1 / 41

Renewable Energy

Renewable Energy. Anticipated: 2 Modules 11 sections. Actual: 2 modules Electrical Safety – 5 sections Power Generating Plants - 6 sections. Electrical Safety. WMRE Electrical Generating Power Plants High Voltage and Arc Flash Hazards. Landfill gas converted into electricity

sage
Télécharger la présentation

Renewable Energy

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Renewable Energy Anticipated: 2 Modules 11 sections Actual: 2 modules Electrical Safety – 5 sections Power Generating Plants - 6 sections

  2. Electrical Safety WMRE Electrical Generating Power PlantsHigh Voltage and Arc Flash Hazards • Landfill gas converted into electricity • Equipment voltages - 110 to 480 volts • - Pumps, compressors, power tools, etc. NEED POTOS: pictures of inside plant with electrical generators and 4160 MCC)

  3. Electrical Safety WMRE Electrical Generating Power PlantsHigh Voltage and Arc Flash Hazards • Produces 4,160 volts from engines and turbines • Voltage is stepped up to 12,000 to over 50, 000 volts • Very serious risk of arc flash and arc blast exists NEED POTOS: pictures of inside plant with electrical generators and 4160 MCC)

  4. Electrical Safety WMRE Plants Electrical Generating Power Plants • Typical examples of this high voltage electrical generating equipment installations and utilization systems: • Electrical generator sets on engines and turbines • Transformers • Motor control centers • Disconnects and circuits • Feeders and branch circuits • Switches • And similar equipment

  5. Electrical Safety Section 1 It is the policy of WMRE that contractors are to de-energize electrical equipment systems prior to performing servicing or maintenance (NEED PHOTO – WMRE 4,160 electrical disconnect being de-energized to off)

  6. Electrical SafetySection 1 I agree that all electrical systems and equipment work will be performed on de-energized equipment whenever possible.

  7. Electrical Safety Section 2 Qualified Personnel “Is an individual who has received training in and has demonstrated skills and knowledge in the construction and operation of electric equipment and installations and the hazards involved.”

  8. Electrical Safety Section 2 Qualified Personnel Only “Qualified” personnel may work on electrical equipment or circuits which are, or may be, energized

  9. Electrical Safety Section 2 Qualified Personnel • Distinguish exposed live parts from other parts of electrical equipment • Determine the nominal voltage of exposed live parts • Determine the minimum approach distances applicable to the voltages to which they will be exposed • Use personal protective equipment, insulating materials, insulated tools and proper precautionary techniques for working on or near exposed energized parts of electric equipment

  10. Electrical SafetySection 2 I understand that all electrical systems and equipment work may only be performed by qualified personnel.

  11. Electrical Safety Section 3 NEED PHOTOSelectrical equipment or circuits which are, or may be, energized • Safe Work Practices • Include, but are not limited to: • Voltage testing • Electrical PPE requirements • Safety briefings • Written safe work procedures • Lockout and Tagout

  12. Electrical SafetySection 3 I understand that my employer is responsible for developing and implementing safe work practices for all work that is performed on, or near, electrical equipment.

  13. Electrical Safety Section 4 NEED PHOTOSelectrical work being performed • You Must Coordinate Electrical Work • With WM Management Personnel • Local Power Utility depending on task

  14. Electrical SafetySection 4 I understand that all work on electrical systems and equipment must be coordinated with the WMRE facility management personnel and/or local utility.

  15. Electrical Safety Section 5 Arc Flash “An explosion caused by uncontrolled conduction of electrical current from phase to ground, phase to neutral, and/or phase to phase, accompanied by an ionization of the surrounding air.”

  16. Electrical Safety Section 5 Arc Flash

  17. Electrical Safety Section 5 NEED PHOTOArc Flash violent blast Arc Flash • A violent blast of expanding hot air up to 35,000° Fahrenheit • A blast of extreme pressure

  18. Electrical Safety Section 5

  19. Electrical Safety Section5 Contractor Responsibilities • Follow arc flash label instructions, where available • For work on electrical equipment without labels, determine the arc flash risk • Determine and use the appropriate level of electrical PPE required for the electrical work tasks they will be performing

  20. Electrical Safety Section 5 Refer to NFPA 70E Requirements • Safety precautions are outlined in the NFPA 70E standard

  21. Electrical SafetySection 5 I understand that WMRE electrical equipment can produce an arc flash which is a serious safety risk that can injure or kill a person. As a contractor, I am responsible for identifying and controlling the risk of an arc flash and for wearing the appropriate electrical PPE for the electrical work which I will be performing.

  22. Power Generating Plants General Plant Safety Requirements NEED PHOTO2-3 WMRE facility photos

  23. Power Generating Plants Section 1 NOTE: Theses items could be included in the Site-specific Rules for each location • Upon Arrival at a WRME Plant • Check in and coordinate work with the WMRE Plant Manager, or his/herdesignee • Contractors should ensure they, and their employees, have an understanding of: • - Facility alarm systems • Rally point locations, evacuation maps, etc. • - Permit Required Confined Spaces • Only trained and qualified contractors may enter • Labeled “Danger - Do Not Enter - Permit Required Confined Space” NEED PHOTO2-3 WMRE facility photos

  24. Power Generating Plants Section 1 Upon Arrival at WRME Plant • Contractors should ensure they, and their employees, have an understanding of: • WM Hazardous Energy Control Program • WMRE Equipment Specific LOTO (Lockout/Tagout) Procedures • WMRE MSDS (Material Safety Data Sheets) location • WMRE Plant Container and Piping Labeling System • WMRE PPE requirements NEED PHOTO

