An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SA12-PE-04Feedwater System Multidiscipline Review (Deep Dive) January 24, 2013

  2. SA12-PE-04 Purpose and Scope • The purpose of this self assessment is to conduct a multi-discipline team review (deep dive) of the Feedwater System following Recommendation #8 from INPO IER Level 2 11-2, 2009-2010 Scram Analysis . This evaluation will be performed to validate the effectiveness of station processes to identify, track, and resolve off-normal or low margin conditions in the Feedwater System using the attributes listed below.

  3. INPO Event Report, Level 2, 2009-2010 Scram AnalysisRecommendation #8 • Conduct a multidiscipline team review (deep dive) of at least two systems or components that have been identified as significant contributors to plant scrams in this scram analysis or by station-specific analyses. Attachment 5, Technical Data Analysis, provides a list of scram-significant systems for each NSSS type to assist in determining scram-risk-significant systems. These evaluations will be performed to validate the effectiveness of station processes to identify, track, and resolve off-normal or low margin conditions.

  4. SA12-PE-04 Team • Host Manager: Kirk Weir • Team Leader: Tod Welsh • Team Members: • James Alston, STP FW System Engineer, External Peer • John Waters, Engineering Specialist III, PSE

  5. Performance Objective 1 • Determine whether or not the Feedwater system is or is not being operated as designed. Include current configurations, operator workarounds and burdens, disabled annunciators/alarms, and controls being operated in manual (vs. automatic).

  6. Performance Objective 2 • Determine if deficiencies exist in the Feedwater equipment, to include corrective and deficient critical and noncritical backlogs, which lower system reliability.

  7. Performance Objective 3 • Verify relevant internal and industry OE and vendor recommendations are reviewed for applicability for the FW system.

  8. Performance Objective 4 • Verify FW design changes applicable to off-normal or low margin conditions are addressed.

  9. Performance Objective 5 • Verify preventive maintenance work not excessively deferred for FW.

  10. Performance Objective 6 • Verify previous corrective actions to resolve Feedwater system and component vulnerabilities to scrams and transients have been effective.

  11. Performance Objective 7 • Verify that identified Feedwater issues are appropriately captured in system and component health reports and in the corrective action program

  12. Questions?