This project involves implementing a ventilation monitoring system in three phases. The initial phase in 2012 focuses on technical operations, followed by a phase in 2014+ using the existing HVAC setup with physical separation. The 2015+ phase aims to introduce a new HVAC system, planned to undergo test runs. Existing systems are reliable but may require revision for optimal air sampling quality due to tubing and gas extraction issues. The project also includes the installation of new ventilation stations post-2014. For more details, refer to the presentation template.

tamma
Télécharger la présentation

Ventilation Monitoring Implementation Phases for HVAC System Upgrade

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Ventilation monitoring Tcc8/ecn3 11/07/2012

  2. Implementation • 3 Phases • 2012 Technical run • 2014+ Runwithold HVAC /wphysicalseparation • 2015+ (?) New HVAC

  3. Phase 1: Test Run • New system will not be delivered for 2012 • Use of old (but reliable!) system with differential chamber, mechanical registers and connection to the Area Controller (ARCON)

  4. Gasextraction No rad. releases • UACV1-152 Ventilation ECN3 PV 8700m3/h GV 15300m3/h • UACV1-153 Ventilation GHN-300 PV 3000m3/h GV 4700m3/h • UACV1-154 Ventilation TCC8 PV 5400m3/h GV 8800m3/h

  5. Phase 1: A temporary solution • Quality of samplingmay* not besufficient • Aspiration of air may have to berevised • Long tubing withbends • Short LivedGases: decay in the sampling tube • Particles: Losses in the long straight sections and bends, tubing materialmay not beadequate • Plastic tubing *to becalculated SEE template for presentations

  6. 2014+ Run • New stations (+Bungalow?)