An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    4. SINISTRE MAXIMUM POSSIBLE 1- DEFINITION 2- LIMITES 3- SIMULATIONS - Schma 1 - Schma 2 - Schma 3 - Cas rel 10m/30 m 4- DE LA THEORIE A LA PRATIQUE - Les diffrents scnarios - Ingnierie et Risk management 5- CONCLUSIONS - Assureurs - Conseils - Risk managers

    5. DEFINITION 1. Circonstances les plus dfavorables exceptionnellement runies 2. Sinistre pas ou mal combattu 3. Arrt par un obstacle infranchissable - espace libre > 10 m - mur sparatif coupe-feu sans ouvertures - absence daliment.

    6. LIMITES 1. Distance retenue entre btiments (10, 20, 30 m) 2. Prils concerns : incendie, explosion 3. Prils non concerns : attentats, incendie volontaire, vnements naturels

    7. SIMULATIONS : SCHEMA 1

    8. SIMULATIONS : SCHEMA 1 RESULTAT

    9. SIMULATIONS : SCHEMA 2

    10. SIMULATIONS : SCHEMA 2 : RESULTAT

    11. SIMULATIONS : SCHEMA 3

    12. SIMULATIONS : SCHEMA 3 : RESULTAT

    14. DE LA THEORIE A LA PRATIQUE 1. Les diffrents scnarios . SMP ou MPL (maximum possible loss) . SRE ou EML (estimated maximum loss) 1- dtection incendie fonctionne 2- intervention des sapeurs pompiers dans les dlais 3- sprinklers en tat de marche 4- portes coupe-feu en tat de marche 5- moyens en eau sont suffisants . SP ou NLE (normal loss expectancy)

    16. DE LA THEORIE A LA PRATIQUE 2. Ingnierie et Risk management . Rduire le SMP : 1- conception 2- compartimentage . Ramener le SP au niveau du SRE

    17. AVEC DES PANNEAUX MO

    18. AVEC DES BONS PANNEAUX M 1

    19. AVEC DES PANNEAUX M 4

    20. CONCLUSIONS - Complexit et relativit du sujet ; - Assureurs : . Transparence ; . Assistance ; . Impact sur la prime. - Conseils : implication.

    21. CONCLUSIONS - Risk managers : . Responsabilit du niveau de garantie (usine, business, corporate) ; . Arbitrage : LCI/franchise rtention.

    22. SINISTRE MAXIMUM POSSIBLE SUJET MAJEUR A PARTAGER

    23. IMPACT SUR LA PRIME