An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ALARA Programs & Occupational Dose Trend in Wolsong NPP Korea Hydro & Nuclear Power Co., Ltd Wolsong Nuclear Power Plant Unit 3&4

  2. Contents • Introduction of Wolsong NPP • Brief History of Wolsong NPP • Generation Capacity of Wolsong NPP • History of Korea Regulatory Law • ALARA program improvements in KHNP • ALARA Program before 2000 • ALARA Program after 2000 • Calling ALARA Committee & Making Decision • General Review of ALARA Program • Cases of Improvements • Results of ALARA Program Improvements • Conclusions

  3. Brief History of Wolsong • 1975.10: Opening of Wolsong NPP construction office • 1983. 4: Commercial operation of unit #1 • 1997. 6: Commercial operation of unit #2 • 1998. 6: Commercial operation of unit #3 • 1999. 9: Commercial operation of unit #4

  4. Generation Capacity of Wolsong • Generation Capacity: Total 2,778 MW

  5. History of Korea Regulatory Law • Korea regulatory law in radiation protection • 1958 : Establish the atomic act • 1983 : General revision based on ICRP-9(MPD, MPAD, MPC) • 1994 : Include the concept of “ALARA” • 1996 : Apply the dose limit concept (no quarterly limit) • 1998 : Apply 100mSv/5yr (50mSv/yr maximum) to effective dose limit but 200mSv/5yr until 2002 • 1999 : Require to implement “ALARA” • 2001 : Apply the concept of ALI, DAC

  6. ALARA Prog. Improvements in KHNP • Before 2000 : Plant specific ALARA procedure • After 2000. 10 : Standard ALARA procedure

  7. ALARA Program before 2000 • ALARA Committee

  8. ALARA Program before 2000 • ALARA ImplementationCommittee

  9. ALARA Program after 2000 • Organization ofALARA Committee

  10. ALARA Program after 2000 • Responsibility of ALARA Committee • General reviews & approval of ALARA program • RP Policy, Annual Target, Long-term ALARA strategy etc • If expected dose for work is above 200 man-mSv • Review & approve radiation protection optimization plan • Review ALARA results after work if actual doseexceeded by 25% more than expected dose • Review & approve radiation safety control plan during O/H periods • Reviews & approval of optimization plan for radiation protection when requested by chairman

  11. ALARA Program after 2000 • Organization of ALARA Implementation Committee

  12. ALARA Program after 2000 • Responsibility of ALARA Implementation Commit. • If expected dose for work is above 70~200 man-mSv • Review & approve radiation protection optimization planning • Review ALARA results after work if actual doseexceeded by 25% more than expected dose • Review & approve radiation safety control plan for following workplace • If airborne tritium concentration exceeds 10DAC • If expected dose exceeds 10 man-mSv • Review & approval of optimization plan for radiation protection when requested by chairman

  13. Call ALARA Commit.& Make Decision • Minimum 50% of the committee membership must be attended • Issued meeting agenda must be agreed by two-thirds of the attendee • Urgent items & imperative cases can be decided in writing by the committee members without the committee meeting

  14. ALARA Documentation

  15. Reviews of ALARA Program Any Works Expected Dose 10 ~ 70 man-mSv Expected Dose 70 ~ 200 man-mSv Expected Dose over 200 man-mSv Expected dose under 10 man-mSv Use general RWP - Use RWP - Evaluate expected dose every work steps Work group makes & submits to rad. section - expected dose sheet - ALARA check list Work group makes & submits to rad. section - expected dose sheet - ALARA check list Perform works Perform works Open ALARA Implementation committee Review & approve - expected dose sheet - ALARA check list Open ALARA committee Review & approve - expected dose sheet - ALARA check list Perform works Perform works A B

  16. Reviews of ALARA Program A B Review after works Review after work If actual dose exceeds 25% of expected dose If actual dose exceeds 25% of expected dose Open ALARA Implementation committee Review & discuss & apply - dose reduction method to hereafter works Open ALARA committee Review & discuss & apply - dose reduction method to hereafter works

  17. Cases of Improvements • High internal exposure dose (IED) in Wolsong NPP • Internal exposure dose of PHWR is higher than that of PWR • Furthermore, IED reaches up to 40% of EED in the beginning of operation • Internal exposure is mainly caused by airborne tritium The Comparison of Occupational Dose

  18. Cases of Improvements • The Improvement of the Respirator using Ice Cubes • Tritium removal media: replace vermiculate and paper filter by ice cubes • Year of development: 1992 • Components: canister, half face mask, rubber hose • Ice cube mass: 670g/canister • Tritium removal efficiency: above 95% within 2 hours • Improvements • The prevention of solid rad-waste generation • The respiration became fresher and less stifling • Easy-to-get and cost-effective tritium removal medium

  19. Cases of Improvements • The Development of Movable Tritium Eliminator • Application • D2O leak from moderator and coolant system • Spills from equipment failure • Maintenance for the systems or facilities including tritium • Purpose • Preventing diffusion of airborne tritium • Reducing internal exposure of workers • Tritium removal mechanism • Adsorption of airborne tritium into water

  20. Cases of Improvements • The Other Efforts for IED Reduction • Use of temporary ventilation fan and duct • Use of portable air tent • Improvement of D2O collection tools • Development of dryer used for decontamination paper

  21. Results of ALARA program • Diminishment of internal exposure dose • Internal exposure dose of PHWR has been diminished • Portion of IED have decreased to half of previous’ • Result of continuous efforts to reduce airborne tritium Occupational dose for Wolsong NPP1 Occupational dose for Wolsong NNP2

  22. Results of ALARA program • Decrease in Exposure Dose • Annual dose has not increased (but no. of units increased) • Average dose per person & unit have been diminished Annual dose & no. of operating units Annual Avg. Dose per unit & person

  23. Annual radiation exposure dose per PHWR plant

  24. Results of ALARA program • Diminishment of Over-exposure Workers • No. of over-exposure workers exceeded 20mSv/yearhas increased before 1990. • There was no over-exposure workers for last 7 years Status of over-exposure workers

  25. Remark: 1) was happened during in-core detector motor repair work at Kori #2 NPP. Total dose was 52.09mSv per person.

  26. Results of ALARA program • Tendency in Exposure Dose • Annual dose has not increased (but no. of NPP increased) • Average dose per person & unit have been diminished • Concentrate radiation control & ALARA activity during O/H Exposure dose for all NPPs Exposure dose for PHWR

  27. Conclusions • Atomic law in Korea request actual ALARA implementation • First time, management had a duty to ensure doses were ALARA • KHNP developed the standard ALARA program • Apply lower dose limits & organize stronger members • Successful achievement in dose reduction • Annual total dose has not increased • No. of over-exposure workers has been diminished until 1999 & there was no over-exposure worker till now

  28. Thank you very much for your attention