An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GBA 573 Consulting Glen Fields - Final Project Presentation

  2. GBA 573 Consultants What Sets CSI Apart... GBA 573 Consulting • Company Background • Located in San Diego, CA • 5 Engineering Consultants • Established in 2002 • Specialize in Facility Assessment, Strategy Development, and Project Management

  3. How Projects Get Started

  4. Overview • Project is to: • Perform an assessment at Disneyland • Optimize Maintenance and Reliability Program • Develop Customized Computer Reliability Software Program • Install Wireless Sensors to Monitor Equipment • Document Findings and Present to Management GBA 573 Consulting

  5. Deliverables • Deliverables of the Project are: • Assessment and Benchmark prior to Project Implementation • Equipment and Technology Matrix • Microsoft Project Schedule • Recommended Training Matrix • Identification and Documentation of Park Goals for the Condition Monitoring Program • Consultation of Work Flow Diagram for Optimized Implementation of Condition Monitoring Program GBA 573 Consulting

  6. Work Process People Skills Technologies WorldClass Management & Work Culture Maintenance Optimization GBA 573 Consulting

  7. Work process • Identify Issues That Affect Maintenance Work Process • Capture “As Is” Work Process • Develop “To Be” Work Process Diagram GBA 573 Consulting

  8. Work Processes: • The CMMS system is used to plan and schedule the work, track machine history, and to track cost and savings information. Some of the key goals are prioritization of WO’s, elimination of unnecessary PM’s, and program justification. • A key role of the IT group is the identification of the criticality of plant machinery so the work can be prioritized. Resources and technologies are assigned to plant assets based on equipment or systems importance to the production cycle. Performance of critical equipment is tracked and reported. • Condition Monitoring plays a key role in acceptance and certification of plant equipment. Formal processes have been established to insure PDM is used on new and reworked equipment, incoming oils are inspected for quality, IR is used before shutdowns, and root cause studies are performed on all critical equipment failures. Feedback loops are in place on all WO’s and regular meetings are scheduled to discuss critical issues. • Quality and Reliability are a way of life not a periodic process. GBA 573 Consulting

  9. Maintenance Optimization Feedback Work Process Designed for Maintenance Optimization What RM Equipment Failures Scheduled PM Tasks Work Execution Work Closeout PdM Equip. Condition Directed Feedback PAM Root Cause Analysis Identifies Equip. Condition GBA 573 Consulting

  10. Technology • Identify Which Rides at Disneyland are Critical • Based on the Criticality of the Ride, Assign Monitoring Technology • Integrate Information Into an Equipment and Technology Matrix • Install Monitoring Sensors on Equipment GBA 573 Consulting

  11. Periodic Diagnostic Data Diagnostic & Process Data Maintenance Histories & Records Data PDM Program Operator Log • ALERTING Data • TRENDING • ANALYSES Batch Testing & Inspection Data • COST BENEFIT • RECOMMENDATIONS • REPORTING Design & Historical Data Maintenance Engineering Planning & Maintenance Scheduling Operations Condition Based Maintenance Program Elements GBA 573 Consulting

  12. Technology • Recommended Condition Monitoring Technologies • Wireless Vibration Monitoring Sensors • Wireless Lubrication Monitoring Sensors • Infrared Thermography GBA 573 Consulting

  13. Equipment and Technology Matrix GBA 573 Consulting

  14. Work Culture and Management • Continued Focus on Benchmarking Facility • Establish Vision • Identify Goals • Establish Global Metrics (SMART) • Specific • Measurable • Achievable • Reasonable • Timely • Upper Management Visability GBA 573 Consulting

  15. Work Culture and Management • Plant managers know the importance of program, understand the financial impact, invest in the people and technology, and communicate regularly with the maintenance department. • A formalized plan for plant reliability has been established and the impacted Team members. Performance measures are established, tracked, and reported on a regular basis. All members of the Team are asset owners and the emphasis is on elimination of critical equipment failures. • Regular meetings are scheduled with all departments to communicate findings, plan strategies, look at WO optimization ,and to optimize resource utilization. . Work Teams are established to break down reporting barriers and equipment ownership is assigned at the crafts level to empower the resources. GBA 573 Consulting

  16. People / Skills • Establishing and Understanding Roles and Responsibilities • Developing and Maintaining Sponsorship • Event Reporting • Condition Assessment Reporting • ROI Calculations • Correlation of Technical Data • Financial Aspects of Program GBA 573 Consulting

  17. Program Costs GBA 573 Consulting

  18. Schedule • Detailed Project Schedule Developed • Project Estimated at 6 Weeks GBA 573 Consulting