1 / 15

Content Sensor Preamplifier c) Whole SCM performances d) EMC remarks e) I/F : EWO & SORBET

Search Coil Magnetometer (SCM) Mechanical & Electronic Design S. Yagitani – M. Hikishima G. Chanteur – C. Coillot – S. Ruocco Kanazawa Univ. CETP/CNRS/IPSL. Content Sensor Preamplifier c) Whole SCM performances d) EMC remarks e) I/F : EWO & SORBET f) Plan for 2006-2007.

seamus
Télécharger la présentation

Content Sensor Preamplifier c) Whole SCM performances d) EMC remarks e) I/F : EWO & SORBET

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Search Coil Magnetometer (SCM)Mechanical & Electronic Design S. Yagitani – M. Hikishima G. Chanteur – C. Coillot – S. Ruocco Kanazawa Univ. CETP/CNRS/IPSL PWI Meeting 24 March 2006 – Kanazawa University – SCM Kanazawa Univ.: S. Yagitani-M.Hikishima – CETP : G. Chanteur–C. Coillot-S.Ruocco

  2. Content • Sensor • Preamplifier • c) Whole SCM performances • d) EMC remarks • e) I/F : EWO & SORBET • f) Plan for 2006-2007 PWI Meeting 24 March 2006 – Kanazawa University – SCM Kanazawa Univ.: S. Yagitani-M.Hikishima – CETP : G. Chanteur–C. Coillot-S.Ruocco

  3. Sensor : status • Status at end of 2005 : • BBM1 has been manufactured and tested at Kanazawa. • SCDB BBM1 sensor, magnetostriction occurred on magnetic core due to potting material used. • Current Status : • New SCDB BBM has been realized with a new potting material (more compressible) • Magnetostriction doesn’t occur. • Test with PA is in progress PWI Meeting 24 March 2006 – Kanazawa University – SCM Kanazawa Univ.: S. Yagitani-M.Hikishima – CETP : G. Chanteur–C. Coillot-S.Ruocco

  4. SC-LF SC-DB • Sensor with potting : Mechanical design • Dimensions of sensors (both SC-LF & SC-DB sensor) are fixed : • Length =104mm, Diameter = 20mm *Mass should be saved using painting for electrostatic shielding. **Mass should be saved using a thinner potting PWI Meeting 24 March 2006 – Kanazawa University – SCM Kanazawa Univ.: S. Yagitani-M.Hikishima – CETP : G. Chanteur–C. Coillot-S.Ruocco

  5. b) Preamplifier PA SC-DB • BBM preamplifiers have been manufactured and tested. • Tests are in progress. • Main functions are: • Amplification for LF & HF • Feedback • Filtering on LF & HF • Power supply regulation • Differential output • Management of calibration • signals PA SC-LF PWI Meeting 24 March 2006 – Kanazawa University – SCM Kanazawa Univ.: S. Yagitani-M.Hikishima – CETP : G. Chanteur–C. Coillot-S.Ruocco

  6. SCDB BBM preamplifier performances : gain & noise PWI Meeting 24 March 2006 – Kanazawa University – SCM Kanazawa Univ.: S. Yagitani-M.Hikishima – CETP : G. Chanteur–C. Coillot-S.Ruocco

  7. Power consumption of SCM Preamplifiers BBM Preamplifier abilities are compliant to AO PWI Meeting 24 March 2006 – Kanazawa University – SCM Kanazawa Univ.: S. Yagitani-M.Hikishima – CETP : G. Chanteur–C. Coillot-S.Ruocco

  8. Gain Phase 1 Frequency [Hz] 1M c) Whole SCM SCM has been fully tested at Kanzawa University, LF-x (JAPAN)LF-y (JAPAN)LF-z (FRANCE)HF-z (FRANCE) PWI Meeting 24 March 2006 – Kanazawa University – SCM Kanazawa Univ.: S. Yagitani-M.Hikishima – CETP : G. Chanteur–C. Coillot-S.Ruocco

