1 / 11

Telebridge Network Status and Future

Telebridge Network Status and Future. Dave Taylor, W8AAS U.S. Delegate to ARISS-International w8aas@amsat.org. Background. Telebridge network began in 1985 Supported SAREX mission for Tony England Telebridge stations have been a United States responsibility since then. Recent History.

sani
Télécharger la présentation

Telebridge Network Status and Future

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TelebridgeNetworkStatus and Future Dave Taylor, W8AAS U.S. Delegate to ARISS-International w8aas@amsat.org

  2. Background • Telebridge network began in 1985 • Supported SAREX mission for Tony England • Telebridge stations have been a United States responsibility since then

  3. Recent History • In 2008, we began a search for additional telebridge stations • In 2009, we added • LU8YY and LU1CGB in Argentina • VK6MJ in Australia • In 2010, we added • IK1SLD in Italy

  4. Current Stations • 9 active telebridge stations • AH6NM, Hawaii, USA • IK1SLD, Casale Monferrato, Italy • K6DUE, Maryland, USA • LU1CGB, Buenos Aires, Argentina • LU8YY, San Luis, Argentina • W6SRJ, California, USA • VK4KHZ, Queensland, Australia • VK5ZAI, South Australia, Australia • VK6MJ, Western Australia, Australia

  5. Current Stations (cont.) • In development • VE4ISS, Winnipeg, Canada • Inactive • ON4ISS, Belgium • W5RRR, Texas, USA

  6. Telebridge Locations ON4ISS VE4ISS IK1SLD W6SRJ K6DUE W5RRR AH6NM VK4KHZ LU8YY LU1CGB VK6MJ VK5ZAI ActiveInactiveFuture

  7. Evaluation Process • Get details about operator and station • Review application • Conduct test pass

  8. Selection Criteria • Considerations for approving a telebridge station include: • Location • Technical • Language • Access • Legal

  9. Impact of Added Stations • Increased processing when generating best weeks and pass options • Increased work to filter options and check station availability • Decreased contacts for existing stations, particularly if footprints overlap • Station operators become out-of-practice • Time spent tracking status of station, monitoring performance

  10. Current Status • We receive occasional requests from interested hams • Three requests pending • Italy • Malaysia • Brazil

  11. Proposal • ARISS should take over operation of the telebridge network from AMSAT-NA • The Operations Committee should be responsible for selecting and managing telebridge stations • The ARISS-I Delegates should be responsible for approving new stations

More Related