1 / 17

Alkane Energy Oilbarrel Conference April 2009

Alkane Energy Oilbarrel Conference April 2009. Background on Alkane Energy. Coal mine methane 8 operating sites 20MW capacity Licenced reserves Project pipeline. Operations. 90,111 MWh up 13% Gas sales 3.7M therms (2007: 4.3M) 20MW of capacity (2007:18.5MW) Engine utilisation +80%

roth-roth
Télécharger la présentation

Alkane Energy Oilbarrel Conference April 2009

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Alkane EnergyOilbarrel Conference April 2009

  2. Background on Alkane Energy • Coal mine methane • 8 operating sites • 20MW capacity • Licenced reserves • Project pipeline

  3. Operations • 90,111 MWh up 13% • Gas sales 3.7M therms (2007: 4.3M) • 20MW of capacity (2007:18.5MW) • Engine utilisation +80% • Project pipeline to target 50 MWs

  4. Management Structure Neil O’Brien CEO Steve Goalby Finance Director David Oldham Technical Director Dr Cameron Davies Business Development Director

  5. Strategy • Pro2 Sale raising €7.6M • Capital rationing forced on CMM • Better paybacks and returns in the CMM Business • Alkane CMM Portfolio : Aim to be No.1 in UK Installed Capacity • Rapid payback, lowest cost producers • Target 50 MW of capacity in the medium term through organic growth

  6. Strategy • Asset Purchases? • Match to core skills • Complimentary markets • Comparable financial returns with organic expansion • Renewable Research • Broad perspective • Match with Alkane’s skills • Proven technology • Long term research

  7. Track Record

  8. Results – Income Statement

  9. KPIs Record Output

  10. Balance Sheet

  11. Cash Flow

  12. Electricity We are set for record prices in 2009

  13. Realising the Potential • Post 13thLicencing Round : 644km2 of reserves • 3P Reserves estimated at 4,408 M m3 • Two new sites under construction • CBM assets under investigation Reserve reports underpin 50MW target

  14. Looking Longer Term

  15. Investment Case • Proven technology • Proven business model: Revenue CAGR 65% • Proven cash flow: EBITDA at 50% of revenue • Robust Energy prices in 2009 • Alkane’s growth strategy backed up by cash reserves • Target to reach 50MW of capacity organically • Considering asset purchases • Researching renewables

  16. Outlook and Summary

  17. Track Record

More Related