MyOcean Pre-Operational Readiness Review

MyOcean Pre-Operational Readiness Review. F. A DRAGNA Project Manager. Pre-Operational Readiness Review, Rome, 29 April 2011. P C R. S R R. MyOcean Planning (Stream-1). V1 : System verified & transferred to operations. System developed & integrated. System validated for operations

taariq
Télécharger la présentation

MyOcean Pre-Operational Readiness Review

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MyOceanPre-Operational Readiness Review F. ADRAGNA Project Manager Pre-Operational Readiness Review, Rome, 29 April 2011

  2. P C R S R R MyOcean Planning (Stream-1) V1 : System verified & transferred to operations System developed & integrated System validated for operations & assessed by users Service defined and system designed J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M Ver. Ph. Int. Ph. Validation Phase (Pre-)Operational Phase Definition Phase Design Phase Development Phase Kick Off VARR V2 C D K P P D R P D R VARR POR PRR 2009 2010 2011 • Verification Readiness Review (internal) • Sub systems integrated and first verifications of functionalities and interfaces done • Formal verification phase starts • Pre-operations Readiness Review : V1.1 (internal) • Product, Service and system validated for operation • Product and services assessed by users • Product Critical Review • Requirements defined & analysed • Service strategy & content of V0,V1&V2 services established Verification Readiness Review for V2 • System Requirement Review • System concept defined • Requirements allocated to sub systems • Pre-Operations Review • Operational release progress • Preliminary Design Review (Syst & Service) • Architecture & design defined • Test strategy established • Validation Readiness Review : Launch of V1.0 Service • System verified • Transfer to operations • Validation and qualification starts

  3. Logical process – Live Cycle POR Operations User needs PRR Specification Validation PCRVARR Requirements Verification SRR VRR Preliminary Integration Design PDR Sub-System Sub-Systems Design Workshops Acceptance Workshops Consolidated Design CDKP Developments InternalReviews - ExternalReviews - Activities S1 S2

  4. Project contact point:contact@myocean.eu.orgwww.myocean.eu.org