Designing an OSHA-Compliant Playground for Oak Ridge, Tennessee

rylee-may avatar
14 diapositives · 280 Views · Nov 01, 2014

The project aims to create a safe and engaging playground in Oak Ridge, adhering to OSHA standards. Key requirements include visible supervision for parents, a first-aid kit on-site, age restrictions for children over five, and specific placements for swings and slides to minimize congestion. The design excludes grass and wooden materials and emphasizes safety and accessibility within a 100x100 feet area. Our process involves defining the problem, brainstorming unique play structures, and developing a model to ensure compliance and safety for future playground users.

Designing an OSHA-Compliant Playground for Oak Ridge, Tennessee - slide 1
01 / 14Designing an OSHA-Compliant Playground for Oak Ridge, Tennessee
1 / 17

Télécharger la présentation

Designing an OSHA-Compliant Playground for Oak Ridge, Tennessee
Une image / un lien ci-dessous est fourni (tel quel) pour télécharger la présentation

Politique de téléchargement : le contenu du site vous est fourni TEL QUEL pour votre information et votre usage personnel ; il ne peut être vendu, concédé sous licence ni partagé sur d’autres sites sans l’accord de son auteur.Le contenu vous est fourni TEL QUEL, pour votre information et votre usage personnel uniquement. Téléchargez la présentation en cliquant sur ce lien. Lors du téléchargement, si vous ne parvenez pas à télécharger une présentation, l’éditeur a peut-être supprimé le fichier de son serveur.Pendant le téléchargement, si vous ne parvenez pas à obtenir une présentation, le fichier a peut-être été supprimé par l’éditeur.

F I N

Plus de contenu associé

Transcription de la présentation
  1. Oak Hill Playground By: Jakob, Rhett, Spencer, Rachel

  2. Rules • Parents must be able to see their child at all times • Their should be a first-aid-kit on site • Must be 5 years or older to play • Swings need to be located at edges or coroners of the playground. • Slides need to be in uncongested areas.

  3. Materials • Ground can not be made of grass, asphalt, etc. • Playground attractions can not be made of wood.

  4. Design brief Client Designer Problem Statement Design Statement The City Of Oak Ridge Jakob Havlik, Rhett Elwood, Spencer Wilson, Rachel Fujuyoshi To create a playground that follows OSHA standards. To create a playground that is within the OSHA requirements.

  5. Design brief cont. Constraints Deliverables • 45 Minutes Per Day • 3 Weeks To Complete • 100 Feet By 100 Feet Area • The Playground Has To Be OSHA Approved Deliver an OSHA approved playground to the city of Oak Ridge, Tennennesse

  6. Design process Step 1 Define The Problem Create a playground that is 100 Feet by 100 Feet and is in the OSHA requirements. Step 2 Brainstorm Pirate Ship Jungle Gym Monkey Bars Castle Ball Pit Slide Tire Swings Spiral Slide Ball Pit

  7. Design Process Cont. Step 3 Research www.cpsc.gov/cpscpub/pubs/325.ptf Slides need to be in uncongested areas. Swings need to be located at corners or edges. Ground cannot be mad of grass, asphalt, etc.. The playground attractions cannot be made of wood. • Water Park • Playground of Doom • Universal Playground (has attractions like; a pirate ship, slides, swings, monkey bars, etc. Step 4 Develop Ideas

  8. Design process cont. Step 5 Choose Best Idea Universal Playground Step 6 Model or Prototype Model Ever 2 inches in real life equals 1 inch in the model

  9. Design process cont. Step 7 Test and Evaluate It has been tested through the process of being cut and put together. Step 8 Improve Design We had to rescale parts of the playground to get the scale right

  10. Playground setup every 2 ¼ in in real is 1 in on the model Playground Setup On Inventor Playground Setup On The Model

  11. Pirate Ship Inventor Model

  12. Monkey bars Inventor Model

  13. Tire Swing (we have two of these) Inventor Model

  14. Slide Inventor Model