Jerald A. Balta February 21, 2008 Propulsion Team / Cad Cost Modifier – Launch Site. Ground Launch Schedule. Total Cost Modifier. Credit to William Ling. Aircraft Timeline. Balloon Timeline. Rocket Design Schedule. Credit to William Ling. Aircraft Design Schedule. Credit to William Ling.
E N D
Jerald A. BaltaFebruary 21, 2008Propulsion Team / CadCost Modifier – Launch Site AAE 450 Spring 2008
Ground Launch Schedule AAE 450 Spring 2008
Total Cost Modifier Credit to William Ling AAE 450 Spring 2008
Aircraft Timeline AAE 450 Spring 2008
Balloon Timeline AAE 450 Spring 2008
Rocket Design Schedule Credit to William Ling AAE 450 Spring 2008
Aircraft Design Schedule Credit to William Ling AAE 450 Spring 2008
Balloon Design Schedule Credit to William Ling AAE 450 Spring 2008
Design costs for six months • The total salary cost, assuming the entire class size of engineers (forty) at a standard engineering rate for six months according to Space Mission Analysis and Design • $3,000,000 AAE 450 Spring 2008
Balloon Design update Pricing of balloon from Aerostar Update on breakeven height Altitude set at 30000 meters Compares height between sea level and 30000 meters and outputs higher cost AAE 450 Spring 2008
Cost trends from Aerostar AAE 450 Spring 2008
References • Delta II Payload Planners Guide, The Boeing Company, Huntington Beach, CA, 2006 • Falcon 1 Launch Vehicle Payload Users Guide, Space Explorations Technology, Hawthorne, CA, 2007 • Larson, Wiley J., et al. Space Mission Analysis and Design, Microcosm Press, El Segundo, CA, 1992. • Pegasus User’s Guide, Orbital Sciences Corporation, Dulles, VA, 2007 • Perez, Edouard, Ariane 5: User’s Manual, Arianespace, Washington D.C., 2004 • Skladanek, Steve J., “Atlas 21st Century Launch Operations,” 38thAIAA/ASME/SAE/ASEE Joint Propulsion Conference and Exhibit, Indianapolis, IN, 2002. • Smith, Mike, Phone Conversation, Aerostar International, February 15, 2008 AAE 450 Spring 2008