An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ROADMAP FOR IMPLEMENTATION OF HCFC PHASE-OUT IN INDIA OZONE CELL GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT AND FORESTS

  2. ACCELERATED PHASEOUT OF HCFCs The 19th Meeting of Parties (MOP) held in Sept. 2007, in Montreal decided (Decision XIX/6) to advance the phase-out of production and consumption of HCFCs by 10 years for an early recovery of Ozone Layer

  3. TIMELINE Baseline : average of 2009 and 2010 production and consumption Freeze : 2013 10 % reduction of baseline in 2015 35 % reduction of baseline in 2020 67.5 % reduction of baseline in 2025 100% phase-out in 2030 HCFC PHASE-OUT SCHEDULE – Article 5 Parties Allowing for servicing an annual average of 2.5% during the period 2030-2040

  4. KEY CHALLENGES IN PHASING-OUT OF HCFCs • Period for Change-Over is Short especially for first stage reduction targets • Approximately 30 to 40% reduction of the base line HCFC consumption in few years (by 2015) • Technical Options especially the low-GWP options are still emerging. • HFCs are the main options to HCFCs for most of the applications in refrigeration and air-conditioning. • HFCs are the potent Green House Gases (GHG) and emissions of these gases are controlled under Kyoto Protocol

  5. STRATEGY FOR MEETING CHELLENGES IN PHASING OUT HCFCs • The roadmap was developed and launched with a long term vision, initiatives and action plan as early as October, 2009. • Policy instruments are being aligned to meet the needs of accelerated phase-out schedule of HCFCs. • Institutional Set-up is being strengthened to cater the needs of HCFC phase-out. • UNDP as Lead Agency in Association with UNEP,UNIDO, World Bank Govt. Germany (bilateral agency) is responsible for preparation and implementation of HPMP

  6. BACKGROUND • HCFCs are widely used chemicals. The applications include, Refrigeration & Air-conditioning (RAC) manufacturing, Foam, Aerosols, fire-extinguishing, RAC servicing etc. • There are a number of chemicals which fall in this category like HCFC-22, HCFC-141b, HCHC-142b, HCFC-123, HCFC-225 and HCFC-124 • All these chemicals are the Ozone Depleting Substances (ODSs) and are controlled by the Montreal Protocol in the schedule Annex C Group 1 Substances

  7. OVERALL OBJECTIVES • Phase-out of production and consumption of HCFCs in accordance with the Montreal Protocol accelerated phase-out schedule without any commercial and financial dislocations in the country • Achieving compliance target set by the Montreal Protocol for stage-I - Establishment of base-line production and consumption sectors – an average of 2009 and 2010 for production and consumption respectively. - 2013 freeze - 10% reduction of baseline in 2015

  8. REVIEW AND AMMENDMENT OF NATIONAL ODS PHASE-OUT POLICY SUPPORT INSTRUMENTS ACTIONS: • National policy instruments including ODS (Regulation and Control) Rules, 2000 & its amendments are being aligned to cater the needs of HCFC phase-out. • ODS control enforcement Measures and custom policies are being strengthened with regard to ODSs especially HCFCs to prevent illegal trade, if any • Existing fiscal incentives to promote non-ODS technologies to HCFCs are being extended for smooth implementation of HPMP.

  9. AWARENESS AMONG STAKEHOLDERS ACTIONS: • Awareness and communication strategy for implementation of HPMP has been developed in close cooperation with UNEP with the following objectives: • Identification of Stakeholders • Interactions with the stakeholders at the regional and national level • Sensitization of Stake holders and users towards Environmental Concerns • Ensuring participation of key stakeholders – Industry/ Industry Associations, NGOs, Research Institutions, Concerned Ministries/ Departments, Defense, Space Research, Shipping, Indian Railways etc. • A number of awareness workshops have been organized in the past two years in various cities.

  10. ESTABLISHING SUPPLY AND DEMAND SCENARIOS ACTIONS: • Country-wide Sectoral Surveys have been conducted to identify the enterprises consuming HCFCs. • Reach-out Workshops have been organized in the past two years at National and Regional levels to create awareness. • Data on HCFC production and consumption for the baseline years have been obtained from the enterprises and collated. • Overall growth patterns of HCFCs consumption based on the data and commensurate with National GDP and Economic growth are being derived. • Demand and Supply Scenarios are being developed.

  11. SECTOR SPECIFIC STRATEGY ACTIONS: • Sector Specific Strategy Groups: Sectoral Working Groups Meeting was organized at New Delhi in September 2009, where Industry Association (s), User Organizations, Research Institutions and other stakeholders participated in the meeting. • Following actions are in progress: • Identification of Applications Addressing the Sector & Sub-Sectors • Establishment of sector-wise/ and/or sub-sector-wise growth rates • Estimation of sector-specific consumption for the freeze year • Assessment of application specific, energy efficient, economically viable alternative technologies • Assessment of technology transfer through MLF • Information dissemination on alternative technologies through Sector Specific national/regional level workshops/ conferences

  12. INDIVIDUAL INDUSTRY SPECIFIC PROJECTS PREPERATION ACTIONS: • Prioritization of the sub-sectors for Stage-I Phase-out targets • Identification of eligible enterprises for MLF Assistance in various prioritized sub-sectors • Creation of interest among the industry partners through awareness to convert their manufacturing facilities to non-ODS at an early stage • Technical assistance for project preparation through Implementing Agencies • Review and endorsement by MoEF, Govt. of India • Review and Monitoring of implementation at enterprise level projects to achieve the desired ODS reduction impacts.

  13. SECTOR PHASE-OUT PLAN FOR SMALL AND MEDIUM ENTERPRISES ACTIONS: • Strategy for Reach-out to the Small/Medium Sectors • Identification of clusters of enterprises and assessment of their needs related to phase-out of HCFCs • Demonstration of proven and adaptable Application Specific Alternative non-ODS technologies • Development of Application Specific Group Projects with the help of Implementing Agencies • Technical and Financial Assistance through MLF funding mechanism for Conversion of manufacturing facilities and Operational Costs • Implementation and Monitoring of Time-bound Conversion Projects

  14. SERVICING SECTOR HCFC PHASE-OUT OF PLAN ACTIONS: • National survey for identification of refrigeration and air-conditioning servicing enterprises and technicians employed • Assessment of training and equipment needs of refrigeration servicing enterprises • Up-gradation of existing training network set-up under National CFC Phase-out Plan (NCCoPP) to cater to the needs of HCFC phase-out • Strategy for providing training to minimize the use of HCFCs and adoption of alternative technologies is being developed • Implementation and monitoring of servicing sector plan

  15. UPDATING HCFC PHASE-OUT STRATEGY ACTION : • Review of Initiatives and Actions based on Lessons learned and modify/adjust them to cater needs of Stage-II phase-out targets:2020,2025 and complete phase-out in 2030 in consultation with Stake-holders.

  16. THANK YOU