1 / 27

Christ the King Catholic Church Addition 1599 Tunner Drive, Courtenay, BC

Christ the King Catholic Church Addition 1599 Tunner Drive, Courtenay, BC Board Presentation – 09 September 02008. Conceptual Design Meeting No. 08 Review previous conceptual work; Review latest conceptual design work; Concept Design Discussion; Next Steps;.

talor
Télécharger la présentation

Christ the King Catholic Church Addition 1599 Tunner Drive, Courtenay, BC

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Christ the King Catholic Church Addition 09 September 02008 Christ the King Catholic Church Addition 1599 Tunner Drive, Courtenay, BC Board Presentation – 09 September 02008

  2. Christ the King Catholic Church Addition 09 September 02008 • Conceptual Design Meeting No. 08 • Review previous conceptual work; • Review latest conceptual design work; • Concept Design Discussion; • Next Steps;

  3. Christ the King Catholic Church Addition 09 September 02008 • New Conceptual Designs “J & K” • Challenge; • Use vaulted ceiling option • Create a better entrance • Two Entry Options • Slot entry • Side entry

  4. Christ the King Catholic Church Addition 09 September 02008 • New Conceptual Designs “J & K” • After brief design meeting; • Preferred Option K • Side entry

  5. Christ the King Catholic Church Addition 09 September 02008 LOWER FLOOR LEVEL

  6. Christ the King Catholic Church Addition 09 September 02008

  7. Christ the King Catholic Church Addition 09 September 02008 • UPPER • FLOOR • LEVEL • ENTRANCE WIDENING RENOVATIONS TO BE DONE AFTER ADDITION COMPLETED • - NEW ELEVATOR INSTALLED IN LOCATION OF EXISTING STAIR WELL AFTER ADDITION COMPLETED

  8. Christ the King Catholic Church Addition 09 September 02008

  9. Christ the King Catholic Church Addition 09 September 02008

  10. Christ the King Catholic Church Addition 09 September 02008

  11. Christ the King Catholic Church Addition 09 September 02008

  12. Christ the King Catholic Church Addition 09 September 02008

  13. Christ the King Catholic Church Addition 09 September 02008

  14. Christ the King Catholic Church Addition 09 September 02008

  15. Christ the King Catholic Church Addition 09 September 02008

  16. Christ the King Catholic Church Addition 09 September 02008

  17. Christ the King Catholic Church Addition 09 September 02008

  18. Christ the King Catholic Church Addition 09 September 02008

  19. Christ the King Catholic Church Addition 09 September 02008

  20. Christ the King Catholic Church Addition 09 September 02008

  21. Christ the King Catholic Church Addition 09 September 02008

  22. Christ the King Catholic Church Addition 09 September 02008

  23. Christ the King Catholic Church Addition 09 September 02008

  24. Christ the King Catholic Church Addition 09 September 02008

  25. Christ the King Catholic Church Addition 09 September 02008 Concept Evaluation:

  26. Christ the King Catholic Church Addition 09 September 02008 Concept Cost:

  27. Christ the King Catholic Church Addition 09 September 02008 • Next Steps: • Determine Preferred Concept; • Prepare presentation package;

More Related