An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BSOE SPACE/FACILITIES COMMITTEEAgenda – July 23, 2009 • Purpose of Space/Facilities Committee • Overview of Buildings Used by BSOE • Overview of Space Issues Facing BSOE • Process & Timeline for Space Committee

  2. Purpose of Space/Facilities Committee • Holistic Assessment of Space & Facilities • Blend School-wide, Program, & Services Needs • BSOE Philosophy & Policies Governing Space • Oversight & Monitoring • Standards • Integration with Budget Planning • Priorities That Reflect Resource Availability • Link to Academic & Budget Planning

  3. Buildings Utilized by BSOECurrently Occupied Baskin Engineering (BE) Mathematics Relocation (Summer 2010) Basement Relocation of Printing Services & Mail Room (TBD) Security Separation of 2nd & 3rd Floors (TBD) Engineering 2 (E2) Economics Relocation (2015 or later?) Physical Sciences Building (PSB) Sinsheimer Laboratory Building (SH) Silicon Valley Center (SVC) Buildings 19 & 239 NASA Research Park (NRP)

  4. Buildings Utilized by BSOEPlanned for Occupation Delaware Building C (DEL) ADA Modifications Complete (2010) Engineering Research Labs – Phase 1 (2010) Engineering Research Labs – Future Phases (TBD) Bio-Medical Sciences & Engineering Building (BMSEB) Release of Funding for Construction Uncertain Beneficial Occupancy (TBD)

  5. Campus Space Planning Expectations Reduced Rate of State Capital Funding & Approvals Immediate Impact = Delay of BMSEB Slow Progress on Campus Infrastructure Upgrades Ten-Year Capital Plan (thru 2020) BSOE Growth From Math Relocation, BMSEB, Math Relocation BSOE Must Self-Fund Improvements & Renovations Potential Growth at Delaware & SVC (NRP Development)

  6. Issues for ConsiderationSchool-wide Issues 1. Contiguous Space for Departments & Services 2. Create/Expand Instructional Laboratories Bioengin, Biotech, Game Design, Robotics, Sr. Projects 3. Create/Expand Research Laboratories & Support Space Institutes/Centers, Individual Labs, Non-Senate Academic Offices 3. Guidelines for Space Allocation & Utilization Philosophy, Standards, Costs 4. Safety & Security Chemicals, Seismic Access, Theft, Vandalism, Terrorism 5. Storage Facilities & Capacity 6. Utility Infrastructure Continuity Electrical Power, Cooling, Back-Up Network Capacity & Redundancy

  7. Issues for ConsiderationBaskin Engineering 1. Utilization of Mathematics Release Space Negotiations with PBSci BME Relocation from PSB 2. Redistribution of Departments & Services AMS Relocation from BE 1st Floor TIM Relocation from E2 5th Floor (CITRIS) UGA Relocation from BE 2nd Floor ITS Relocation from BE 3rd Floor & E2 5th Floor (CITRIS) BSOE Student Organizations Relocation from BE 2nd & 3rd Floors 3. Basement Expansion Machine & Electronics Shop Operations Facilities & Receiving Operations

  8. Issues for ConsiderationEngineering 2 1. Use of CITRIS & QB3 Space by Departments 2. Data Center Expansion 3. Graduate Student Clusters 4. No Wet/Chemical Lab Capacity 5. Eventual Relocation of Economics (2015 or later?)

  9. Issues for ConsiderationSilicon Valley Center 1. NASA Dependent Impacts Access & Security Lease Arrangements Office Size & Sharing 2. Sub-Committee to Assess Allocations/Standards 3. Building 19—Offices and Classrooms 4. Building 239—Research Labs 5. Long-term use of NRP Facilities

  10. Issues for ConsiderationOther Issues 1. Delaware Occupation Planning Potential E-3 for Next 10 Years Identifying Potential Occupants Securing Resources for Renovations 2. Bio-Medical Sciences & Engineering Building Occupation Planning PBSci Exchange of Sinsheimer Space Allocation of Open Labs Equipping Shared Use Facilities