1 / 14

WEB site and DBs for the adoption of IPP by SMEs

WEB site and DBs for the adoption of IPP by SMEs. Integrated Product Policy (IPP): the new European policy for the environmental product management.

Télécharger la présentation

WEB site and DBs for the adoption of IPP by SMEs

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WEB site and DBs for the adoption of IPP by SMEs

  2. Integrated Product Policy (IPP):the new European policy for the environmental product management • The Integrated Product Policy is an integrated approach toenvironmental policies which seeks to improve environmental performances of products and services in a life cycle perspective. • IPP ambitions are: • to reduce products environmental impacts for its origin by considering the environmental impacts all along the Life Cycle of the Product, from cradle to grave and by co-operating with all the stakeholders of the Product Supply Chain • to foster the growth of green products and services markets by providing coherency with existing environmental requirements : • Environmental Product Declaration • Ecolabels • Green purchasing • Ecotaxes • Subsidies • Education

  3. Knowledge and specialised tools Low cost solutions IPP Innovation& gradualapproach Needs of SMEs to satisfy The sectors studies performed by the preparatory action during the years 2001-2002 on 150 SMEs in 5 European countries revealed fundamental needs for the implantation of IPP within the organizations: • Environmental improvementsshould be introduced withinnovation aspects through an integrated and gradual approach, at a low cost solution • SMEs needadapted knowledge, training and procedural toolsto choose the most suitable solution • LCA data have to beavailable, pre-elaboratedand provided with customised services

  4. Characteristics of the eLCA project • Makes part of the “e-Content” program of theEuropean Commission • Cross-sectorial projectthat involves SMEs, Public Information about IPP and Information & Communication Technologies • Its operative and final goal is the realization of amultilingual web portalin order to help the SMEs in the implantation of the IPP • Technical and economical testing of the web portalfor 1 year in 2 sectorsin order to improve it and create an entrepreneurial structure for its exploitationafter the funding period eLCA IPP PYMES ICT

  5. eLCA Multilingual web portal Co-operation projects Public and commercial agreements Main Goals of the project The main ambition of the eLCA project is tocontribute to the implantation of the IPP in the SMESby: • developing amultilingual webportalwhere SMEs will find all the elements to think about and start IPP • creating co-operation projectsbetween all the stakeholders involved in the Product Supply Chain of various industrial sectors (public bodies, business associations, firms, service providers,…) • combining public fundingin order to provide free access to dataand commercial agreements with experienced SMEs service providersin order to foster a market of on-line and off-line green services

  6. Services and content of the future portal (1/3) Five service’s classes, continuously upgraded and adapted to national or local characteristics: • General Information • Training packages • On-line support and consulting services • LCA databases • Specialised IPP softwares

  7. Services and content of the future portal (2/3) • General support information to provide all the necessary information about IPP : • IPP and SMEs • Analysis & Design Methods (LCA, ecodesign, benchmarking) • Market tools (ecolabel, EPD, ecotaxes) • Environmental Management Systems (EMAS, ISO14000, e. reporting) • Supportive Instruments (incentives, standards & regulations) • Databases of downloadable documents, bibliography and events • Training packages to diffuse the IPP knowledge within the organization : • On-line packages for self-training introductory courses • Downloadable materials for off-line training such as presentations, evaluation tests, … • General services to provide alternatives and accompaniment services : • Self assessment system for “non expert” users to suggest different paths in the portal • Access to on and off-line consultancy • “Ecoproducts Showroom”

  8. Services and content of the future portal (3/3) • General and specialised LCA Databases and Guidelines to identify and make available the relevant data • General Life Cycle Inventories databases • Specific databases and meta databases for six industrial sectors with economical and environmental relevance: hotels, wood/furniture, metal products, construction, electronics and electrical equipment, textile products. • Guidelines and case studies of best practices. • Specialised IPP softwares to choose the most suitable solutions: • Simplified LCA methodology, with related software tool and databases(eVerdEE) • Ecodesign software integrated with QFD parameters, to support the designer in the first phase of product development • Information system to integrate different software used by SMEs to managerelevant environmental data

  9. Dr. Sergio OliveroConsielvia val Formazza, 1020157 MilanoItalyTel +39 02 332081Mobile +39 335 781 78 64E-mail: soliver@tin.it Web site: www.allaxia.com

  10. Expected results:WEB site structure TOOLS COUNTRY TRAINING INFORMATION LANGUAGE ECO PRODUCTS SHOW ROOM

  11. Main Activities • Managerial and entrepreneurial activities • Awareness, dissemination • Technical activities • Development of a market of “green services” • Exploitation of test phase and Partners agreement • Awareness,dissemination and further development Plan Main goals • WEB site Implementation and testing • Collection, scientific review, final version of contents (including country and lingual adaptation) • Sector analyses (6 sectors) to produce sector specialised DBs, guidelines, etc. • General DBs • Specialised IPP software tools for SMEs (review of eVerdEE methodology and development of QFD-Ecodesign and Information System) • Testing of web site Management of test phase and after Creation of a WEB site management team Monitoring of business model Promotion of accompanying measures Marketing Awareness (Coordination committees, Conference, etc.) HW/ SW Design, implementation, review  Main activities

  12. COLLABORATION WITH THE PROJECTPrinciple of participative structure Through this EC funded research project, we expect to create a stable and durablenetworkof: • actors(experts, SMEs, public bodies, services providers, ...) • know-how(knowledge and tools) • opportunities(supply and demand of green services for the product improvement) To achieve this, we have adopted a participative organization structure where local actors may have a specific role.

  13. eLCA Consortium National Public Authorities Local public/ private bodies: associations, investigation centers, consulting firms, ... COLLABORATION WITH THE PROJECT:Possibilities of collaboration with external actors • Organisationof anetwork of excellence • Creation of an Integrated Project Structure • Promotionof the application of results • Development of new related projectswith new partners • Accompanying measuresfor sectorial projects, pilot initiatives and training seminars • Synergieswith national or sectorial programs • Adaptation of international contentsfor local conditions • Integration of local public contentsin the portal • Sponsorshipof the portal and of awareness events about IPP • Constitution of or participation inSectors Panels for the specification of LCA data • Development or sponsorship of guidelines of best practices • Supply of on/off-line green services through the portal • Organization ofawareness or/and training seminars

  14. COLLABORATION WITH THE PROJECTKey success factors of the project • Creation of anetwork of excellence: • Involvement oftwo governmentsand ofkey expertsin Europe • Synergieswith other European and international projects • Integrated project structure, with strong efforts on management and coordination of the tasks between the countries • Continuous analyse of the opportunities and barriers of the IPP market : • Economical and technical viability study realised in en 2000-2002 (preparatory action) • Market studies periodically upgraded, benchmarking of web-based innovative services, case studies in all the partners countries, ... • Proximity and adaptation of the proposed services: • “Think global and act local” • Creation of a communication and promotion platform • Qualitative and free public information yet available in order to achieve a relevant traffic level

More Related