1 / 7

Solar Support Centre

E124. E125. E123. E126. E122. E127. E136. E128. E129. E136. E135. E137. E138. E131. E130. Solar Support Centre. Desks for 4 people + connection to Bruce’s Workbenches Compactus & cupboards for spare parts Monitor panel Intercom/PA. E124. E125. E123. E126. E122. E127.

Télécharger la présentation

Solar Support Centre

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. E124 E125 E123 E126 E122 E127 E136 E128 E129 E136 E135 E137 E138 E131 E130 Solar Support Centre • Desks for 4 people + connection to Bruce’s • Workbenches • Compactus & cupboards for spare parts • Monitor panel • Intercom/PA

  2. E124 E125 E123 E126 E122 E127 E136 E128 E129 E136 E135 E137 E138 E131 E130 Printing, Dicing, Grinding, Life Testing & Module Fabrication • 2 dicing saws(1 existing,1 new) • New and existing screen printers • New grinding/polishing • Soldering (reflow) • Preparation benches • Thermal cycling cabinets(2 existing,1new) • Consumables compactus & cupboards

  3. E124 E125 E123 E126 E122 E127 E136 E128 E129 E136 E135 E137 E138 E131 E130 Solar Hybrid Laboratory • Prototype air conditioners • Pipes connecting to solar collectors • Thermal storage tanks • Heat exchanges

  4. E124 E125 E123 E126 E122 E127 E136 E128 E129 E136 E135 E137 E138 E131 E130 D.E. Use • Ben’s office • Welding & Grinding room

  5. E124 E125 E123 E126 E122 E127 E111 E128 E129 E136 E135 E137 E138 E131 E130 Shared Workshop Facility • Condensed essential equipment from the remainder of the current workshop spaces E112

  6. E124 E125 E123 E126 E122 E127 E111 E128 E129 E136 E135 E137 E138 E131 E130 ASI Foundation Laboratory • All interior walls removed • Opened through to E122 • 4 fume hoods E119 E112

  7. Shower Eye wash Laminar Flow Chem. Store Fume: tube cleaning Nd Ylf Laser Fume Fume Sample Store RTA Load station Table characterisation equipment Furnace Table microscope Chem. Jet Laser UV Laser Hand wash Fume Table 4 point probe Power Supply Overall dimension13500 x 8000 Hallway

More Related