tarmon
Uploaded by
20 SLIDES
387 VUES
200LIKES

METHODS and MATERIALS

DESCRIPTION

METHODS and MATERIALS. Your Second Draft. YOUR SECOND DRAFT. Two copies Teacher edited first draft Logbook Second Draft Checklist

1 / 20

Télécharger la présentation

METHODS and MATERIALS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript

Playing audio...

  1. METHODS and MATERIALS Your Second Draft

  2. YOUR SECOND DRAFT • Two copies • Teacher edited first draft • Logbook • Second Draft Checklist • Includes: Title page, Background info with introductory paragraph (thesis, purpose, eye-catcher), research, and summary paragraph (hypothesis), materials and methods, and Works Cited page.

  3. Materials and Methods • Describe in detail the procedure used to derive your data and observations in PARAGRAPH form. • Someone should be able to read your procedure and replicate it exactly. If it cannot be replicated exactly, you need more detail. • Include a precise description of the sample. • Include any apparatus that was constructed or modified for the study - put extended and detailed explanation in the appendix. List them as Appendix A, Appendix B, etc.

  4. Materials and Methods • Step listings are not acceptable – must be in paragraph form. • Should be in PAST tense. • Should be in PASSIVE voice - YES: The water was added to the plant in 10.0 mL increments. - NO:I added 10.0 mL of water to the plant.

  5. Materials and Methods • Include brand names • Use METRIC measurements • How are you collecting your data and WHAT are you collecting? • Integrate the materials into the procedure. Do not list them separately.

  6. Materials and Methods • What is your control? • Need a sufficient number of trials • No first or second person. No need to say “the researcher”. • Leave no gap after the background summary paragraph.

  7. EXAMPLE - TOMATOES Three types of tomatoes were used. The first consisted of ten small Albertsons® market fresh red ripe plum tomatoes. The second type consisted of ten small plum tomatoes obtained each from ten cans of Hunts All Natural Peeled California Whole Tomatoes®. The third type consisted of ten red small roma tomatoes each from ten cans of Progresso Italian Tomatoes®. Each of the thirty samples were placed in a Krups Mini Food Processor® on puree for fifteen seconds. There was no need to strain the resulting liquid because colorimetric methods were not used.

  8. EXAMPLE - TOMATOES A pH probe and Voltage Plotter III® software designed by Vernier® Software were used and the software was run on an Apple IIg® computer. The pH probe measures pH by relating it to the potential developed between two electrodes when immersed in a solution (Vernier 1). Strong acids are electrolytes meaning they contain ions in solution and electrolytes conduct electric currents (Gould 271). The voltage recorded by the probe is a measure of the hydrogen ion activity (Vernier 1). A pH change of 1.0 unit equals a constant change in voltage (Gould 271). The computer converts the voltage reading to a pH value (Gould 271).

  9. EXAMPLE - TOMATOES The pH probe was calibrated using standard buffers of 4.0 and 7.0 using the calibration built into the software. See Appendix A for more details. Each sample consisted of 75.0mL, was transferred to a 400mL Pyrex® measuring cup and each pH reading was performed for 30 seconds. The probe was held in each sample for 30 seconds prior to the first recorded value to insure a more stable reading. A rinsing of the pH probe and measuring cup in Albertsons® Distilled Water followed each sample run to insure that no tomato puree was left on the apparatus or in the cup. One value was recorded for each sample. All calculations were performed using the software Microsoft Excel® run on a MacIntosh Plus® computer.

  10. EXAMPLE OF APPENDIX Appendix A Calibration of the pH probe Using the calibration built into the software, 1.81 volts was assigned to a pH of 7.0 when the probe was held in the 7.0 buffer solution. A pH of 4.0 was given to 2.61 volts when the probe was held in the 4.0 buffer solution. When a test was run using a 7.0 standard solution, the resulting pH was 7.14 +/-0.01. When a second test was run using the 4.0 pH standard solution, the resulting pH was 4.14+/-0.02.

  11. WHAT I WILL LOOK FOR • Methods and Materials • _____ includes a control • _____ Independent variables are limited • _____ can be replicated exactly • _____ written in layman’s terms • _____ materials: name brand and amount • _____ sufficient number of trials • _____ in paragraph form • _____ Method used to collect data is listed • _____ metric only • _____ past tense

  12. DUE WEDNESDAY • Be sure to make edits from first draft • See your English teacher or me for a thesis revision if you are still unclear. • Fix your works cited page! • Turn in: second draft (two copies), teacher edited first draft, second draft checklist, and your logbook.

  13. PROBLEMS WITH PROJECT PLAN • Started sentences with non-spelled out numbers. • No passive voice • No past tense • Used first person • Missing lots of brand names • Not enough detail.

More Related