1 / 26

RPRLGSP: An International Good Practice in LG Development Support? June 2010

OFFICE OF THE DEPUTY PRIME MINISTER AND MINISTRY OF LOCAL GOVERNMENT. Rural Poverty Reduction and Local Government Support Programme. RPRLGSP: An International Good Practice in LG Development Support? June 2010. Presented by: Mrs. Hongo John Waithaka

shawna
Télécharger la présentation

RPRLGSP: An International Good Practice in LG Development Support? June 2010

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. OFFICE OF THE DEPUTY PRIME MINISTER AND MINISTRY OF LOCAL GOVERNMENT Rural Poverty Reduction and Local Government Support Programme RPRLGSP: An International Good Practice in LG Development Support?June 2010 Presented by: Mrs. Hongo John Waithaka KLGRP Programme Coordinator RPRLGSP Programme Coordinator

  2. Contents • RPRLGSP introduction • Results • Lessons Learned and Challenges

  3. RPRLGSP introduction

  4. RPRLGSP intro • Complementary support to Kenya’s LG reform programme • Specific objective: To improve accountability and LA responsiveness in delivering services to the poor • Planned Results: • Empowerment of rural communities in the development process enhanced • Capacity of LG in participatory planning and pro-poor service delivery • Policy Development supported • Government capable of transparent financial management

  5. RPRLGSP intro • Since 2006 (effectively); closure Sep 2010 • EU funded: €21m > €16.5m €5.5m de-committed (late start, limited capacity) • 34% capital project fund (PRF) • Funding mechanism: EDF9, captured in Gov’t budget, “sector budget support”, low-capacity NAO delegated management of TA to to EUD

  6. RPRLGSP Components +Budgets

  7. Results

  8. 1. Direct Support to KLGRP • Policy: Local Government Sector Reform Strategy • Governance: Service Delivery Tools • Finance: LAIFOMS + Financial Reporting Template + Revenue Enhancement • SD funding: LATF + HPA • M&E: LG Performance Audit system

  9. 1. Direct Support to KLGRP

  10. 2. Capacity Building • Capacity Building: • Training at LAs + MoLG + Communities • Building of better systems at GoK/MoLG + LA • Support fields: • Financial Management • Project Management • Community participation and LASDAP

  11. 3. PRF Projects • 65 capital service delivery projects in 63 LAs • EU co-funded: €5.5m (33% of total Progr. budget)

  12. Markets

  13. Health centres

  14. Water & Sanitation

  15. Schools

  16. Roads

  17. 3. PRF • 88% in operation > high success rate, compared to regular local service delivery

  18. 3. PRF • Minimal public money wasted in corruption and poor service delivery. • Intensive monitoring and sanctions lead to less donor money in Service Delivery: only 80% of available PRF budget actually paid out to LAs; 20% back to EU • Lessons learned in PRF informed KLGRP capacity building and systems, incl. Service Delivery Tools, LASDAP, LA Performance Audit system • High cost of PRF support and monitoring (€2.2m vs. €5.5m PRF budget, 40%), but good results, thus value for money

  19. Lessons Learned and Challenges

  20. Lessons Learned • Integration of infrastructure project support, capacity building and policy support creates synergy; Support to governance and cap bldg essential to success of infrastructure • Structure of RPRLGSP faulty with separate PMU outside KLGRP or other existing MoLG department • Resulted in (1) less Gov't ownership in some capacity building initiatives, (2) sub-optimal coordination

  21. Lessons Learned • Start Programme only once appropriate technical skills committed by Ministry and Ministry budget for clearly defined Government contribution. Appoint TAs early. • Inadequate time frame and funding for major dissemination and capacity building. Need for SWAp bringing in other donors into consistent 10 yr programme • Avoid parallel systems, funnel funds through existing transfer systems (to be used to apply sanctions) • Dichotomy between targeting the poor (generally in low resource base LAs) and wanting high implementation rate • Utilise Gov’t structures where possible especially at local level.  TA to support Government.

  22. Need for “4S” approach in Programme design

  23. Way Forward • Develop SWAp based on LG Reform Strategy • All reform initiatives to be derived from SWAp and within 10 year minimum time horizon • Ongoing EU and other DP support through pool funding of SWAp • 10th EDF support to MoLG, NSAs now available. • World Bank 5-10 year support to KLGRP and pilot urban LAs commencing 2010. To be integrated into SWAp

  24. Lessons Learned • Conclusion: Interesting LG support programme, worth studying/learning lessons from (+ and -).

  25. Republic Of Kenya Ministry Of Local Government RPRLGSP Contact Details MINISTRY OF LOCAL GOVERNMENT Suite 805, Cianda House, Koinange St. P.O. Box 30004, NAIROBI, Kenya Tel: +254 (20) 204 8151 Fax: +254 (20) 204 8166 Email: info@RPRLGSP.go.ke Web: www.RPRLGSP.go.ke Programme Coordinator: John Karuga Waithaka

  26. Transforming Local Government!

More Related