An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ® Life-Cycle Flood Risk Management  Getting Comfortable with Multiple Protection Mechanisms Alex C. Dornstauder Deputy Director Office of Homeland Security U.S. Army Corps of Engineers December 9, 2010 US Army Corps of Engineers BUILDING STRONG®

  2. Life-Cycle Risk Management

  3. Shared Flood Risk Management “ Buying Down the Risk “ Initial Risk Outreach Federal / State / Local Natural Storage Federal / State / Local Structural Federal / State / Local Non – Structural Federal / State / Local Risk Contingency Plans Federal / State / Local / Individual Building Codes State / Local Zoning Local Insurance Individual / NFIP Residual Risk All Stakeholders contribute to reducing risk !

  4. National Flood Risk Management

  5. Silver Jackets Inter-Agency Flood Risk Management • State-Led • State sets priorities for Interagency Federal support • Collaborative • Leverage resources: talent, data, funding • Facilitate integrated Post-Disaster solutions • Continuous, not project-specific • Life-Cycle Risk Reduction • Watershed Perspective • State teams facilitate regional, state-to-state flood risk management Active Inter-Governmental Flood Risk Management Team Fully Signed Charter Ongoing Effort to Develop Team As of: 6 DEC 2010

  6. Objectives and Actions • Synchronize Internal Programs and Activities • With external partners, align, coordinate, and leverage FRM activities at a national scale • Strengthen State and Regional Partnerships • Risk-Based Inspection and Assessment • Enable Risk-Reducing Mitigation by Managing and Aligning Existing Programs • Update Flood Emergency, Flood Fighting, and Rehabilitation to Account for Life-Cycle • Critical Infrastructure Protection and Resilience ( CIPR ) • Collaborate Risk Management with International Partners

  7. Case Study : Indiana Inundation Study • Joint development of flood inundation model using: • NWS flood predictions • USGS gage data • USACE depth damage curves • FEMA’s HAZUS data • Create real-time model views of flood inundation areas and depths of flooding • This model is being used by the Indiana Department of Natural Resources to manage and mitigate flood impacted areas and emergency response planning for NWS flood forecasts

  8. Case Study: Louisa #11, Iowa • Non-structural alternative to proposed structural repair • Required cooperation of levees public sponsor, county and state mitigation agencies, USACE, and NRCS • Combined over 300 acres of NRCS flood plain easements with significantly reduced structural repairs • 1200 acres of formerly protected area returned to floodway • RESULT: • Improved environmental habit • Increase flood storage capacity • Continued protection of important state road HOWEVER, similar efforts in other areas of IA and IL could not be completed, as post-event time was not sufficient - need support for pre-planning through Silver Jackets

  9. Revising Executive Order 11988on Floodplain Management • Draft Revised EO 11988 submitted to Council on Environmental Quality (CEQ) summer 2009 • Draft revision does not represent the Administration’s position • Federal Interagency Floodplain Management Task Force ( FIFM-TF ) re-established in early 2010 • FIFM-TF developing a 5-year work plan which will consider the need and sequencing for revising EO 11988 • Work plan will be based on existing federal government floodplain management activities, programs, executive task forces and orders, and input from listening sessions • Discussions ongoing to decide if EO 11988 will be revised

  10. ® Questions ? US Army Corps of Engineers BUILDING STRONG®