ABCON MARINE SL-PRODUCTS

ABCON MARINE SL-PRODUCTS. ABCON Stop Leak products. What causes leaks in stern tubes, tunnel thrusters and CPPs? Insufficient lubrication of seals during dry docking Oil film pressed out under stand still Fishing lines pulled into seals

Télécharger la présentation

ABCON MARINE SL-PRODUCTS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ABCON MARINE SL-PRODUCTS

  2. ABCON Stop Leak products • What causes leaks in stern tubes, tunnel thrusters and CPPs? • Insufficient lubrication of seals during dry docking • Oil film pressed out under stand still • Fishing lines pulled into seals • Sand and other impurities damaging seals when passing through shallow waters (eg, harbors and rivers) • What do ABCON SL products do? • Specifically designed teflon particles form a barrier in the gap between the rubber seal and shaft surface • Other additives improve the quality of rubber seals

  3. ABCON SL Case Example: Stern Tube Seal Leak • 4,100 tdw coaster • Lost 100 L/day in May 2006 • After 24 hours of adding 10% ABCON-STERN TUBE SL, leakage was reduced to 2-3 L/day • Vessel continued to sail without further repair (for 1.5 years) until planned dry docking in late 2007, where new seals were installed

  4. ABCON SL Case Example:Bow Thruster • 16,000 tdwferry • Bowthrusterbeganleaking in November 2007 • ABCON-THRUSTER SL wasadded and leakage stopped • Additionalbenefitsseen • Vibrations beforewere 3.7 mm/sec • Vibrations afterwere 2.8 mm/sec • Vibrations a newlyreconditioned 2.2 mm/sec Shows a layer of teflon has beenadded to shaft

  5. ABCON SL Case Example:Thruster • 16,000 tdw ferry • March 2008: scheduled dry docking • Thruster motor shaft bevel was worn, hardened gear tooth surface was compromised and iron content in lube oil was exceeding limits • Rolls Royce could not supply replacement shaft for 8 months • ABCON-THRUSTER+ and ++ was added (40 L total volume) • Teflon particles permanently adhered to surface of gear teeth, provided lubrication which reduced gear friction and iron levels in lube oil to allowable limits • January 2009: ABCON visits Rolls Royce in Aalborg • Rolls Royce confirms ferry has not ordered spare parts to date • March 2013: no replacement parts ordered since as: • Ferry S/I reported bevel continues to function well • Since iron level is acceptable, class approved continued operation

  6. Customer Testimonial 29. July 2012 We have had the great pleasure of using your products for our stern tubes, tunnel thrusters and conventional seals. I am planning to dock Princesse Benedicte in week 44-45 at Orskov Shipyard, but I do not intend to open the stern tube stuffing boxes as they are very tight. We have gone from 2 years to 4 year-intervals between overhauls. With kind regards, Fini Alsted Hansen Technical Superintendent, Fleet Management Scandlines Danmark AS

  7. Customer Testimonial 18. August 2012 Yesterday we received your product. I must confess I am on the verge of being religious. For more than 16 years I have worked in various ships, fishing and off shore, but never have I seen anything more effective. After 3-4 hours the leakage had so to say gone. Alternatively we had to go to dry dock plus 6 weeks waiting time for a new stern tube seal. Med vennlig hilsen / Best regards Sigmund Roksvåg Chief Engineer MV Eidsvaag Vega Eidsvaag AS Gurvikdal, N-7270 Dyrvik, Norway

  8. Attitude of Equipment Suppliers • Suppliers recommend repairing damaged seals immediately • Ship owner has 4 choices • Go to dry dock for repair • Call for a specialized underwater repair team • Add thicker lube oil • Use staff on-board vessel to fill ABCON SL product

  9. ABCON STERN TUBE SL/SLL Product Application Fill product into header tank B or C

  10. ABCON Product Formulation Advantages • ABCON products are delivered as a concentrated paste, resulting in: • Lower product prices • Lower transport prices via unrestricted Air Cargo, including all passenger planes (non-dangerous goods) • Easy to handle on board vessel • Delivered in 5, 10 and 20 L pails

  11. ABCON Stop Leak products • ABCON MARINE-STERN TUBE SL • ABCON MARINE-STERN TUBE SLL • ABCON MARINE-STERN TUBE CSL • ABCON MARINE-STERN TUBE BSL • ABCON MARINE-STERN TUBE BSLL • ABCON MARINE-THRUSTER SL • ABCON MARINE-THRUSTER SLL • ABCON MARINE-HYDRAULICS SL More than 150 vessels have been treated with ABCON MARINE - STOP LEAK products

More Related