1 / 9

TGac November 2010 Closing Report

This report summarizes the work completed in the TGac for the November 2010 session, including updates to the MAC, PHY, COEX, and MU-MIMO specifications.

Télécharger la présentation

TGac November 2010 Closing Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TGac November 2010 Closing Report Authors: Date: 2010-11-11 Osama Aboul-Magd (Samsung)

  2. Abstract This document is the closing report for the TGac for the November 2010 session. Osama Aboul-Magd (Samsung)

  3. Work Completed (MAC Ad Hoc) • MAC Ad Hoc Report is available in 11-10-1362r0 • MAC related motions include: • VHT Capability element • VHT Operation Element • HT/VHT Control Field Definition • New VHT Action Frame • TXOP Power Save • New MU-MIMO Load Element Osama Aboul-Magd (Samsung)

  4. PHY Ad Hoc Report is available in 11-10-1306r2 • PHY related motions include: • VHT –SIG-B bit pattern in VHT NDPs • Spectral mask for noncontiguous 160 MHz transmission • LDPC related motions • Compressed V matrix feedback as the only feedback for SU and MU-MIMO, and the related VHT MIMO Control field. • 160 MHZ Stream Parser • Enabling the beamformer to control the explicit feedback dimension for each user in MU-MIMO operation • MU-MIMO Support for heterogeneous devices Work Completed (PHY Ad Hoc) Osama Aboul-Magd (Samsung)

  5. COEX Ad Hoc Report is available in 11-10-1297r4 • COEX related motions include: • RTS/CTS for wider channels including CCA • BW and Static/Dynamic indication Work Completed (COEX ad hoc) Osama Aboul-Magd (Samsung)

  6. MU-MIMO Ad Hoc Report is available in 11-10-1308r2 • MU-MIMO related motions include: • Frame format for Group Id management Work Completed (MU-MIMO Ad Hoc) Osama Aboul-Magd (Samsung)

  7. Approved a new revision of the TGac Specification Framework document (11-09-992r18) • Submission 11-10-1361r1 includes a proposed TGac Draft Amendment • 11-10-1367r0 is the related presentation • For a complete set of motions, please refer to 10/1214r7 • Minutes are available in doc 11-10-1380r0 Work Completed Osama Aboul-Magd (Samsung)

  8. January 2011 Goals • Continue the work on the Specification Framework document and its related functional blocks. Osama Aboul-Magd (Samsung)

  9. Conference Call Times • Thursday Dec. 8, 20:00 – 22:00 ET Osama Aboul-Magd (Samsung)

More Related