1 / 11

Dynamic Bandwidth Allocation for Long-Reach PON: Overcoming Performance Degradation

Dynamic Bandwidth Allocation for Long-Reach PON: Overcoming Performance Degradation. Skubic , B.  ;  Jiajia Chen  ;  Ahmed, J.  ;  Biao Chen  ;  Wosinska , L.  ;  Mukherjee , B. Communications Magazine, IEEE , November 2010 . Presenter Chia -Cheng Chen. Outline. Introduction

sef
Télécharger la présentation

Dynamic Bandwidth Allocation for Long-Reach PON: Overcoming Performance Degradation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Dynamic Bandwidth Allocation forLong-Reach PON: OvercomingPerformance Degradation Skubic, B. ; Jiajia Chen ; Ahmed, J. ; Biao Chen ; Wosinska, L. ; Mukherjee, B. Communications Magazine, IEEE, November 2010  • Presenter Chia-ChengChen

  2. Outline • Introduction • Performance Degradation Of DBA In LR-PON • Multi-Thread DBA • Simulation Results • Conclusions

  3. Introduction • Examine for both Gigabit PON and Ethernet PON, the extent to which DBA performance degradation can be reduced by exploiting multi-threading.

  4. Performance Degradation Of DBA In LR-PON

  5. Multi-Thread DBA • GPON DBA

  6. Multi-Thread DBA(Cont.) • EPON DBA

  7. Multi-Thread DBA(Cont.) • Two ways of reducing the responsetime of the DBA in a PON • Reduced DBA cycle or polling cycle • Execute the DBA algorithm more frequently • In EPON • Introducing multiple DBA threads • In GPON • Reducing the DBA cycle and increasing the overlap

  8. Multi-Thread DBA(Cont.) • Multi-Thread DBA

  9. Multi-Thread DBA(Cont.) • Newly arrived frames plus(NA+) scheme • Traffic • Ii= I(ti–1, ti) : Ii= Ri– Ri–1+gi • Bandwidth demand is calculated • Bdem,i= Ii+ Ci , • Ci: compensate for backlogged traffic • (Ci= Bdem,i–n – gi–n,n>=1) • GPON: gi= f(Gi) • EPON: Ci= Bdem,i–n – gi–n + Ui–n,Ui–n means which occurred Gi: resulting grant Ri: report for logic queue gi= f(Gj), j < i

  10. Simulation Results

  11. Conclusions • Both GPON and EPON, multi-threading employing the proposed NA+ scheme, provides an avenue for mitigating the performance degradation of DBA in LR-PON.

More Related