220 likes | 428 Vues
The Science of Quality By Design. Janet Woodcock, M.D. May 19, 2004. What Science underlies the quality of Medical Products?. Medical products must be mass produced for use in healthcare settings Product must be designed to fulfill intended use reliably
E N D
The Science of Quality By Design Janet Woodcock, M.D. May 19, 2004
What Science underlies the quality of Medical Products? • Medical products must be mass produced for use in healthcare settings • Product must be designed to fulfill intended use reliably • Manufacturing process must be designed to reliably produce a consistent product • Underlying science is NOT just the medical science
Critical Path: Industrialization Dimension • Product Design • Material properties of components • Toxicologic properties of component • Biological properties • Feasibility of manufacture • Characterizability • Relationship of specifications to performance • Exploration of alternatives
Critical Path: Industrialization Dimension • Process Design • Reliability • Robustness • Amenable to feedback control • Human Factors • [Experts will discuss!]
Quality by Design • Stipulate (postulate) key performance parameters early in development process • Design product & process to be robust for these parameters
Quality by Design(cont.) • Experimentally determine sensitivity of parameters to changes in input or process or use (e.g. human factors) • Incorporate new information from clinical trials and experience
The Science of Quality by Design • The less you know about what is important to quality, the more factors you need to control (both regulators & manufacturers) • Scientific efforts needed to identify important factors in both product and process and then to control variability in these factors • Techniques include DOE, risk management techniques, statistical process control, FEMA, & human factors analysis
Goal: Consistent High Quality • But if you want to design quality in – how do you define quality? • Need consensus definition – regulators and manufacturers
A Common Definition of Quality: A product or service that meets/exceeds customer’s needs
Regulatory Context: Medical Product Quality • Customer/market can’t easily or rapidly evaluate critical attributes of performance (e.g., safety & efficacy) due to nature of products (“market failure”) • Much is at stake (life, health) so don’t just let market sort it out
Regulatory Context: Medical Product Quality • Therefore, by statute, FDA stands in for the customer and establishes & enforces quality standards in the realm of “clinical performance” • Clinical performance = delivery of efficacy and safety as described in the label, derived from the clinical trials • Not aesthetics, price, other consumer-defined attributes
Who are the Customers? • Primary = people who take medicine (and their parents, caregivers, relatives, etc) or use medical devices • Secondary = overall, public has a stake health professionals who prescribe and dispense medicine or medical devices
Regulator’s Definition of Quality • Outcome based – delivers clinical performance as expected • Surrogate = “fitness for use” • Regulators define “fitness for use” via standards promulgated and attributes regulated
A product that is “fit for use” meets its established quality attributes standards, for example • Purity • Potency/strength • Identity • Bioavailability/delivery • Labeling/packaging • Physical performance (including aspects that influence adherence and acceptability
Another regulatory quality attribute: “made in compliance with cGMPs” - Therefore - cGMP requirements should support achieving the consensus definition of quality
From the point of view of the customers: An important quality metric for a pharmaceutical is availability
Issue: How does surrogate “fit for use” relate to ultimate metric “clinical performance”?
Relationship: Fitness for use -Clinical Performance • We generally lack information except at the extremes • “Fitness-for-use” not a complete surrogate due to lack of information
Quality by Design: A Way Forward • Prospectively designate critical quality parameter during development (product & process) • Evaluate and refine • Create robust link between process parameter, specifications and clinical performance
Summary • There are key scientific disciplines relevant to the development, design and control of medical products and the processes used to manufacture them • A consensus definition of quality needs to be developed
Summary (cont.) • “Quality by Design” refers to making the link between the desired clinical performance parameters and the design & control parameters • The following talks give more in-depth examples of the scientific application of these principles