1 / 22

Vasiliki A. Mitsou CERN HEP 2003, 17-20 April, Athens, Greece

Construction and quality control of the end-cap Transition Radiation Tracker for the ATLAS experiment. Vasiliki A. Mitsou CERN HEP 2003, 17-20 April, Athens, Greece. Introduction : ATLAS detector Transition Radiation Tracker Barrel modules production End-cap wheels production.

sen
Télécharger la présentation

Vasiliki A. Mitsou CERN HEP 2003, 17-20 April, Athens, Greece

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Construction and quality control of the end-cap Transition Radiation Tracker for the ATLAS experiment Vasiliki A. Mitsou CERN HEP 2003, 17-20 April, Athens, Greece

  2. Introduction: ATLAS detector Transition Radiation Tracker Barrel modules production End-cap wheels production Acceptance tests at CERN Gas tightness Wire tension High voltage Straw straightness (WTS) Status of electronics Concluding remarks Outline V. A. Mitsou / CERN

  3. ATLAS Inner Detector concept General requirements: • Combination of central tracker and TRD features • Robust pattern recognition • Bunch crossing rate – 40 MHz (25 ns between interactions) • Interactions per year - 1016 • Selection level (Higgs) ~ 1:1013 V. A. Mitsou / CERN

  4. Length: Total 6802 cm Barrel 148 cm End-cap 257 cm Outer diameter 206 cm Inner diameter 96-128 cm # straws: Total 372 832 Barrel 52 544 End-cap 319 488 # electronic channels 424 576 Weight ~ 1500 kg Transition Radiation Tracker(TRT) Barrel End-caps V. A. Mitsou / CERN

  5. TRT test-beam performance • Threshold: 200 eV • Drift-time measurement efficiency within ±2.5 σ: 87% Two thresholds: 0.2 keV and 5.5 keV For90%electron efficiency,10-2pion rejection V. A. Mitsou / CERN

  6. Barrel modules construction • Production of most of the parts (straws, radiator packs, wire supports, etc) is completed • 60 modules are completed so far (~60%) • Barrel modules construction is expected to end by July 2003 Module testing is expected to end by August 2004 Module gain mapper now operational V. A. Mitsou / CERN

  7. Module gain mapping 25 pulse-height spectra are taken along each wire On-line fits, first scan V. A. Mitsou / CERN

  8. End-cap wheels production status • 2 type-A, 4-plane wheels completed at PNPI (St. Petersburg) • 2 type-B, 4-plane wheels completed at JINR Dubna • All four wheels shipped to CERN – currently under testing • 13 (11) wheels partially assembled at PNPI (JINR) – absence of web circuits • Type-C wheels (staged detector) not in production yet V. A. Mitsou / CERN

  9. Acceptance tests at CERN Reception Dimensional checks Check of electrical connections Gas tightness Wire tension HV (CO2) Gas gain uniformity (WTS) HV (Triple mixture) 8- or 16-plane wheel assembly Fluid tightness Final dimensional checks Repairs Building 154 at CERN: Reception Acceptance Tests Assembly Short Term storage Also at assembly sites V. A. Mitsou / CERN

  10. P-gauge (room) Exhaust Bubbler (26 cm Isopropyl alcohol) 20 mbar max. P-gauge (table) EXHAUST Valve P-display INLET Valve RS-232 RS-232 Ar cylinder 4-plane wheel PCI MIO16 Table #2 T-sensor Interface box PC LABVIEW MainVI.vi Gas tightness setup P-regulator • Test: measurement of pressure loss inside the straws filled with Ar at 20 mbar overpressure • Specification: < 1 mbar/min/bar • Time: 1 day V. A. Mitsou / CERN

  11. Gas tightness results Spec: <1 mbar/min/bar 20ITPNP000002 V. A. Mitsou / CERN

  12. Wire tension: method • Method: mechanical resonance induced by a loudspeaker • Frequency scanning: [240,320] Hz • 32 channels are scanned simultaneously • Spec: 55 < T < 80 g Slippage < 3 g V. A. Mitsou / CERN

  13. Wire tension: results • No systematic wire slippage is observed • Discrepancies between tension measured at CERN and assembly sites under investigation • Wire tension setup is modified to obtain maximum reliability and efficiency V. A. Mitsou / CERN

  14. HV Test (I) 1 Flap in a WEB Test: 1800 V in CO2 Spec: current < 50 nA • The following circuits are checked, at different assembly and acceptance stages: • Ground of WEB- high voltage socket • Ground of ring - high voltage socket • Neighboring high voltage sockets Ground HV socket V. A. Mitsou / CERN

  15. HV Test (II) Current (nA) distribution Wheel 20ITPNPA00001 I > 50 nA V. A. Mitsou / CERN

  16. Wheel Test Station (WTS) Measurement of gas gain (1% accuracy) to derive eccentricity value per straw Gain variation: Specification: 100% straws with DG/G < 10% (400mm) 95% straws with DG/G < 5% (300mm) • 6 points of measurements along each straw • Slow control ( T, P, HV, humidity, gas flow) • Monitoring straws • Electronics calibration • Online/Offline analysis • 4-plane wheel characterization takes ~20 h at CERN V. A. Mitsou / CERN

  17. PNPI Wheel #1 20ITPNPA000001, straw 2/285 DG/G > 12 % WTS: gain variation of one straw PNPI Wheel #2 20ITPNPA000002 R1 R2 R3 R4 R5 R6 Straw 3407 Reference Straw V. A. Mitsou / CERN

  18. WTS: gain variation in one wheel (I) 100% straws DG/G = 10% 400 mm 95% straws DG/G = 5%  300 mm Readout problems PNPI Wheel #1 20ITPNPA000001 V. A. Mitsou / CERN

  19. WTS: gain variation in one wheel (II) Wire deviation > 400 μm: Wire disconnection (400 μm) V. A. Mitsou / CERN

  20. WTS results reproducibility Gain variation (DG/G): Max. error ~ ± 1% RMS < 0.5% V. A. Mitsou / CERN

  21. ASDBLR boards DTMROC board Electronics status • ASDBLR and DTMROC chips ready to start mass production • End-cap FE boards design almost finalized • Barrel FE boards: new, more compact design with fewer connections adopted V. A. Mitsou / CERN

  22. Concluding remarks • Production of TRT barrel models is well under way - 60% of the modules have been constructed so far • End-cap wheels of type A & B are being constructed and delivered to CERN since June 2002 • Acceptance of first 4-plane wheels assembled at PNPI and JINR is successfully ongoing at CERN • No difference between characteristics of wheels (A &B) after assembly and after reception at CERN V. A. Mitsou / CERN

More Related