1 / 17

PLANNING/SCHEDULING

PLANNING/SCHEDULING. Broadview / En résumé Planning Process Scheduled Maintenance Phase Forecasting Preventive Maintenance Cannibalization Management. WHY?. If you fail to plan you plan to fail Le manque de planification résulte toujours a l’échec des équipements.

shawn
Télécharger la présentation

PLANNING/SCHEDULING

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PLANNING/SCHEDULING • Broadview / En résumé • Planning Process • Scheduled Maintenance • Phase • Forecasting • Preventive Maintenance • Cannibalization Management

  2. WHY? If you fail to plan you plan to fail Le manque de planification résulte toujours a l’échec des équipements Disciplined scheduling will guarantee fleet health and mission accomplishment

  3. Planning Process • Factors important to consider when scheduling a/c for sortie generation • Supplies / pièces de rechange • Tools / outils • Facilities / établissement • Vehicles /véhicule • Equipment • Back-shop priority • Personnel / le personnel • Non-standard sortie generation challenges • Dispersed parking / parking disperser • Multiple aircraft configurations / différentes combinaison • Two person concept a / travailler deux personne • Additional security requirements / sécurité élever • Fuel load / montant de carburant • Dedicated preparation teams / équipe de maintenance

  4. Scheduled Maintenance Tools and Methods Planning cycle enables execution of flying hours consistent with flying requirements and maintenance capabilities • Pilot scheduling factors • Flying hour allocation • Adjustments to the schedule / règles pour changer l’emploi du temps • Attrition / usure • Weeklyschedule / emploi du temps hebdomadaire • Daily planning / emploi du temps quotidien • Scheduled preventive maintenance

  5. Aircraft Phase • Phase Flow is Fundamental when Building Flying Schedule / fondamental lorsque vous planifier les plans de vol • Hinders war-time readiness / entrave disponibilité d’être près • Running out of phase time • Too many aircraft low on hours • Thirds Rule • Top Third • Aggressively manage • Middle Third • Moderately manage • Bottom Third • Cursory manage

  6. FORECASTING • AIRCRAFT MAINTENANCE LEADERS MUST LOOK AS FAR INTO THE FUTURE AS POSSIBLE Les responsables ou dirigeant de maintenance doivent se focaliser sur le future • Holidays/runway closures/airfield construction • Flying Hour Program • Real world mission planning

  7. Mission Capability Status • Full Mission Capable (FMC) can do all assigned missions Capable pour toute mission • Partial Mission Capable (PMC) cannot do all of assigned missions Capable pour quelques missions • Not Mission Capable (NMC) cannot do any of its assigned missions Non-capable pour aucune mission

  8. Preventive Aircraft Maintenance • Purpose • Track equipment lifecycles / tenir a jour durée de vie des équipements • Identify and correct failure trends /rectifier les fautes récurrente • Ensure personnel have reliable equipment / rassurer que le personnel a accès a des équipements fiable • Minimize downtime & maximize sortie generation / rectifier le temps d’immobilisation • Safely and effectively operate aircraft / opéré les avions de manière prudent et efficace

  9. Preventive Aircraft Maintenance • Preventive maintenance concepts • Time change / temps de changement • Anticipate life expectancy / prévoir la durée de vie

  10. Preventive Aircraft Maintenance • Condition replacement • Unserviceable / non réparable • Component failure / équipement en panne • Identified as out of limits • Require regular inspection / inspections régulier

  11. Major Inspection / Inspection approfondi • More extensive • Consists primarily of certain components, areas and systems

  12. CANNIBALIZATION • RELIABILITY / fiabilité • SPARES FUNDING / manque de financement pour les pièces de rechanges • DEPOT SUPPORT PROCESSES TIP: Consolidate extensive maintenance

  13. CANNIBALIZATION • Remove part from another aircraft to repair Not Mission Capable aircraft with priority • Used as last resort Utilisé comme dernier recours • Supply avenues are exhausted and repair timeline cannot be met • Les avenues d’approvisionnement sont épuisés et la chronologie de réparation ne peut être satisfait

  14. CANNIBALIZATION OPTIONS • SHORT CYCLE (20 – 25 DAYS) • Principle of Maintaining a Healthy Fleet • EXTENDED CYCLE (45 – 60 DAYS) • Pros • Eliminates 3 – 6 CANN aircraft a year • Cons • More difficult rebuilds • More CANN PARTS • CONSOLIDATED CANN PROGRAM • CONCURRENT CANN/PHASE

  15. CANNIBALIZATION MANAGEMENT • Assign CANN manager • Coordinate with supply for delivery dates • Account/tag all hardware • Monitor Cannibalization actions • Meticulously maintain and inspect aircraft forms • Brief current status & LIMFACS • Produce accurate list of parts removed • Visual rebuild timelines

  16. Summary • Why planning • Planning Process • Scheduled Maintenance • Phase • Forecasting • Preventive Maintenance • Cannibalization Management

More Related