1 / 15

OSHA Subpart R Steel Erection

Before authorizing the start of steel erection

shubha
Télécharger la présentation

OSHA Subpart R Steel Erection

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    1. OSHA Subpart R Steel Erection

    2. Before authorizing the start of steel erection Concrete footings, piers, and walls has attained the necessary strength by testing, 75% of the intended min. compressive design strength or sufficient strength to support the loads imposed during steel erection

    3. Pre-shift visual Crane inspection Safety devices, boom angle indicator, boom stops, anti-two block devices, load moment indicators Wire rope Hydraulic fluid levels Tire inflation Ground conditions (no water) Level ground *

    4. No Riding of the Headache Ball

    5. No employees are to work under suspended loads

    6. Multiple lift rigging

    7. No more than 8 floors from the erection floor and the permanent floor

    8. No more than 4 floors or 48 feet of unfinished bolting or welding above the uppermost permanently secured floor

    11. Covers for Roof and Floor Openings

More Related