1 / 22

Capital Improvement Program

Capital Improvement Program. City of Warren, Ohio April 2012. Parkman Road Improvements . Phase 1 (2008) - $2 million Phase 2 (2011) - $1 million Phase 3 (2014) - $3 million Parkman Road Bridge (2012) - $4.6 million Collective Cost = Over $10 million. Parkman Road Improvements – Phase 1.

sierra
Télécharger la présentation

Capital Improvement Program

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Capital Improvement Program City of Warren, Ohio April 2012

  2. Parkman Road Improvements • Phase 1 (2008) - $2 million • Phase 2 (2011) - $1 million • Phase 3 (2014) - $3 million • Parkman Road Bridge (2012) - $4.6 million • Collective Cost = Over $10 million

  3. Parkman Road Improvements – Phase 1 • Constructed 2008 – 2009 • West Market Street to west of Linda Drive NW • $2 Million • 100% funded through ODOT and FHWA

  4. Parkman Road Improvements – Phase 2 • Constructed in 2011 • Southern Blvd. north to City Limits • $1 Million • 100% funded through ODOT and FHWA

  5. Parkman Road Improvements – Phase 3 • Scheduled for 2014 • Linda Drive to Southern Blvd. • New 5 lane roadway with left turn lanes between Southern Blvd. & Coit Ave. NW to eliminate left turn accidents. • $3 Million • 80% funded through ODOT and FHWA

  6. Parkman Road Bridge Project • Is currently under construction – 2012 • Bridge Replacement • Left turn lanes at Tod Ave. & Lovers Lane • $4.6 million • Traditional ODOT Project • Local Share is $28,000 (1/2% of total cost)

  7. Warren Boulevard Bridge Project • This year - 2012 • US 422 Bridge Replacement • Over railroad between Logan and Chestnut • $2 million • Traditional ODOT Project • 100% funded through ODOT and FHWA

  8. Lovers Lane Reconstruction • Between 2003 and 2009 there were 25 accidents on Lovers Lane. • 21 of the 25 accidents were single car failure-to-control accidents.

  9. Lovers Lane – Phase 1 • Reconstructed a vertical curve by cutting existing hill near the Warren Twp. Cemetery

  10. Lovers Lane – Phase 1 • Visibility and safety was improved by paint striping, guardrail, signage and clearing vegetation.

  11. Lovers Lane Reconstruction – Ph 1 • Resurfaced from West Market Street to Williamsburg Street. • Also resurfaced and striped portions of: • Southern Blvd. • Paige Ave. • Perkinswood Blvd. • 2011 - Phase 1 - $400,000 – Issue 2

  12. Lovers Lane Reconstruction – Ph 2 • An 800 foot section near Starlite Drive will be reconstructed to new grade. • New guardrail, signage, paint striping, and clearing of vegetation along the roadway.

  13. Lovers Lane Reconstruction – Ph 2 • Resurfacing from Williamsburg Street to Parkman Rd. • Also resurfacing portions of: • Southern Blvd. • Perkinswood Blvd. • Atlantic St. • Laird Ave. • Berkshire Dr. • Harvard Dr. • 2012 - Phase 2 - $900,000 – Issue 2

  14. CBD Road Projects: TRU- Park Ave. • Will be constructed this summer (2012) • Fulton Street to the northern city limits. • Cost is $650,000 • ODOT/FHWA and Issue 2 Funding (100%).

  15. CBD Road Projects Continued: • South Street & Summit Street Resurfacing • 2011 (Traditional ODOT) • Cost $1 million • TRU - High Street Resurfacing Project • 2010 • Cost - $365,000 • TRU – 45 (Mahoning Ave.) Reconstruction • 2010 • Cost - $475,000 • TRU - East Market St. Reconstruction • 2008 – 2009 • Cost - $1.8 million

  16. Upcoming Federal Projects • 2013 - Niles Road - $550,000 • 2014 - Pine Avenue - $900,00 • 2015 - Palmyra Road, Highland Ave. & Main Ave. - $2 million • 2016 - West Market St. - $2.5 million • Collective Cost = $6 million

  17. Requesting Federal & State Funds: • Youngstown Road Reconstruction • Laird Ave. to Ridge Road • $4 million • Youngstown Road Resurfacing • Ridge Road to North Road • $1 million

  18. Gateway Improvements • Decorative Crosswalks (2009 & 2010) • Mahoning Avenue Lighting (2010) • Warren Boulevard Trees (2011) • Community Signs (Future Project)

  19. City Sign Ordinance • The City of Warren is presently reviewing its sign ordinance and discussing adoption of new regulations.

  20. Greenway Bike Trail • Phase 1 (2011) - $1.2 million • Phase 2 (2012) - $1.4 million

  21. Riverwalk Project • Trails through Bullhead Park (Footbridge) • Stone retaining wall repair at Packard Park • Trails along river at Burbank Park • Trails through the Lovers Lane parklands • Overlook at the Mahoningside Property • FHWA – $1.1 million – 2012 or 2013

  22. Capital Improvement Program The opportunity to present the City of Warren’s Capital Improvement Program is greatly appreciated. We look forward to implementing the plan and serving the citizens of the community. Thank you.