Strategic Plan and Economic Upgrade Process

Strategic Plan and Economic Upgrade Process. 2007 Transmission Summit July 31, 2007 New Orleans, Louisiana. Strategic Plan. 10-Year Study 2015 Summer Peak Develop alternate dispatch scenario to more closely reflect real-time dispatch

sonja
Télécharger la présentation

Strategic Plan and Economic Upgrade Process

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Strategic Plan and Economic Upgrade Process 2007 Transmission SummitJuly 31, 2007New Orleans, Louisiana

  2. Strategic Plan • 10-Year Study • 2015 Summer Peak • Develop alternate dispatch scenario to more closely reflect real-time dispatch • Review historical generation patterns to determine what generation does not typically run • Possibly run a minimum load case

  3. Strategic Plan: Goals • Address frequently TLR’d flowgates • Remove or reduce the need for RMR generation • Address frequently constraining flowgates in the AFC process • Address long-standing reliability problems • Webre-Wells • Sheridan South • Base case contingency overloads • Terminal equipment limited flowgates • Existing inter-area transfer limits • EES-SPP (ANO-Ft. Smith) • EES-SOCO • EES-TVA

  4. Strategic Plan: Goals • Tie in with SPP 765kV plans • Work with other RTO projects • Ozark study • Accommodate new generation interconnections • Improve existing import limits (Amite South, DSG, WOTAB)

  5. Strategic Plan: Specific Focus Areas • Acadiana • McAdams • Webre-Wells • DSG • Amite South • Arkansas 161 kV • Stability Limits • Mt. Olive – Hartburg • Webre – Wells • Franklin – McKnight

  6. Strategic Plan: Specific Focus Areas • Danville – N. Magazine • Mablevale/Little Rock Import • Western Region • El Dorado • Bogalusa • ISES, Whitebluff (possible double transformer contingency)

  7. Strategic Plan: This Year • High-level Analysis • Thermal & Voltage Analyses • N-1-1 in Load Pockets • Starting Point for Discussion

  8. Strategic Plan: Future • Stability • Short Circuit • More detailed analysis • Production Cost

  9. Economic Upgrades • ICT will identify potential economic upgrades based on: frequent TLR’s, frequently constrained flowgates, WPP results, RMR’s, etc. • Preliminary Analysis will be posted. • ICT will provide an estimate of potential benefits: increased MW flow, reduction in congestion, cost savings, etc. • Customers may request a study of a specific upgrade, including a Facility Study. • Separate Queue • NITSA/Pre-888, PTP Request, IOA/LGIA required to proceed with construction

  10. Economic Upgrades • Customers may fund upgrades at their discretion. • Any new dispatch made possible by an upgrade will be reflected in models. • ICT will report to regulators on Economic Upgrade activities.

  11. Super-Regional Summits • Continue to hold Entergy ICT Summit • Possibility of Entergy / CLECO / SPP / LAFA / ETEC / Other Transmission Owners Summit • Possibility of Entergy / SERC Region Summit

  12. Jody HollandManager, ICT Planning501-614-3315jholland@spp.org