An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Commercial Issues Yet to open LC for UI payment delays : • TN default in UI & Reactive charges: • CERC order dt 21-10-11 directed TN to liquidate UI dues by 31-10-11 and • imposed a fine of Rs. 1 Lakh • TN cleared the UI dues as on 01-11-11 (~Rs. 75 cr) • TN still to pay ~17.3Crs. for UI of wk 29 and 30 • TN yet to pay the interest of ~ Rs. 1.45 Cr as on 16-09-11

  2. DELAY IN WEEKLY SEM DATA RECEIPT DURING OCT 2011

  3. Time drift report receipt status: ANDHRAPRADESH: No station is sending KARNATAKA: Only Nelamangala sending – not regular TAMILNADU Only Gumdipundi , Hosur & Kuzhithurai sending regularly. PONDICHERRY Resumed sending ISGS STATIONS: NTPC: RSTPS not regular NLC : NLC II and Expansion I not regular. MAPS : Not sending

  4. Data submission for PoC for 2012-13 As per Regulation 16 of PoC regulations: DICs to furnish by 30.11.11 to IA : Changes in Basic Network (format II) Details of LTA (Format IIIA) Forecast Demand / Injection for each season Nodewise MW/MVAr Injection/ drawl for 10 scenarios (format IIIB) YTC data of ISTS elements and RPC certified lines (format I ) Identify Nodal Officer

  5. Mock Exercise for the implementation of the RRF • CERC directed to start mock exercise for the implementation of RRF w.e.f. 01.07.2011. • SLRDC wrote to Beneficiaries on 05-07-11 and 01-08-11 requesting to make arrangements • CERC conducted a workshop on 10-10-11 at Bangalore for the implementation of RRF mechanism • Member, CERC, directed States to give details within 15 days. • Data yet to be received Letter dt.01.08.11 Letter dt.05.07.11

  6. RE Generating Station Details (One time requirement)

  7. Actions to be taken by states States to furnish: • a list of the wind farms and solar farms eligible for RRF provision. • details of Contracts along with contracted price to the concerned RPC and RLDC through the respective SLDC • Forecasting data for wind and solar generation to the concerned SLDC/RLDC and RPC • 15-minute block-wise data of schedule and actual generation from wind farm generation/ Solar Generation plants as recorded in the Special Energy Meters on a weekly basis

  8. Solar Schedules vetting • Solar generators may be advised to give availability of the generator, weather forecasting, solar insolation, season and normal solar generation curve etc. so as to enable SRLDC to vet the Generation schedules

  9. Identify Nodal Officer • Furnish Details of Nodal developer who shall be responsible for coordinating for the collective capacity on behalf of the group of developers on issues like SCADA, metering, scheduling, UI charges, RRF, forecasting data with the concerned SLDC/RLDC. • States to identify a nodal officer for coordinating on the above matters.