In October 2012, a preliminary meeting was held to review EmKey's proposed pipeline project dedicated to transporting natural gas from new shale exploration sites. The planned route spans approximately 75 miles from Morrisville to Windsor, utilizing acquired rights-of-way and previously approved routing by the Public Service Commission (PSC). The project involves a 16” to 24” coated steel pipeline with a maximum pressure of 1400 psi. The process requires collaboration with various approving agencies, including environmental and safety assessments, and aims to notify landowners while preparing the PSC application.
E N D
Outline • Preliminary Meeting to review EmKey’s potential pipeline project • Pipeline Utilization • Transport natural gas from newly developed Shale exploration • Allow access to local municipalities and end users • Route • Anticipated route from Morrisville to Windsor • Estimated length of 75 mile • Plan to utilize ROW acquired from Norse • Incorporate route/approval previously received from PSC • 16” steel pipeline Case 09-T-0499 • Currently reviewing ROW • Type of Pipeline • Currently Engineering for Utilization • Steel Pipeline • Coated steel from 16” to 24” • Pressure rating of approximately 1400 psi • Type of PSC Filing • Article 7 Filing • PSC to be lead agency
Outline • List of necessary approving agencies • PSC • Environmental and Safety • Army Corps of Engineers • River crossings& wetlands • NYS Office of Parks Recreation and Historic Preservation • Archeological studies • Federal and NYSDEC Wetlands • Open and wooded wetland crossings • NYSDOT • Road use and crossings • County • Road use and crossings • Soil and water • Townships • Road use and crossings • NYS Agriculture and Markets • Active fields/crop land • Conservation districts • NYSDEC Soil & Water • SWPPP • SPDES permitting • Taps • Dominion, Tennessee and Millennium • End user taps as feasible • Compression • Currently under evaluation
Outline • Time Line • Review existing ROW • Currently finalizing • Notification to ROW land owners • End of month • Flag and survey route • Possibly start end of month • Select areas • Visual Inspection • Possibly end of month • Prepare PSC application • First or second quarter of 2013 • Installation dependent on permitting and approval of SGEIS • Additional Meetings • PSC will require additional public meetings as part of the application process • Town/County meeting as needed • Comments and Questions