50 likes | 158 Vues
This engineering review covers key aspects from Q1 2007, including the modification of the upper crane heater and related progress. The heater control circuit has been successfully modified, and updated drawings have been issued. Current open issues include the unknown time delay required for heating, but no scheduled activities or financial concerns have been noted. Looking ahead into Q2 2007, there are no planned activities at this time, highlighting a period of stabilization and assessment.
E N D
Highlights (Q1/2007) • Upper crane heater modification LBT Q1 2007 Engineering Review
Open Issues • Technical • Time delay required for heating unknown • Schedule • None • Financial • None • Resource • None LBT Q1 2007 Engineering Review
Progress (Q1/2007) • Heater control circuit modified • Drawings updated and issued LBT Q1 2007 Engineering Review
Planning (Q2/2007) • No scheduled activities LBT Q1 2007 Engineering Review