1 / 16

Radiation Work Discussion at CMS Week Workshop - October 2, 2019

Discussing radiation challenges and solutions for Muon systems at the CMS Week Workshop, highlighting the need for a common approach, radiation hardness, rate capability, and more. Presented findings are a starting point for future work.

rjesus
Télécharger la présentation

Radiation Work Discussion at CMS Week Workshop - October 2, 2019

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Phase-2 Radiation discussion GEM Workshop Oct 2 2019 Piet Verwilligen – INFN Bari Disclaimer: this is not an overview of work done but instead provides a starting point for discussion and work to be done CERN, Oct 2 2019

  2. https://indico.cern.ch/event/836166/ Let’sroll: Radiation WS during CMS Week Sophie Mallows (BRIL) Frank Hartmann (Upgrade Coord) • Huge work, notonly for usbutalso for the entireMuon community… • … need a common approachamong the differentMuonsystems • Need to scrutinizeeach part along the detection-trigger-readoutchain: • Rate capability of the detector • Radiationhardness of detector & front-end electronics • Availablebandwidth to sendhits to trigger • Combinatorics in EMTF / Segmentreconstruction • …

  3. https://indico.cern.ch/event/839944/ Why?HGCAL steadilyimproves design • V.3.7.18.0 reducedmaterial budget (reducedabsorptionlength • V.3.7.19.1 new envelope & supportstructure • More improvements to come ? Ourref: MU TDR (2016): OK! • Reduced dose 60 < R < 70 cm (innermostetapartition) • Slightlyhigher dose for R > 90 cm • ok for us, butthey do notwant to ask time and again …and want to knowwhatlimitswe can stand…

  4. https://cds.cern.ch/record/2283189/files/CMS-TDR-016.pdf Rate Capability • Mostrecentestimates: Muon Upgrade TDR (2016); howeverFlukasimulation with old HGCAL geometru (reuse of HE absorber) • Max hit rate (5E34 or 7.5E34 ?): 1.5kHz/cm2 (GE1/1) – 50kHz/cm2 (ME0)

  5. https://cds.cern.ch/record/2021453/files/CMS-TDR-013.pdf Rate Capability • Howeverwe do nothavemargin on rate capability right now! --- tests and R&D needed! • Standard GEM Foils: HV filter 10k-2.2nF-100k + 10MOhm for each HV segment (40) • Sustainedoperation: more efficientsparkprotection with 100kOhm – 1MOhm instead of 10kOhmbut V = IR thereforehigherfilterresistorswillresult in highervoltagedrop and hencelower rate-cap Irradiation of full chamber (2019) GE1/1 TDR (2012): Local irradiation Claim: 100MHz/cm2 Reality: 10kHz/cm2 Measured up to 400 kHz/cm2 Disclaimer:result 2B scrutinized by GEM DPG: e.g. assumes for conversion of bkg-rate to bkg-inducedcurrentthatallbkgparticles produce MIP-likesignal. Finalresultmight be worse.

  6. https://indico.cern.ch/event/836166/ Rate Capability • Furthermoreletusnotforgetthatthisissimulation! • Background simulationismuchimproved in the past 5 years, butstill no perfect data-mc agreement: cfr. GEM slice-test: up to 50% differenceat high eta! RoumyanaHadjiiska – Muon System Background

  7. RadiationHardness • Requirement for allmaterialsused for Chamberconstruction & FE Electronics • Cfr: Barrel RPC sufferleaks due to ageing of gaspipeexposed to non-negligible HF-concentration • Materials for chamberconstructiontested by Jeremie (PhDthesis) – believe OK • Electronicsreviewed for GE1/1 TDR, CMS TP, MU TDR – but I wouldleaveit to exp! • VFAT3 rad hard (100Mrad = 1MGy) max dose expected ME0 < 100kGy • I believeothercomponents are radhardaswell: FEAST, OH, … • What are the margins? Trigger BW / Trigger Combinatorics ? • Bandwidth of hits out of ME0: needdedicatedanalysis to understandmargins • a.f.a.i.k. ME0 segmentsneveradded to EMTF, so for Combinatoricswe are blind! • More studies are needed: more manpower & experiencedguidance welcome What else?