  25. Power Generating PlantsSection 1 I agree that contractors are responsible for coordinating with local Waste Management Renewable Energy plant personnel, before starting work, to ensure their understanding of the following topics: • Facility alarm systems • Permit required confined space information • Hazardous Energy Control Programs • Material Safety data Sheets • Container and Piping labeling systems • PPE requirements

  26. Power Generating Plants Section 2 NEED PHOTO Person wearing correct PPE • Personal Protective Equipment • WMRE Required PPE • Hearing Protection • Safety Glasses, Safety Toed Boots, Long Sleeve Shirts and Long Pants • Electrical PPE • WMRE Exceptions to Landfill PPE • No high visibility vests • No hard hat, unless: • Overhead hazard exists • Construction, lifting parts overhead, etc. • Contractors Must Provide Their Own PPE

  27. Power Generating PlantsSection 2 I understand that the following are required at all times: • Hearing protection • Safety glasses and safety toed boots • Long sleeves and long pants • Additionally, electrical personal protective equipment is required , when working on, or near, electrical systems and equipment • Contractors must provide their own PPE

  28. Power Generating Plants Section 3 NEED PHOTO • No Eating, Smoking or Borrowing of Equipment • No eating or drinking inside the plant • No smoking anywhere inside the building • Contractors must furnish their own equipment • WMRE does not loan or allow the borrowing of WM equipment by contractors

  29. NEED PHOTO Contractors working with contractor supervisor Power Generating Plants Section 3 • Contractor Supervision • WMRE does not supervise Contractor employees • - Contractors are responsible for providing their own employee supervision • WMRE employees are authorized to: • - Report a hazard to a Contractor's supervisor • - Stop work and to require immediate corrective action • Contractors must fully comply with applicable OSHA regulations and WMRE Rules • - Violators may be removed from the facility

  30. Power Generating Plants Section 3 NEED PHOTO Contractors working with contractor supervisor Hot Work • No Hot Work without a Hot Work Permit • Hot work is any welding, cutting, grinding, heat or spark producing operations • Contractors must have their own hot work permit system • Contractors must furnish their own air monitoring equipment and fire watch personnel • Coordinate hot work activities with WMRE management personnel

  31. Power Generating Plants 3 • Please indicate that you understand and agree with the following statements. • no eating, drinking, or smoking is allowed inside the building • contractors are not allowed to borrow WM equipment • contractors are responsible for providing their own employee supervision • as a contractor, I must comply with all OSHA regulations and WM safety policies • contractors are required to have a hot work permit for all hot work activities

  32. Power Generating Plants Section 4 • Chemical Hazard Communication • WMRE Plants Contain: • - Oils • - Coolants • - Compressed- Gases/Air • - Lead Acid Batteries

  33. Power Generating Plants Section 4 NEED PHOTO Piping & Equipment • Landfill Gas and Condensate • Piping and equipment contains highly flammable and toxic landfill gas • - Contractors must attend WM landfill gas safety module

  34. Power Generating Plants Section 4 NEED PHOTO Sumps, pits, tanks • Landfill Gas and Condensate • During the compressor phase, condensate may be generated and is contained in sumps, pits, tanks, etc. • Contractors must refer to WMRE MSDS or MIS

  35. NEED BETTER PHOTO Hazardous Materials Identification System example color coding of the piping Power Generating Plants Section 4 • Container and Piping Labels • Contractors must train their employees to understand the WMRE plant container and piping labeling system and the hazards of the chemicals • Refer to the WMRE site specific hazard communication program which contains the labeling information for the facility • - Hazardous Materials Identification System (HMIS) • - Colored Piping

  36. Power Generating PlantsSection 4 • I understand that WMRE plants contain hazardous chemicals • I understand that WMRE plants contain landfill gas and landfill condensate which is highly toxic and flammable. • I understand the container and piping labeling system being used and that additional information is available to me in the WMRE Hazard Communication Program

  37. Power Generating Plants Section 5 NEED BETTER PHOTO Mobile Equipment • Mobile Equipment Use • Contractors must furnish their own mobile equipment • Contractors are not permitted to use any WMRE equipment • Unless a Contractor Waiver and Release Agreement for Equipment form is signed • Contractors must train their employees to properly operate mobile equipment

  38. Power Generating PlantsSection 5 • Contractors must furnish their own mobile equipment, unless special arrangements are made with WMRE personnel • Contractors are responsible for properly training their employees on the equipment they are to use and verifying its safe use

  39. Power Generating Plants Section 6 NEED BETTER PHOTO(S) Other hazard examples • Other Hazards • Powered industrial trucks and other moving equipment • Forklift trucks, vehicle traffic outside, man lifts, and others • Overhead hazards • Fixed piping • Cranes/hoists moving equipment overhead • Hot Surfaces and Hot Liquids • Engines, compressor lines, piping, air compressors, etc. • Equipment Starts Automatically • Fall Protection Required • Trenching and Excavation Notification Requirement (we’re talking about other hazards – then notification requirement – DOES THIS BELONG HERE?

  40. Power Generating Plants 6 I understand that WMRE plants contain numerous safety hazards such as: • Powered industrial trucks • Overhead hazards • Hot Surfaces and Hot Liquids • Equipment that Starts Automatically • Fall Protection Hazards I understand that I must notify WMRE and the landfill prior to performing any trenching or excavating.

  41. Power Generating Plants NEED BETTER PHOTO(S) - WM personnel interacting with contractor • Be Safe! • Contractors are to check with their supervisor for additional safety guidance • Contractors must check with local WMRE site management for additional safety hazards • Report all hazards and incidents immediately • Most Importantly – Work Safely!

More Related