhivskyi (Snr Tester) (Start May) GSS Product Test Lead Peter Hrnciar Snr Tester Int Test lead Snr Tester TBC (from May) Integration Test Lead TBC (Snr Tester) Defect Mngr Tester TBC GSS R4 Product Test Snr Tester TBC GSS Technical Test Branislav Tokoly (Jnr Tester) Integration Test Juraj Janosik (Tester) Environment Manager Jan Dubravcik (Jnr Tester) GSS R4 Test Prep Tester TBC GSS Product Test Petr Hvalcak (Tester) GSS Product Test Silvia Marcova (Tester) GSS Product Test Barbora Stredanska (Tester) Integration Test Marcel Prokop (Jnr Tester) GSS Product Jnr Tester 3 TBC GSS Product Test Marian Mesik (Jnr Tester) GSS Product Jnr Tester 1 TBC GSS Product Test TBC Jnr Tester 5 GSS Product Test TBC Jnr Tester 6 GSS Prod Test Katarina Mancovicova (Jnr Tester) Integration Test Jnr Tester 4 TBC Integration Test TBC (Jnr Tester) Exact team size for execution to be confirmed duriung prep phase – expect larger team due to addiitional scope (2FCCs etc) Team structure for US R4 pure scope only – does not shore regression testing Note – Roles are subject to confirmation with the individuals concerned

  15. BDC Test Organisation Chart –R4 June – Sep: Upgrade and Backward compatibility testing BDC Test Manager (Manager) TBC Product & Regression Lead Int Reg Test lead Technical Test Product Test Integration Test GSS Technical Test Lead Anatolii Chekhivskyi (Snr Tester) (Start May) TBC Int Test Tester TBC (from May) Integration Test Lead TBC (Snr Tester) Defect Mngr Tester TBC GSS Product Test TBC Jnr Tester 6 GSS Product Jnr Tester TBC Integration Test Tester TBC Environment Manager Jan Dubravcik (Jnr Tester) TBC GSS Product Test TBC Jnr Tester 6 GSS Product Test Silvia Marcova (Tester) GSS Product Test TBC Jnr Tester 6 GSS Product Test TBC Jnr Tester 6 GSS Product Test TBC Jnr Tester 5 Integration Test Jnr Tester TBC Integration Test Jnr Tester TBC This needs to be worked further – placeholder to indicate that work will be required on upgrade and backward compatibility testing for R4 against UK 3.1, Au 3.1(?), and Note – Roles are subject to confirmation with the individuals concerned

  16. BDC Test Organisation Chart – US R4 Oct-Nov (Pilot Suport Transition) BDC Test Manager (Manager) TBC Product & Regression Lead Int Test lead (US Located) Technical Test Product Test Integration Test GSS Technical Test Lead Anatolii Chekhivskyi (Snr Tester) (Start May) GSS Product Test Lead Peter Hrnciar Snr Tester Int Test lead Snr Tester TBC (from May) Integration Test Lead TBC (Snr Tester) Defect Mngr Tester TBC GSS Product Jnr Tester 3 TBC Integration Test Jnr Tester 4 TBC Environment Manager Jan Dubravcik (Jnr Tester) GSS Product Test Marian Mesik (Jnr Tester) GSS Product Test Silvia Marcova (Tester) GSS Product Test TBC Jnr Tester 6 GSS Product Test TBC Jnr Tester 5 Support Tester TBC Support Tester TBC Exact team size for Pilot support phase to be confirmed – P20 view to support resource planning only Note – Roles are subject to confirmation with the individuals concerned

More Related