Progress report LE. Plot types supported GUI Prototype: prepIFS GUI triggers LE XML color table support in LE Open Issues. Currently supported plots. Isoline. Currently supported plots. Isofill. Currently supported plots. Isofill (Mollweide). Currently supported plots. Boxfill.

1 / 18

Télécharger la présentation

Progress report LE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript

Playing audio...

  1. Progress report LE • Plot types supported • GUI Prototype: prepIFS GUI triggers LE • XML color table support in LE • Open Issues PRISM WP4a : M&D/DKRZ

  2. Currently supported plots • Isoline PRISM WP4a : M&D/DKRZ

  3. Currently supported plots • Isofill PRISM WP4a : M&D/DKRZ

  4. Currently supported plots • Isofill (Mollweide) PRISM WP4a : M&D/DKRZ

  5. Currently supported plots • Boxfill PRISM WP4a : M&D/DKRZ

  6. Currently supported plots • Vectors PRISM WP4a : M&D/DKRZ

  7. Currently supported plots • Plot styles • Isoline • Isofill (filled contours) • Boxfill • Vector • Overlays • Projections: Linear, mollweide, robinson, polar • Curvilinear (irregular) grids PRISM WP4a : M&D/DKRZ

  8. GUI prototype prepIFS GUI triggers LE: Design • Java Applet • Selection of display parameters • physical quantity • Plot style • Color table • Geographic region • Generates and submits script • Displays graphical output and log file • Web page with thumbnails PRISM WP4a : M&D/DKRZ

  9. GUI Prototype Prototype: prepIFS GUI triggers LE: Current State • Selection of one physical quantity • Display of graphical output: pop-up window PRISM WP4a : M&D/DKRZ

  10. GUI Prototype Prototype: prepIFS GUI triggers LE: Current State • still to be done: • Selection of multiple variables • Support of overlays, vector plots • Remove hard coded paths, file names and URLs • Automatic thumbnail webpage • Time series • Movies • Plots at regular intervals PRISM WP4a : M&D/DKRZ

  11. PRISM WP4a : M&D/DKRZ

  12. PRISM WP4a : M&D/DKRZ

  13. PRISM WP4a : M&D/DKRZ

  14. PRISM WP4a : M&D/DKRZ

  15. PRISM WP4a : M&D/DKRZ

  16. PRISM WP4a : M&D/DKRZ

  17. XML color table support in LE • Example: PRISM WP4a : M&D/DKRZ

  18. Progress report LE • Open Issues • Convention for file names, path names, URLs • If more than 1 timestep in netCDF file • Integration with COCO • COCO based on CDAT3.3 • Curvilinear Grid support requires CDAT4.0 • Time series: 2 D curves, animated GIFs? PRISM WP4a : M&D/DKRZ