1 / 31

Open Solar Performance and Reliability Clearinghouse DOE Briefing

Open Solar Performance and Reliability Clearinghouse DOE Briefing. oSPARC September 2013 osparc.sunspec.org. Today’s Presenters. Tom Tansy. John Nunneley. Agenda. Introduction to SunSpec Alliance oSPARC background oSPARC project details How to get involved Questions & Answers.

tahlia
Télécharger la présentation

Open Solar Performance and Reliability Clearinghouse DOE Briefing

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Open Solar Performance and Reliability Clearinghouse DOE Briefing oSPARC September 2013 osparc.sunspec.org

  2. Today’s Presenters Tom Tansy John Nunneley

  3. Agenda • Introduction to SunSpec Alliance • oSPARC background • oSPARC project details • How to get involved • Questions & Answers

  4. Currently Available Specifications Bulk Data Exchange Inverter Finance Risk Assessment Meter Grid Operations InternetVPN Data Store Gateway String Cloud SCADA Module RegulatoryReporting Storage Custom Apps Enviro End-To-End Security, Monitoring & Control Solar Plant Applications

  5. Standards Drive Innovation and Value Value Innovation Performance Cost Complexity Risk

  6. oSPARC & Securitization Background • Part of “Solar Access To Public Capital”initiative • Goal to lower cost of borrowing via standardization and securitization • oSPARC is the actuarial database to assess long-term performance and health of plants

  7. Open Solar Performance and Reliability Clearinghouse - Project Objectives • Establish construct for information exchange • Plant Owners • Banks • Service providers • Define metrics for risk assessment • Critical Measurements & Ratings • Key Performance Indicators • Quality factors • Build network/database of participating solar PV plants • Plants report once per day • Network geographically distributed across U.S. • Anonymized to protect consumers • Provide access to database by financial industry • Assess plant performance and reliability over time • Build confidence in the asset class

  8. Construct for Information Exchange Capital at Favorable Rates Quality PV Plants and Data CAPITAL PROVIDER BORROWER Open Actuarial Database Open Information Access SUPPLIERS

  9. Points of Measurement At PV Plant Inverter PV Array Facility Load Back-Up Energy Storage Utility Grid Source: IEC 61724

  10. oSPARC Implementer’s Guide

  11. Investment Risk Assessment for the U.S. Solar Fleet Portfolio Manager oSPARC Query AnonymizedResults

  12. Open Solar Performance And Reliability Clearinghouse Index (oSPARC) Index Identify best performing plants with highest quality data Measurement Confidence (Data Quality) Measured Performance & Reliability

  13. oSPARC Sample Query

  14. oSPARC Sample Report

  15. Key Performance Indicators

  16. What We Are Asking For? • Your participation in the development process • End-to-end transparency • Pick the right metrics • Comfort that your organization won’t be disadvantaged • Data from power plants

  17. What We Offer In Return • Anonymity • Opportunity to improve system for the overall benefit of the industry • Access to anonymizedresults

  18. What’s In It For You? • Project developer/fleet operator • Access to capital at dramatically lower rates • Equipment manufacturer or service provider • Opportunity to differentiate on quality • Solar industry • Scale up deployment, increase total system quality

  19. Questions and Answers

  20. Thank You Expanding the Solar PV Market Through Data Standards and Interoperability Contact Tom Tansy for more information - tom@sunspec.org - 831-227-1073

  21. Plant Information

  22. Device Information *STC = Standard Test Conditions

  23. Plant Ratings

  24. Plant Electrical Measurements

  25. Array Level Measurements

  26. Other Plant Environmental

  27. Plant Availability and Status

  28. Net Energy Measurements

  29. Plant Performance Calculations

  30. oSPARC Plant Query Parameters Query • Date Range for Report Period • Location Information • Size Range • Equipment Type • Design Parameters Response • AnonymizedReport “Plants Like These” • Key Performance Indicators

More Related