1 / 6

Job Costing

Job Costing. Sample Questions & Solutions. Job Costing. The total cost of a job came to €3,645 Calculate the cost of each component to the nearest cent if the costs were broken down as follows: Materials 1/3 Labour 5/12 Profit margin 1/6 VAT 1/12. Job Costing.

rossa
Télécharger la présentation

Job Costing

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Job Costing Sample Questions & Solutions

  2. Job Costing • The total cost of a job came to €3,645 • Calculate the cost of each component to the nearest cent if the costs were broken down as follows: • Materials 1/3 • Labour 5/12 • Profit margin 1/6 • VAT 1/12

  3. Job Costing Convert fraction to % (divide top by bottom)

  4. Job Costing • Three carpenters work for 2 weeks constructing a roof. They work 9 hours a day for 4 days and 8 hours on the fifth day each week. From the table below, calculate the net pay for the three carpenters after allowances and deductions.

  5. Job Costing Total hours = 4 x 9 + 8 = 44 44 – 39 = 5 hours (overtime) €22 x 39 = €858 €33 x 5 = €165 (hourly rate x 1.5) €1.55 x 5 (days) = €7.75 €1.8 x 5 (days) = €9 Total Gross = €1,039.75 - Tax @ 21% = €218.35 Net wage = €821.40 X 3 = €2,464.20 Answer NB* always take the time to read each question fully to be sure of what answer is required. In this example, the total for the 3 carpenters was requested.

  6. Job Costing • It takes 3,000 meters of flooring to complete one house. How much would it cost to floor 18 houses given the following information? 0.25 x 3,000 = €750 2% = 15 Subtotal €1,252.50 €125.25

More Related