Cable Routing and Ladder Placement in TDC2: Current Situation Viewing Passerelle to TCC2
170 likes | 286 Vues
Gain insight into current cable routing and ladder placements in TDC2 from Passerelle toward TCC2, highlighting transitions and sections. Visualize the layout for efficient access and control.
Cable Routing and Ladder Placement in TDC2: Current Situation Viewing Passerelle to TCC2
E N D
Presentation Transcript
ROUTAGE ECHELLES A CABLES DANS TDC2 SITUATION ACTUELLE
VUE SUR PASSERELLE, VERS TCC2, FIN SECTION 8mSITUATION ACTUELLE
VUE SUR PASSERELLE, VERS TCC2, DEBUT SECTION 6mSITUATION ACTUELLE
TDC2 : TRANSITION SECTION 8m VERS SECTION 6m SITUATION ACTUELLE TDC2 SECTION 8m 5 ECHELLES COTE JURA TDC2 SECTION 6m
A A TRANSITION SECTION 8m 6m SITUATION ACTUELLE
D D DEBUT SECTION 6m : SITUATION ACTUELLE
3 MSSB TCSC D D VOLUME ECHELLES SECTION 6m : PASSAGE ECHELLES DE LA PASSERELLE VERS MUR “JURA”
Proposition echellesau sol cote machine EN NUANCES DE VERTS : ECHELLES CONTROLE EN JAUNE : ECHELLE SERVICES GENERAUX EN ROUGE : ECHELLE PUISSANCE
A A Section de depart = section existante
B B • Degagementechelle SG vers cote saleve • Degagement OD 110 vers OD??? • OD??? Devient OD110 • Reste de la section inchange OD110 OD??? SG
C C • Degagement OD 118 vers cote Saleve OD118
D D MDLV.240104 ~28m • Mouvementexistant de OD110 versmurSaleve Section sur premiere partie TDC2 MDLV.240104 a peupres OD110
3 MSSB TCSC E E • Fin de la passerelle • Degagement OD 114 versmurSaleve MDLV.240104
3 MSSB TCSC F F • 2 echelles 600 surpasserelle 3 echelles 400 au sol
3 MSSB TCSC G G ECHELLES EXISTANTES MSSB MSSB MSSB
TCSC 3 MSSB H H
TCSC I I • 3 echelles AL 400 au sol configuration existante