50 likes | 170 Vues
This document outlines ongoing negotiations for additional Pb-fiber modules and QT boards for the HCal system, including the acquisition of materials from SVT lab for power management. Key details include a requirement for inventory access, alongside the procurement of scintillator components and PMTs. The project aims to enhance PreShower capabilities with specific detector planes and necessitates additional racks, VME crates, and various cabling solutions. Collaboration with PHENIX and STAR is vital for successful fabrication and deployment in upcoming runs.
E N D
Hcal in Run 12 20 additional Pb-fiber modules - in negotiations with phenix 1 additional QT board - available from U.C.
Hcal in Run 13 80 additional Pb-fiber modules - in negotiations with phenix 4 additional QT boards - need to access inventory Cabling? 2 additional racks - obtained from SVT lab PMT power - mimic current NIM circuit?
PreShower Run 13 2 planes w/ 76 detectors each - scintillator to be purchased - pmts and bases from ? - 5-6 QT boards need to be fabbed - cables ? - 9u VME crates (negotiate w/ star) - MVME 2306 already obtained
Ecal run 13 1700 channels Glass at RHIC supplied by Jlab 54 QT boards – to be fabbed 4 VME (9u) crates Pmtssupplied by Jlab CW bases – to be fabbed - cables?