  8. Last word? • I seeit a little bit problematicthatweshouldgivenumbersatwhichourtechnology breaks down... • I seethis once more as a push to accepthigherradiationlevelswithoutgoodmotivation. • I believethat for the longivity of the GEM detectors we are on the safe side: our detectors are tested for several C/cm^2 expected to be accumulated over the HL-LHC period • limits on the particlerates come rather from the readoutpoint of view (rate capability) and the increasingcombinatorics in L1 Trigger logic • Howeveracceleratedradiationtests are not 100% reliable and oneshouldalwaystry to keep the accumulatedchargeaslowaspossible, for instancesee the efforts in the past of the CSC to fine-tune the gain in eachchamber to avoidtoo high gain (and charge) and the efforts of the DT colleagues to work atlower HV workingpoint to reduce the gain in the tubes.  • Therefore I am more in favour of givingnumbers to BRIL that are for example just 20 or 30% more thanwhatweexpect from previoussimulations. In the end, they just want to have an alarm. RoumyanaHadjiiska – Muon System Background

  9. Study HGCAL scenarios Work performed February – May 2019 Wooijn Jang, Yechan Kang, Piet Verwilligen CERN, Oct 2 2019

  10. Introduction • Changes in HGCAL to accomodate electronicshaslead to a reduction of number of absorberlayers in Back Hadronic from 12 to 10 layers • resulting in an effectivereduction of the totalabsorberthickness of 10 to 9 • First approach: reduce density of HGCAL steel to have 9 totalthickness - CMSSW_10_4_0 • Second approach: improved HGCAL geometryavailablenow - CMSSW_10_6_0_pre3 Upgrade TP Reduced

  11. Studiesperformed on «ReducedDensity HGCAL» in CMSSW_10_4 • Expected: due to reduction with 1 interactionlengthweexpect 30% lessshowercontainment more • Expected: no impact on muonfake rate (dominated by  decay in flight in tracker; ifdecay in calorimeters, willarriveanyway in muonsystem, independently of number of of HCAL • Observed: 200PU MinBias sample: 20% (avg)-30% (max) increase in simhits, digis & rechits in detectors behind HGCAL: ME0, GE1/1, ME1/1; • Increase 30-35% of segmentsin ME0, ME1/1 • Impact on muon reco after ID and PT cutsminimal Offline seems OK • Impact on trigger due to increasedcombinatoricsisdangerous • Observed: 0PU PionGun sample: no increase of fake rate

  12. ME0 Segments CMSSW_10_4_0 CMSSW_10_6_0_pre3 15% more segments in updated HGCAL 30% more segments in reducedHGCAL Strange dropsateta 2.2 & 2.5 resolved, curve issmoother and reflectsbetter reality! Segmentincreaseconfirmed (howeveronly 10%) likelyonly due to increase in muons However CSC keepsseeing 30% increase in segments in ME1/1! (seenext slide)

  13. CMSSW_10_6_0_pre3 CSC Segments ME1/2 ME1/1 30% more segments in reducedHGCAL 30% more segments in reducedHGCAL 30% segmentincreaseseen in CMSSW_10_4_0 confirmed in CMSSW_10_6_0_pre3

  14. CMSSW_10_6_0_pre3 GEM Hits 20-30% more digis, increaseconstant over wholeetarange 20-30% more background hits (e,p,K,) 15% more hitsTrend seen in ME0 not confirmed 20-30% hit increaseseen in CMSSW_10_4_0 confirmed in CMSSW_10_6_0_pre3

  15. Summary • 30% segmentincrease in ME1/1 and 20-30% hit increase in GE1/1 confirmed with more detailedHGCalgeometry • For ME0 initial 30% increaseseen in CMSSW_10_4_1 waslowered to 15% increase in more detailedHGCalgeometry • Inclusion of HGCalservices in Barrel-Endcap gap • Due to inclusion of the back flange (verticalshield) thatwasmissingbefore Lessonslearnt • GEANT helpedus to do a quickstudysincewehad no personsworking on FLUKA, neithercould BRIL giveusquickly an estimate of the fluxes • Howeverthiswas don in emergency mode and on best-effortbasis • Changes in GEANT geometry are implementedslowly and wecannotaffordthisresources intensive work for every epsilon change • Need to get back manpower on FLUKA • Waiting for v.3.7.19.1 to be in the webtool: • https://cms-project-fluka-flux-map-paas.web.cern.ch/

  16. Back Up CERN, Oct 2 2019

More Related