  9. Transfer function measurement on new SCDB BBM Two frequency bands are measured simultaneously. A high frequency resonance above 600kHz remains… PWI Meeting 24 March 2006 – Kanazawa University – SCM Kanazawa Univ.: S. Yagitani-M.Hikishima – CETP : G. Chanteur–C. Coillot-S.Ruocco

  10. d) EMC Remarks • Immunity to voltage ripple : • From JAXA-MMO-C005-1_EMC : • 1Vrms max from 0.1Hz to 2kHz (became 10mV from SWG ?) • 0.5Vrms from 2kHz to 500KHz • Tests have been realized on SCDB. • Preamplifier exhibits a 60dB rejection of voltage ripple. • PA + sensor exhibits a 20dB rejection above few hundred hertz. • PA of SC-LF should be less sensitive to voltage ripple (cf. discussion with Pr Nagano during Kanzawa workshop !) • => Need to have a more quiet power supply and less voltage ripple !!!! • => PA regulation could be improved… PWI Meeting 24 March 2006 – Kanazawa University – SCM Kanazawa Univ.: S. Yagitani-M.Hikishima – CETP : G. Chanteur–C. Coillot-S.Ruocco

  11. Air gap in magnetic core : with or without ? • With an air gap, flux leakage are localized near to the gap, while it is distributed for a non air gap core. • Magnetic field radiated is 1000 higher with an air gap than without air gap !!! PWI Meeting 24 March 2006 – Kanazawa University – SCM Kanazawa Univ.: S. Yagitani-M.Hikishima – CETP : G. Chanteur–C. Coillot-S.Ruocco

  12. d) I/F SCM Preamplifiers to EWO/SORBET SCM to EWO : grounded outputto differential input (TBC & Rin = ?) SCM to SORBET : grounded output to differential input (R_Sorbet=600 Ohms) TBC CAL-LF : generated from AM2P (or EWO :TBD) and routed through EWO (TBC) CAL-HF : generated from SORBET (Grounded on SORBET side and differential on SCM side ) PWI Meeting 24 March 2006 – Kanazawa University – SCM Kanazawa Univ.: S. Yagitani-M.Hikishima – CETP : G. Chanteur–C. Coillot-S.Ruocco

  13. Some features of AM2P (or from EWO TBD) calibration signal : • Frequency sweep from 1.38Hz to 288Hz : should be sufficient to check integrity of SCM sensors (TBC). • AM2P CAL Signal should be routed through EWO : TBC • Switch ON of calibration signal should be managed from EWO. • Housekeeping for CAL status should be useful. • Waveform telemetry should be better during calibration. • Input of SCM Preamplifier should be differential (TBC) PWI Meeting 24 March 2006 – Kanazawa University – SCM Kanazawa Univ.: S. Yagitani-M.Hikishima – CETP : G. Chanteur–C. Coillot-S.Ruocco

  14. e) Plan for 2006-2007 • Sensors : • Thermal cycling of BBM sensor (SCDB) : Summer 2006 • Preliminary vibration tests (SCDB) : Summer 2006 • Calibration (whole SCM+MLI) : August 2006 • End of BBM sensor design : beginning of 2007 • EM manufacturing could start : beginning of 2007 • Preamplifier SCM : • Electrical & mechanical design of BBM closest as possible to EM • PCB manufacturing : beginning of 2007 • “cube” (3D+) preamplifier manufacturing : september 2006 • Aluminium housing : beginning of 2007 EM manufacturing could start : beginning of 2007 PWI Meeting 24 March 2006 – Kanazawa University – SCM Kanazawa Univ.: S. Yagitani-M.Hikishima – CETP : G. Chanteur–C. Coillot-S.Ruocco

  15. EGSE : plan for 2006-2007 • Sniffer => tri axis sensor to measure magnetic field radiated in a noisy environment : End of 2006 • Sensors are under manufacturing • Preamplifier is under manufacturing • Design of acquisition device is under progress • => Calibration signal “emulator” of SORBET & AM2P : • summer 2006. PWI Meeting 24 March 2006 – Kanazawa University – SCM Kanazawa Univ.: S. Yagitani-M.Hikishima – CETP : G. Chanteur–C. Coillot-S.Ruocco