OTC 22973 Successful Broadband Drillstring Technology Uptake: From Field Test to Extended Reach Offshore Campaign

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. OTC 22973 Successful Broadband Drillstring Technology Uptake: From Field Test to Extended Reach Offshore Campaign Daan Veeningen, Jason Palmer, Greg Steinicke, Jesus Saenz NOV IntelliServ

  2. Talking Points Introduction and challenges for Extended Reach Drilling Campaign in Trinidad and Tobago Field test of high-speed telemetry and along-string pressure evaluation capability Execution highlights and success factors Results and conclusions

  3. Introduction Trinidad Location Courtesy: BP Savonette, 290ft water, largest jacket built in Trinidad Courtesy: BP Constellation 1 Courtesy: Transocean

  4. ERD Campaign Challenges • High angle wellbores • Wellbore instability • Hole cleaning • NPT risking economic viability

  5. Current Telemetry System Desired Outcome Mud Pulse Data transferred in 2-5 sec pulses • High angle wellbores • Wellbore instability • Hole cleaning • NPT risking economic viability Sequential data Reduce geological uncertainty Identify bedding-related instability Annular pressure measurements Risk mitigation, redundancy 10 bits/sec Gamma Vibration Resistivity Pressure

  6. Broadband Drillstring Technology Mud Pulse Mud Pulse Networked Drillstring Data transferred in 2-5 sec pulses Continuous bi-directional data transfer Sequential data Reduce geological uncertainty Identify bedding-related instability Annular pressure measurements Risk mitigation, redundancy 10 bits/sec Simultaneous data 57, 600 bits/sec High bandwith High defention Highvolume Real time Tool actuation Gamma Vibration Resistivity Pressure NMR Sonic Seismic Etc., etc. Vibration Image logs

  7. Broadband Drillstring Technology 1) Armored coax cable 2) Induction coils 3) Boosters

  8. Broadband Drillstring Technology Mud Pulse Mud Pulse Networked Drillstring Data transferred in 2-5 sec pulses Continuous bi-directional data transfer Sequential data 10 bits/sec Simultaneous data 57, 600 bits/sec High bandwith High defention Highvolume Real time Tool actuation Gamma Vibration Resistivity Pressure Networked Drillstring 320 ft/hr 2 pts/ft –16 sector Image log in HD Mud Pulse 60 ft/hr 1 pt/ft –4 sector Image log “averages out” breakout. NMR Sonic Seismic Etc., etc. Vibration Image logs

  9. First Well Highlights Courtesy of Baker Hughes • Fault imaging at 100ft/hr in 17 ½” hole – Modifying well trajectory • Dip picking in real time – Improving structural understanding • Stick slip in real time – Modifying drilling parameters and extended hole section • Tool memory filled Up • Wellbore breakout imaging – Caliper in real time • Diagnosed sensor failure – Drilling Ahead • Conclusion: More data saves time to interpret

  10. First Well Highlights • Fault imaging at 100ft/hr in 17 ½” hole – Modifying well trajectory • Dip picking in real time – Improving structural understanding • Stick slip in real time – Modifying drilling parameters and extended hole section • Tool memory filled Up • Diagnosed sensor failure • Conclusion: More data saves time to interpret Courtesy of Baker Hughes

  11. First Well Highlights SPE 119808, Courtesy of Baker Hughes • Fault imaging at 100ft/hr in 17 ½” hole – Modifying well trajectory • Stick slip in real time – Modifying drilling parameters and extended hole section: Hole in One • Tool memory filled – Drilling ahead • Dip picking in real time – Improving structural understanding • Wellbore breakout imaging – Caliper in real time • Diagnosed sensor failure • Conclusion: More data saves time to interpret

  12. Success factors 1: Local Servicing Commission local shore base with maintenance and servicing capability

  13. Success factor 1: Local Servicing Commission local shore base with maintenance and servicing capability

  14. Success factor 2: Deployment Processes Rig Visit Design Planning Installation Testing

  15. Success factor 2: Deployment Processes

  16. Results and Conclusions • Successfully deployed networked drillstring • Operated 84kft at >85% uptime • Serviced 3rd party tools locally • Operational achievements: • Reduced geological uncertainty • Reduced wellbore instability • Managed hole cleaning Improved operational efficiency • Successful field test • Five wells (currently on well eight) • Second rig in simultaneous operations (June)

  17. SPE 22973 Daan Veeningen Thanks to our Service Partners Questions?