E163: Laser Acceleration at the NLCTA Goal: Demonstrate the technical feasibility of laser-driven particle acceleration. Stanford University Bob Byer (co-PI), Tomas Plettner SLAC Eric Colby(spokesman), Bob Noble, Bob Siemann (co-PI), Jim Spencer, Dieter Walz

taber
Télécharger la présentation

Photonic band gap structures made by lithography (top) and fiber-drawing (bottom).

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. E163: Laser Acceleration at the NLCTAGoal: Demonstrate the technical feasibility of laser-driven particle acceleration Stanford University Bob Byer (co-PI), Tomas Plettner SLAC Eric Colby(spokesman), Bob Noble, Bob Siemann (co-PI), Jim Spencer, Dieter Walz Ben Cowan, Melissa Lincoln, Chris Sears (students) Photonic band gap structures made by lithography (top) and fiber-drawing (bottom). E. Colby, E163

  2. E163 Layout E163 Counting Room (b. 225) 225 Moved here Summer 2003 Overhead Cable Tray 7 3 N ORION Extension 2005 LASER ROOM Completed 1/05 SHIELDED ENCLOSURE 6 2 Completed 1 NLCTA 4 Add/change equipment inside NLCTA enclosure:March 2004 RF System 5 Oct 2003 E. Colby, E163

  3. E163 Plans August 2006: Complete installation of beamline in Experimental Hall August/September 2006: Internal Readiness Review, including FPSC walk-through Sept/Oct 2006: First experimental runs Oct 2006—March 2009: E163 Experiment Runs No scheduled plans for expanding the experimental hall. E. Colby, E163

  4. Concrete Shielding Enclosure Fire Detection and Alarm System (“Area 2”) Combustible Content: ~200# cabling in trays 30% of signal cables are NOT LSNH ALL remaining cables to be LSNH FF88 to be applied to non-LSNH cables in fire-blocking stripes at 10-20’ intervals Occupancy: 0.5-1.0 FTE per year Structure lifespan: >10 years Construction Cmpltd: 2004 E. Colby, E163

  5. http://www.firefree.com/firefree88.htm FireFree88 Application: 24” long stripes around cable bundle: + At top and bottom of vertical cable tray runs + every ~20 feet of horizontal runs E. Colby, E163

  6. Laser Room Fire Detection and Alarm System (“Area 1”) Combustible Content: ~50# cabling, ~100# books, ~1 liter solvents, 1 rack of electronic equipment Cabling is moderate-to-low density In-duct FP11 detectors on intake and discharge sides of HVAC In-room FP11; horn; strobe Structure lifespan: >10 years Construction cmplt: Feb 2005 E. Colby, E163

  7. E163 Concrete Enclosure Roof Fire Detection and Alarm System (“Area 3”) Combustible Content: ~200# cabling, 7 racks of electronic equipment 30% of signal cables are NOT LSNH ALL remaining cables to be LSNH FF88 to be applied to non-LSNH cables in fire-blocking stripes at 10-20’ intervals Structure lifespan: >10 years Install Cmplt: Summer 2006 Ionization detectors above racks deemed unnecessary given volume of the ambient airspace (~1/2 million cu ft) and existence of ionization detectors on the ceiling. E. Colby, E163

  8. E163 Counting Room (b. 225 Relocated) (“Area 7”) Combustible Content: ~200# cabling 30% of signal cables are NOT LSNH ALL remaining cables to be LSNH FF88 to be applied to non-LSNH cables in fire-blocking stripes at 10-20’ intervals 6 racks of electronic equipment Occupancy: 1.0-1.5 FTE Fire Sprinklers throughout, flow switch connection to FACP at bldg 229. Equipment lifespan: >10 years Relocated, upgraded: 2004 225 E. Colby, E163