roden
Uploaded by
25 SLIDES
357 VUES
250LIKES

Mastering Photography Composition Basics: Simple Rules for Captivating Photos

DESCRIPTION

Explore essential composition rules like rule of thirds, lines, framing, and background to create stunning photographs. Enhance your skills and take your photography to the next level!

1 / 25

Télécharger la présentation

Mastering Photography Composition Basics: Simple Rules for Captivating Photos

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript

Playing audio...

  1. Composition Basics Mahlon Stacy my.photoshelter.com/mahlonstacy

  2. There are no rules for good photographs, there are only good photographs Ansel Adams

  3. Simple rules • Background & Foreground • Rule of Thirds (aka The Golden Ratio) • Lines • Curves • Framing

  4. Background & Foreground • Background is the foundation • Consider the background first • Simplicity yields better photos

  5. Background – yechhh!

  6. Background OK

  7. Rule of Thirds • Having your main subject off center generally yields more interesting photos • Divide the image into 9 equal parts • Place elements along lines or at interesections

  8. Rule of Thirds

  9. Rule of Thirds

  10. Rule of Thirds

  11. Lines & Curves • Vertical lines create tension • Horizontal lines create peace • Diagonal lines are dynamic… they draw the eye into the image • S-curves are graceful… they draw attention

  12. Vertical Lines

  13. Horizontal Lines

  14. Diagonal Lines

  15. Diagonal Lines

  16. Diagonal Lines

  17. S Curves

  18. S Curves

  19. S Curves

  20. Framing • Adding a frame adds depth to an image • Additional interest when frame associates with elements

  21. Framing

  22. Framing

  23. Framing

  24. References • Mastering Landscape Photography Alan Briot • Working the Light: A Landscape Photography Masterclass Joe Cornish, Cherlie Waite, David Ward, Eddie Ephraums • Taking your photography to the Next Level George Barr • http://photoinf.com/General/KODAK/guidelines_for_better_photographic_composition.html

  25. Nikon D80 18-135mm kit lens 70-300mm VR Zoom 50mm f1.8 E Series SB600 Speedlight Panasonic FZ30 Circular Polarizers ND Filters PS Elements 7 Premiere Elements 7 Adobe Lightroom Epson R340 Epson 1900 Photoshelter web site What I use

More Related