1 / 20

Data Taking and R elated Works for R Scan above 3.8 GeV

Data Taking and R elated Works for R Scan above 3.8 GeV. Guangshun Huang University of Science and Technology of China. Group Meeting. R Scan Strategy ( B ig P icture). Charm baryons. 6%. 3.5%. Y(2175)?. Babar. P hase I : pre-study, 7 days

riona
Télécharger la présentation

Data Taking and R elated Works for R Scan above 3.8 GeV

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Data Taking and Related Works for R Scan above 3.8 GeV Guangshun Huang University of Science and Technology of China Group Meeting

  2. R Scan Strategy (Big Picture) Charm baryons 6% 3.5% Y(2175)? Babar • Phase I: pre-study,7 days • Machine study at 2.0, 2.5 and 4.2(4.6) GeV, MC tuning, … • Phase II: scan continuum region,100 days • 15 points in 2.03.6 GeV, step 100 MeV, 100k+ hadrons<3 GeV. • Phase III: scan resonance region, 2 months • 100 points in 3.84.6 GeV, 100kevents, step 2, 5,10, 20 MeV. • Single/separated beam for beam associated background study. • (108 hadrons at 4040, 4160, 4415 for radiative decay search?) to extend? R scan

  3. Desired Energy Points in 3.854.6 GeV • R measured by BESII (63) • R interpolated (42) 105 in total R scan

  4. Expected Instantaneous Luminosity and Data Taking Time for 100k Hadrons L(Ebeam) ∝ Ebeam-10(Ebeam>1890 MeV) R scan

  5. Energy Points in 3.854.6 GeV (1)105-point fine scan, 100k events each point, assuming that L(Ebeam) ∝Ebeam-10,Lmax= 0.65×1033cm-2s-1at 1.89 GeV R scan

  6. Energy Points in 3.854.6 GeV (2)105-point fine scan, 100k events each point, assuming that L(Ebeam) ∝Ebeam-10,Lmax= 0.65×1033cm-2s-1at 1.89 GeV 60 days 10 hr* 11 hr* R scan * Scale recent 4260 and 4360 data taking

  7. More Realistic: from XYZ data taking • From Weimin Song: R scan

  8. More Realistic: from XYZ data taking 1.035 0.78 pb-1/hr R scan

  9. More Realistic: from XYZ data taking • The plan: 105 energy points, 100k events  integrated luminosity 4.9  8.4 pb-1 each point, average 6.6 pb-1, total 695 pb-1; • To simplify the experiment, 8 pb-1will be taken at each energy (20% up on average); • Assuming the same rate of data accumulation, we need 8/0.78  10.3 hrs at each point, and total 8*105/0.78/24  45 days; • Assuming 1 hr beam tuning time at each point, we need 105 hrs  4.4  5 days; • J/, ’ fast scan for energy calibration, 6 times, 4 hrs each time, total 1 day; • Separated beam data taking, 2 points for 12 hrs, 1 point for 2 days, total 3 days; • Sum of above is 54 days. Remaining 6 days are reserved for trigger/BEMS study, maintenance, unexpected events; • In practice, 1 point per 12-hr BEPCII shift, 105 points = 52.5 days, but to be adjusted subject to actual situation. R scan

  10. Shift • Weekly chiefs from USTC: • Wenbiao, Haiping, Guangshun. • Record keeping: • One student per week, possibly with help from other institutions. • Shifters: • All of us. Highest priority during data taking! R scan

  11. Energy Calibration • Fit of J/, ’ fast scan: Bingxin R scan

  12. Webpage R scan

  13. Progress Plot “地铁运行图” • Initially all points grey out; • Points become solid after data taking; • Current point blinking. R scan

  14. Other Plots (illustrative only here) Date Ecm or point # online hadrons Lactual/Lplan Ecm or point Ecm or point R scan

  15. Summary Tables (examples here) Overall: Each point: R scan

  16. Data Quality Check • Preparation should start immediately: auto-mated scripts to generate plots; • Similar to Liang Yan’s work for 2012 scan. R scan

  17. TOF Calibration • Shengsen needs helper, ideally based at IHEP. Training should start soon. R scan

  18. Summary • We are going to take data soon; • Please pay full attention – get ready for it! R scan

  19. LundArlw tuning Must introduce auto-tuning mechanism: • tuning with the Professor package; • tuning with Ronggang's grid method: list of parameters; lot of MCs need to be generated in advance; • to include known cross sections/branching fractions in MC, just let LundArlw handle unaccounted parts?

  20. BaBar measurements using ISR

More Related