1 / 9

TIED: A Cluster of One

TIED: A Cluster of One. TIED: Trial Integration Environment DETER. built on. TIED Federation Architecture. CEDL “Assembly Code” Standard Experiment Representation. Testbeds/ Aggregates. Experiment Creation Tool. Experiment Requirements. Experiment Creation Tool. Federator. Agg.

shalin
Télécharger la présentation

TIED: A Cluster of One

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TIED: A Cluster of One TIED: Trial Integration Environment DETER builton

  2. TIED Federation Architecture CEDL“Assembly Code” Standard Experiment Representation Testbeds/ Aggregates ExperimentCreation Tool Experiment Requirements ExperimentCreation Tool Federator Agg. Properties Experiment Topology ExperimentCreation Tool Agg. Properties Experiment Decomposition Tools

  3. Slice Creation: CEDLCanonical Experiment Description Language • Standard low-level experiment representation – “assembly code” • Output of all tools / input to Federator • Form of / alternative to Rspecs for experiment-wide specification • Expressiveness (today): • Core semantics: • Logical {nodes, links, elements} • Topology (ns2/Emulab) • Annotations: logical attributes (eg, node type) • Type information: router, switch, etc. • Physical selection: map to specific instance • Annotations: physical attributes • “Escapes” to allow physical configuration of hardware

  4. TIED Physical Infrastructure 6/09

  5. Experiment Methodology and The SEER Toolkit • Experimenters select from a palette of predefined elements: topology, traffic, instrumentation, etc. Skeleton palettes for original and customized experiments are available. • Methodology Engine frames standard, systematic questions that guide an experimenter in selecting and combining the right elements • Experiment Automation increases repeatability and efficiency by managing the experiment • Other work • Validating invariants and environment • Understanding and constraining risky behavior PALETTES TOPOLOGY TRAFFIC ATTACK DATA-CAPTURE METHODOLOGY & GUIDANCE ? EXPERIMENT AUTOMATION

  6. TIED

  7. Technical Elements

More Related